13.07.2013 Views

Hickey-Hydroscience Emails - GridleyLeaks

Hickey-Hydroscience Emails - GridleyLeaks

Hickey-Hydroscience Emails - GridleyLeaks

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Alvin.Davis<br />

From:<br />

'ent:<br />

(0:<br />

Cc:<br />

Subject:<br />

Rob<br />

Dave Dauwalder <br />

Friday, September 16, 2011 2:40 PM<br />

Rob <strong>Hickey</strong><br />

Alvin Davis; Bill Slenter<br />

RE: recommendation<br />

The polishing pond should be the first priority. If Rio Pluma or the City want to try the enzyme, this may help on the<br />

aerated pond.<br />

DAV~D DAUWALDER<br />

Senior Project Manager<br />

HydroScience Engineers IStrategic Water Solutions<br />

10569 Old Placerville Road<br />

Sacramento, CA 95827<br />

T: 916.364.1490 ext. 1371 F: 916.364.1491<br />

www.hydroscience.com<br />

----,--"---.-.---------~---~--.<br />

From: Rob <strong>Hickey</strong> [mailto:mickey@gfidley.ca.us]<br />

Sent: Friday, September 16, 20112:34 PM<br />

To: Dave Dauwalder<br />

Cc: Alvin Davis; Bill Slenter<br />

Subject: RE: recommendation<br />

It would seem that getting the ponds dredged is the best option at this point (?). Should we get both or just the<br />

polishing pond?<br />

Thanks,<br />

Rob<br />

From: Dave Dauwalder [mailto:ddauwalder@hydrosdence.com]<br />

5ent~ Friday, September 16, 2011 12:33 PM<br />

To: Rob <strong>Hickey</strong><br />

Cc: Alvin Davis; Bill Slenter<br />

Subject: recommendation<br />

Rob<br />

Bill just left you a voicemail regarding this recommendation. At this point, Alvin has sufficient documentation to believe<br />

Rio Pluma has violated their discharge permit in the following two major ways:<br />

~ changing the TSS sampler code and accessing the TSS sampler; and<br />

~ collecting and storing TSS samples themselves versus the permit requirement that only the City and certified lab<br />

control the chain of custody<br />

Thus, the data from Rio Pluma is not reliable or valid, as documented in City acquired grab sampling. Routinely, Rio<br />

Pluma has exceeded their discharge limit of 200 mgll for TSS. This week the City has again locked down the sampling<br />

equipment and has taken control of their chain of custody.<br />

In order to protect the City from potential violations of the City's discharge permit and possible fines, we recommend that a<br />

Notice of Violation be issued to Rio Pluma as soon as possible. This will serve three main purposes:<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!