Extension of the Network<br />
facilitating relations and reducing<br />
the economic and tourist exchanges.<br />
The opening of the Corrèze<br />
theme space at the rest area of the<br />
same name is scheduled for spring<br />
2003.<br />
■ To overcome the technical difficulties<br />
encountered at Saulières,<br />
the A89 has been linked up to the<br />
A20 to the north of Brive, thanks to<br />
a 5 km stretch between the A20 at<br />
St-Pardoux-l’Ortigier and Saint-<br />
Germain-les-Vergnes.<br />
This stretch, created by the Corrèze<br />
Département with <strong>ASF</strong> financing,<br />
will be opened on February 21,<br />
2003 at the same time as the 21 km<br />
Tulle-Est/Saint-Germain-les-<br />
Vergnes section.<br />
■ Out of the remaining 52 km, to<br />
reach Clermont-Ferrand, between<br />
St-Julien Sancy and Combronde,<br />
<strong>ASF</strong> obtained agreement in <strong>2002</strong> to<br />
take early possession in all the communes<br />
and the necessary administrative<br />
authorisations to start the<br />
work. The preliminary ground clearance<br />
work and the construction of<br />
the Sioule viaduct have started. It<br />
should still be brought into service<br />
at end 2005-beginning 2006.<br />
A89 WEST<br />
■ Work continues on the 35 km<br />
which will link Mussidan to<br />
Périgueux. It should be brought<br />
into service beginning 2005.<br />
All the expertise of the <strong>ASF</strong> teams is<br />
necessary for this section which<br />
crosses a particularly complex zone<br />
geotechnically speaking: crossing<br />
overhanging two chalk cliffs, passage<br />
over underground quarries.<br />
In parallel, the upgrading to motorway<br />
standards of the RN89 continues<br />
perpendicular to the<br />
Périgueux by-pass.<br />
■ The 32 km of the Périgueux-<br />
Est/Thenon section will be completed<br />
beginning 2004.<br />
The ground clearance work and the<br />
laying of the subgrade surface were<br />
completed in June <strong>2002</strong>. The<br />
laying of the road surfaces and the<br />
construction of the full lane barrier<br />
of Thenon started in July <strong>2002</strong>. The<br />
southern apron of the viaduct over<br />
the Douime (290 m long) has been<br />
completed: the delivery of the<br />
structure is scheduled for May 2003.<br />
Environment assessment of the Angers/Cholet - A87<br />
To take into account the diversity of the sites encountered, <strong>ASF</strong> has carried out a<br />
highly refined landscape study. Results: architectural projects with a powerful<br />
identity; two remarkable civil engineering works, with a turquoise framework and<br />
dark green ledges (Layon and Hyrôme viaducts), many specific arrangements to<br />
protect the water, wildlife and plant life, the planting of 245,000 plants. The route<br />
was optimized to limit nuisance to those alongside the motorway: however,<br />
acoustic protections have been erected, including 4,300 m of noise protection<br />
earth barricades and a screen some forty metres in length near Angers.<br />