Naz, Antonia Corinthia C and Mario Tuscan N. Naz. 2006. Modeling ...
Naz, Antonia Corinthia C and Mario Tuscan N. Naz. 2006. Modeling ...
Naz, Antonia Corinthia C and Mario Tuscan N. Naz. 2006. Modeling ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Communications 12 500 per mo 6,000.00<br />
Sub-total 595,894.00<br />
Stage 2: Collection <strong>and</strong> Transport<br />
No. of working days per week 7<br />
No. of collection routes 4<br />
No. of shifts per day 1<br />
Ave working hours per shift 8<br />
Ave residual waste collected per week, cu m 153.13 (3 types of wastes)<br />
Ave residual waste collected per collection<br />
day 76.565 cu m<br />
Total Residual waste collected per year, cu.m. 7,693 = 2,331 tons<br />
Cost Items<br />
1. Salaries <strong>and</strong> wages<br />
Units Unit Cost* Total<br />
Foreman, Salary Grade (SG) 15 1 164,671 per person 164,671<br />
Drivers, SG 4 2 102,763 per person 205,526<br />
Laborers, SG 3 4 95,153 per person 380,612<br />
2. Electricity <strong>and</strong> Water 12 2,500 per mo 30,000<br />
3. Rental of collection vehicle 0<br />
4. Fuel, oil, tires, spare parts 641 3,432 per truck trip 2,319,912<br />
5. Vehicle repair <strong>and</strong> maintenance 227,500<br />
6. Building maintenance 12 2,000 per mo 24,000<br />
7. Supplies <strong>and</strong> materials 12 1,800 per mo 24,000<br />
8. Uniforms, protective gear 7 1,000 per person/yr 7,000<br />
9. Communications 12 1,500 per mo 18,000<br />
Sub-total 3,401,221<br />
Stage 3: Waste Disposal Operations <strong>and</strong> Management: Sanitary<br />
L<strong>and</strong>fill<br />
Cost Items<br />
1.Salaries <strong>and</strong> wages<br />
Units Unit Cost* Total<br />
Foreman, SG 15 1 164,671 per person 164,671<br />
Laborers, including Flagman, SG 3 4 95,153 per person 380,612<br />
Security Services 12 15,000 per mo 180,000<br />
2. Placing of soil/earth cover 12 42,500 per mo 510,000<br />
3. Electricity <strong>and</strong> Water 12 3,500 per mo 42,000<br />
4. Road Maintenance 60,000<br />
5. Building maintenance 12 2,000 per mo 24,000<br />
6. Supplies <strong>and</strong> materials 12 1,800 per mo 24,000<br />
7. Uniforms, protective gear 5 1,000 per person 5,000<br />
8. Communications 12 1,200 per mo 14,400<br />
9. Sampling <strong>and</strong> Analysis of Groundwater 4 15,000 per qtr 60,000<br />
10. Leachate collection, treatment <strong>and</strong><br />
disposal<br />
300,000<br />
11. Disposable Field Equipment 10,000<br />
12. Regulatory fees/permits<br />
(includes fees for leachate treatment)<br />
10,000<br />
Sub-total 1,784,683<br />
TOTAL, PhP 5,781,798<br />
TOTAL, USD<br />
Cost Per cu.m.<br />
108,783<br />
PhP 751.61<br />
USD<br />
44<br />
14.14