15.07.2013 Views

City of Prince George - Snow Disposal at the Lansdowne Road ...

City of Prince George - Snow Disposal at the Lansdowne Road ...

City of Prince George - Snow Disposal at the Lansdowne Road ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY OF PRINCE GEORGE<br />

SNOW DISPOSAL STUDY AT<br />

THE LANSDOWNE ROAD WASTEWATER TREATMENT CENTRE<br />

2.0 OBJECTIVES AND SCOPE<br />

2.1 Objectives<br />

The Terms <strong>of</strong> Reference in <strong>the</strong> RFP contained <strong>the</strong> following objectives:<br />

a) Confirm <strong>the</strong> suitability <strong>of</strong> <strong>the</strong> WWTC as a snow disposal centre for <strong>the</strong> collected snow<br />

from <strong>the</strong> downtown bowl area.<br />

b) Determine <strong>the</strong> snow disposal capacity <strong>of</strong> <strong>the</strong> WWTC.<br />

c) Identify any oper<strong>at</strong>ional concerns for snow disposal <strong>at</strong> <strong>the</strong> WWTC.<br />

d) Analyze <strong>the</strong> net energy balance and net carbon dioxide balance using waste he<strong>at</strong> <strong>at</strong> <strong>the</strong><br />

WWTC versus a separ<strong>at</strong>e melting oper<strong>at</strong>ion downtown.<br />

e) Determine <strong>the</strong> effect on <strong>the</strong> effluent quality and toxicity from snow disposal <strong>at</strong> <strong>the</strong> WWTC.<br />

2.2 Scope <strong>of</strong> Work<br />

As specified in <strong>the</strong> RFP (Appendix 1), <strong>the</strong> scope <strong>of</strong> work was to include but not be limited to <strong>the</strong><br />

following:<br />

a) A general overview and comments on <strong>the</strong> suitability <strong>of</strong> <strong>the</strong> WWTC as a snow disposal<br />

facility, including identific<strong>at</strong>ion <strong>of</strong> issues not specifically included in <strong>the</strong> scope <strong>of</strong> work, but<br />

which should be considered in determining <strong>the</strong> suitability <strong>of</strong> <strong>the</strong> WWTC for disposal <strong>of</strong> <strong>the</strong><br />

snow from <strong>the</strong> downtown bowl area only.<br />

Dayton & Knight Ltd. Page 2-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!