• The pallet carrier delivers the pallet<br />

to the storage bay, where it is<br />

pushed to the rear position.<br />

• The front position is serviced directly<br />

by the pallet carrier.<br />

• If the piece at the rear position is<br />

required, a dual carrier is used for<br />

rapid access.<br />

Each machine is located a different<br />

distance from the pallet carrier. Although<br />

the greatest distance is over<br />

four metres, no time is lost thanks to<br />

a bridging system, also newly engineered,<br />

built into each pallet carrier.<br />

Two standard and two precision setup<br />

loading stations for round and rectangular<br />

pallets are situated outside<br />

the air-conditioned production hall.<br />

A roller shutter separates the two<br />

areas, which are likewise connected<br />

by a pallet transport system. The greatest<br />

distance for each pallet carrier is<br />

80 metres.<br />

The key to the facility's functioning is<br />

the control system. The master computer<br />

controls the logical processes<br />

for the over 20 NC axes, job allocation<br />

to the machines and scheduling<br />

of storage bays. It compiles tool sequence<br />

lists and provides the required<br />

NC programmes.<br />

To be continued<br />

An additional machine – the sixth –<br />

from the adjacent production hall<br />

was connected to the pallet transport<br />

system in late November <strong>2007</strong>.<br />

Further additions may be possible<br />

following structural adjustments.<br />

The engineers, technicians and mechanics<br />

responsible for the design<br />

and implementation of this system<br />

for automatic large-component processing<br />

and feeding of large-component<br />

processing centres have set<br />

a new European standard.<br />