13.07.2013 Views

1 - Hanford Site

1 - Hanford Site

1 - Hanford Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

L"<br />

iteaseplant or type In the unshaded am" only<br />

PIZ eras are spaced for elh. type, he., 11 chnactergnMl.<br />

F<br />

T<br />

FOR OFFICIAL USE ONLY<br />

DA<br />

APPROVED 1. . de<br />

DANGEROUS WASTE PERMIT APPLICATION<br />

V<br />

COMMENTS<br />

DOE/RL-88-21<br />

Double-Shell Tank System<br />

Rev. 8' 10/01/96<br />

Page 1 of 36<br />

1. EPAISTATE LD, NUMBER<br />

w A T e B o o O e g e T<br />

II. FIRST OR REVISED APPLICATION<br />

Place an'X' in the appropriate box in A or B below mark one box only) to indicate whether this is the first app) -ication you an submittin0 for your scll or a revised<br />

is fim know facility's EPA/STATE I.D. Number, or U this is a revisM application, enter you l a plicadon, If this your application and you already your<br />

r facility'a EPAISTATE<br />

I. g . Number k Section 1 above.<br />

A. FIRST APPLICATION (pAraen'X' bslowendpmvido the appropriate ditel<br />

F1 1. EXISTING FACILITY fSoe Instructions for def/nhlen o!'sxlsring' facl/hy, 2. NEW FACILITY /Complete hem below)<br />

Complete item below.! -<br />

FOR NEW FACILITIES,<br />

*FOR EXISTING FACILITIES, PROVIDE THE GATE I. mo, day to yyrl<br />

PROVIDE THE DATE.<br />

0 3 2 2 4 3 Imo. day.yd OPERA-<br />

OPERATION BEGAN OR THE DATE CONSTRUCTION COMIAENCED<br />

the /e/ll<br />

A<br />

(us the years) to<br />

dote constructi<br />

on of the <strong>Hanford</strong> Hd Facility commenced.<br />

EXPECTEDTOBEGIN B. REVISED APPLICATION Ipbce Sn 'X ` below end complete Section I abovS)<br />

M 1. FACILITY HAS AN INTERIM STATUS PERMIT ® 2. FACILITY HAS A FINAL PERMIT<br />

III. PROCESSES - CODES AND CAPACITIES<br />

A: PROCESS CODE - Enter the code from the list of processcodes below that bast describes each process to be used at the facility. Ton lines am provided for antering<br />

codes. If more lines an needed, enter the code(.) In the space provided. If a process will be used that is not Included In the Ila of codas below, then describe the<br />

process /including its design capacityl in the space provided on the IS.ctlon 111-C1.<br />

S. PROCESS DESIGN CAPACITY • For each coda entered In column A entafthe capacity of the process.<br />

1. AMOUNT - Enter the amount.<br />

2. UNIT OFMEASURE - For each amount entered In column 80), enter the code from the list of unit mensurs coder below that describes the unit of measure used.<br />

Only the units of measure that am listed below should be wad.<br />

PROCESS<br />

CESS<br />

CODE<br />

MEASURE FOR PROCESS<br />

DESIGN CAPACITY PROCESS<br />

CESS<br />

CODE<br />

MEASUREI FOR PROCESS<br />

DESIGN CAPACITY<br />

Storage:<br />

Treatment:<br />

CONTAINER Ibarnl, drum, etc)<br />

TANK<br />

WASTE PILE<br />

SURFACE IMPOUNDMENT<br />

Disposal:<br />

INJECTION WELL<br />

LANDFILL<br />

LAND APPLICATION<br />

OCEAN DISPOSAL<br />

SURFACE IMPOUNDMENT<br />

SOi<br />

S02<br />

S03<br />

SO4<br />

DBO<br />

081<br />

D82<br />

D83<br />

0.."<br />

GALLONS OR LITERS<br />

GALLONS OR LITERS<br />

CUBIC YARDS OR<br />

CUBC METERS<br />

GALLONS OR LITERS'<br />

GALLONS OR LITERS<br />

ACRE-FEET tthe volume that<br />

would cover ant San to a<br />

depth of one foal)<br />

OR HECTARE-METER<br />

ACRES OR HECTARES<br />

R O<br />

LITERSPERDA GALLONS OR LITERS<br />

TANK TOt<br />

SURFACE IMPOUNDMENT T02<br />

INCINERATOR T03<br />

OTHER (Use faryhmlcal, chemical, T04<br />

thermalor biological treatment<br />

processes not occurring In tanks,<br />

surface Impoundments or Incineratom.<br />

Describe the ppro pesaac in<br />

the epee. pmvided: Sea,. IIFC.I<br />

GALLONS PER DAY OR<br />

LITERS PER DAY<br />

GALLONS PER DAY OR<br />

LITERS PER DAY<br />

TONS PER HOUR OR<br />

METRIC TONS PER HOUR;<br />

GALLONS PER HOUR OR<br />

LITERS PER HOUR<br />

GALLONS PER DAY OR<br />

LITERS PER DAY<br />

UNIT OF MEASURE<br />

UNIT OF<br />

MEASURE<br />

CODE UNIT Of MEASURE<br />

UNIT OF<br />

MEASURE<br />

CODE UNIT OF MEASURE<br />

UNIT OF<br />

MEASURE<br />

CODE<br />

GALLONS..................... O LITERS PER DAY................ V ACRE-FEET.................... A<br />

LITERS....................... L TONS PER HOUR...... ..... .... D HECTARE-METER ............... F<br />

CUBIC YARDS .................. Y METRIC TONS PER HOUR...... ....W ACRES. .... ..... .......... B<br />

CUBIC METERS........ ......... C GALLONS PER HOUR ............. E HECTARES..... ............... O<br />

GALLONS PER DAY ............... U<br />

LITERS PER HOUR............... H<br />

EXAMPLE FOR COMPLETING SECTION 111 /,hewn In line numbers X-1 and X-1 below): A Isdli y has two stone tanks, am tank an<br />

hold 200 gallons and the other an hold 400 gallons. The fact also has an incinerator that can bum u to 28 Mallon- per hour.<br />

N A.' S<br />

L U LEBS<br />

I M CODE<br />

N B !iron, list<br />

E E above!<br />

8. PROCESS DESIGN CAPACITY<br />

1. AMtlUNT<br />

Itp1Oify)<br />

2 . UNIT<br />

OF MEA•<br />

SURE<br />

(enter<br />

FOR<br />

OFFICIAL<br />

USE<br />

ONLY<br />

N A. PRO•<br />

IL U CESS<br />

I M CODE<br />

l/at<br />

N E BE E above!<br />

B. PROCESS DESIGN CAPACITY<br />

1. AMOUNT<br />

lrpeN<br />

2. UNIT<br />

OF MEA-<br />

SURE<br />

FOR<br />

O FFICIAL<br />

USE<br />

l<br />

R codol R<br />

h farrier<br />

code)<br />

ONLY<br />

X-1 510 2 Soo G B<br />

X-2 T10 3 20 E S<br />

1 S 0 2 124,654,500 L 7<br />

2 T 0 1 124,654,500 V 8<br />

3 9<br />

/ 10<br />

ECL30 - 300 - ECY 030.31 Form 3 Rev. 2184 PAGE 1 OF S CONTINUE ON REVERSE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!