Connected to the Toulouse metropolis<br />

and on the A61 (Toulouse/<br />

Narbonne), the Ariège is becoming<br />

less isolated.<br />

New tourist and economic development<br />

opportunities are opening<br />

in the pools of employment of<br />

Pamiers, Foix, Tarascon… Cross-<br />

Pyrenean exchanges with Spanish<br />

Catalonia via the Tunnel de Puymorens<br />

are facilitated. And beyond,<br />

there are the European links which<br />

are reinforced, particularly the E9<br />

route which connects northern<br />

Europe to Spain and Portugal<br />

A645: The Val d’Aran slip road<br />

directly onto the A64 between<br />

Toulouse and Biarritz<br />

■ This 5 km section is part of the<br />

development programme in the<br />

direction of Spain. Connected to<br />

the A64, it facilitates access to the<br />

mountain resorts in this part of the<br />

Pyrenees.<br />

In <strong>2002</strong>, priority was given to starting<br />

work to construct civil enginee-<br />

Extension of the Network<br />

ring works, including the crossing of<br />

the Garonne (93 m), the reservoir<br />

outlet work (90 m) and the<br />

Toulouse-Bayonne railway line.<br />

In parallel, the ground clearance<br />

work started at both ends of the<br />

construction site on the northern<br />

part of the RN117 at the Garonne,<br />

and to the south along the RD8b. It<br />

is scheduled to be brought into service<br />

for summer 2004.<br />

The Béziers link between the<br />

A9 and the A75<br />

■ This 5 km link, for which <strong>ASF</strong><br />

obtained the concession on March<br />

1, <strong>2002</strong>, makes the direct junction<br />

between the A9 (Orange/Le Perthus),<br />

along the Mediterranean, and<br />

the A75 which climbs towards the<br />

north via Clermont-Ferrand as far as<br />

Paris (A71).<br />

<strong>2002</strong> was basically devoted to the<br />

topographical, hydraulic and geotechnical<br />

surveys. The work is scheduled<br />

to start in autumn 2003 so<br />

that the link can be brought into<br />

service end 2005.<br />

The doubling of the A9 motorway<br />

to lighten traffic congestion<br />

in and around Montpellier<br />

■ <strong>ASF</strong> was appointed, by decree of<br />

the Council of State dated March 1,<br />

<strong>2002</strong>, as concession holder of this<br />

new motorway section whose<br />

declaration of public interest has<br />

not yet been pronounced.<br />

These 19 km of motorway with 2x3<br />

lanes between the east of<br />

Vendargues and the west of Saint-<br />

Jean-de-Védas will improve the<br />

management of motorway traffic<br />

around the city and reinforce its<br />

transport circulation network,<br />

consistent with the project for the<br />

high speed rail line to by-pass<br />

Montpellier.<br />

New concessions: close to 66 km which will contribute<br />

to improving uninterrupted traffic flow<br />

In <strong>2002</strong>, <strong>ASF</strong> integrated four concessions falling in the Group’s historical<br />

geographic area, whose total concession was increased to 3,112 km:<br />

- the doubling of the A9 motorway perpendicular to Montpellier;<br />

- the eastern ring-road of Béziers (A75);<br />

- the doubling of the Ponts de Cé between Sorges and Mur-Erigné (A87);<br />

- the A64/A63 link by the upgraded RD1.<br />

At March 1, 2003, work<br />

had started on 202 km<br />

of new sections spread<br />

over 4 motorways (A20,<br />

A87, A89 and A645).<br />