Naz, Antonia Corinthia C and Mario Tuscan N. Naz. 2006. Modeling ...
Naz, Antonia Corinthia C and Mario Tuscan N. Naz. 2006. Modeling ...
Naz, Antonia Corinthia C and Mario Tuscan N. Naz. 2006. Modeling ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8. Uniforms, protective gear 7 1,000 per person/yr 7,000<br />
9. Communications 12 1,500 per mo 18,000<br />
Sub-total 1,853,895<br />
Stage 3: Waste Disposal Operations <strong>and</strong> Management: Sanitary<br />
L<strong>and</strong>fill<br />
Cost Items Units Unit Cost* Total<br />
1.Salaries <strong>and</strong> wages<br />
Foreman, SG 15 1 164,671 per person 164,671<br />
Laborers, including Flagman, SG 3 4 58,904 per person 235,616<br />
Security Services 12 12,000 per mo 144,000<br />
2. Placing of soil/earth cover 12 25,000 per mo 300,000<br />
3. Electricity <strong>and</strong> Water 12 2,000 per mo 24,000<br />
4. Road Maintenance 50,000<br />
5. Building maintenance 12 2,000 per mo 24,000<br />
6. Supplies <strong>and</strong> materials 12 1,500 per mo 24,000<br />
7. Uniforms, protective gear 5 1,000 per person/yr 5,000<br />
8. Communications 12 1,000 per mo 12,000<br />
9. Sampling <strong>and</strong> Analysis of Groundwater 4 15,000 per qtr 60,000<br />
10. Leachate collection, treatment <strong>and</strong> 300,000<br />
disposal<br />
11. Disposable Field Equipment 10,000<br />
12. Regulatory fees/permits 10,000<br />
(includes fees for leachate treatment)<br />
Sub-total 1,363,287<br />
TOTAL, PhP 3,456,212<br />
TOTAL, USD 65,028<br />
Cost Per cu.m.<br />
PhP 1,040.34<br />
USD 19.57<br />
Cost Per Ton<br />
PhP 3,433.13<br />
USD 64.59<br />
Cost Per HH & BE<br />
PhP 944.84<br />
USD 17.78<br />
Cost Per HH & BE Per Month<br />
PhP 78.74<br />
USD 1.48<br />
Scenario 2<br />
Waste Collector <strong>and</strong> Collection Vehicle Municipal Workers with 6 m 3 Garbage Truck<br />
Waste Segregation at Source Not Required but biodegradables <strong>and</strong> recyclables shall be<br />
brought to the municipal MRF near disposal site<br />
Collection Frequency Once a week<br />
Type/Location <strong>and</strong> Mode of Payment Modified pick-up (along the road) <strong>and</strong> collection points<br />
Modified pick-up (along the road) <strong>and</strong> collection point <strong>and</strong><br />
pay to the barangay treasurer<br />
Stage 1: Waste Segregation <strong>and</strong> Reduction<br />
41