Projects in Belarus Maxim Zubov
Projects in Belarus Maxim Zubov Projects in Belarus Maxim Zubov
Date 21.05.2013 Projects in Belarus Maxim Zubov Siemens Belarus
- Page 2 and 3: Gas Turbine installed Installed / U
- Page 4 and 5: Introduction Subject: 1 x SGT-800 +
- Page 6 and 7: Слайд 5 b1 - Describe the cust
- Page 8 and 9: Opportunity Profile & Compelling Ev
- Page 10 and 11: Current Project Set-Up RUE “Minsk
Date 21.05.2013<br />
<strong>Projects</strong> <strong>in</strong> <strong>Belarus</strong><br />
<strong>Maxim</strong> <strong>Zubov</strong><br />
Siemens <strong>Belarus</strong>
Gas Turb<strong>in</strong>e <strong>in</strong>stalled<br />
Installed / Under<br />
Construction Capacity, MW<br />
Power Generation <strong>in</strong> <strong>Belarus</strong><br />
made by Siemens<br />
Gas Turb<strong>in</strong>e under Construction<br />
852<br />
Grodno<br />
Brest<br />
JSC “GrodnoAzot”, 4xSGT-300<br />
Bereza<br />
Berezovskaya GRES, 2xSGT-700<br />
Berezovskaya GRES, SGT5-4000F<br />
Installed / Under<br />
Construction Capacity, MW<br />
M<strong>in</strong>sk<br />
Soligorsk<br />
Novolukoml<br />
Borisov<br />
M<strong>in</strong>sk TPP-2, 2xSGT-600<br />
879<br />
Vitebsk<br />
Lukomlskaya GRES, SGT5-4000F<br />
Borisov RK-3, SGT-800<br />
Borisov RK-3, SST-400<br />
JSC “<strong>Belarus</strong>kali”,2xSGT-300, 2xSGT-700<br />
JSC “<strong>Belarus</strong>kali”, 2xATP1-G-5537<br />
Mogilev<br />
Mogilev RK-3, 2xSGT-300<br />
Gomel<br />
Steam Turb<strong>in</strong>e <strong>in</strong>stalled<br />
Steam Turb<strong>in</strong>e under Construction<br />
Installed / Under<br />
Construction Capacity, MW<br />
Siemens <strong>Belarus</strong> 2<br />
27
Tender Procedure<br />
Tender Stage Comments<br />
1. Prequalification F<strong>in</strong>ancial and Commercial documentation<br />
Technical details<br />
Detailed reference list<br />
Bid bond<br />
2. Technical Prequalification Phase Technical clarification<br />
3. Price Negotiation Can be several iteration<br />
4. Contract Negotiation Delivery<br />
Customs<br />
Credits loan<br />
Siemens <strong>Belarus</strong> 3
Introduction<br />
Subject: 1 x SGT-800 + on-site services<br />
Location <strong>Belarus</strong>, M<strong>in</strong>sk region, Borisov, Zhod<strong>in</strong>o CHP<br />
Customer and End user RUE “M<strong>in</strong>skenergo”<br />
Fuel S<strong>in</strong>gle; Natural gas<br />
F<strong>in</strong>anc<strong>in</strong>g 80% - International Bank for Reconstruction and Development<br />
20% - RUE “M<strong>in</strong>skenergo”<br />
Partner(s) Siemens RE<br />
Background New GTCC-65 unit shall replace one steam generator (50 t/h) and one hot<br />
water boiler (100 Gcal/h) to enhance plant’s efficiency.<br />
Entry to Order Book Q1 FY 2012<br />
Other Details First tender <strong>in</strong> Jan. 2011. SIT AB submitted SGT-800 <strong>in</strong>door package<br />
budget proposal to Technopromexport (TPE) local EPC. Tender was<br />
declared <strong>in</strong>valid because only TPE submitted its bid.<br />
Current Status Re-Tender is announced. OOO Siemens is requested to submit SGT-800<br />
firm offer EPC<br />
Siemens <strong>Belarus</strong> 4
Customer profile, opportunity profile<br />
and Compell<strong>in</strong>g event<br />
b2<br />
M<strong>in</strong>skenergo is one of SIX regional affiliates of<br />
<strong>Belarus</strong> State Electric Energy Company<br />
(BELENERGO). Each affiliate operates power<br />
generation facilities, grids and district heat<strong>in</strong>g<br />
network located <strong>in</strong> its region respectively.<br />
<strong>Belarus</strong> M<strong>in</strong>istry of Energy<br />
BELENERGO<br />
M<strong>in</strong>skenergo<br />
Mogilevenergo<br />
Grodnoenergo<br />
Vitebskenergo<br />
Gomelenergo<br />
Brestenergo<br />
b1<br />
Siemens <strong>Belarus</strong> 5
Слайд 5<br />
b1 - Describe the customer’s project or application.<br />
- What are the customer’s bus<strong>in</strong>ess objectives for the project?<br />
- What is the total cost and/or budget for the project?<br />
- How does the project affect the customer’s overall bus<strong>in</strong>ess?<br />
- And most importantly what is the compell<strong>in</strong>g event, if any, that means the customer has to buy a GT by a certa<strong>in</strong> date.<br />
barat00p; 14.11.2006<br />
b2 Describe the customer’s bus<strong>in</strong>ess conditions. Include f<strong>in</strong>ance, revenue, profit and key performance <strong>in</strong>dicators. Identify the customer’s major<br />
l<strong>in</strong>es of bus<strong>in</strong>ess, affiliations, products, and markets. Include <strong>in</strong>formation about recent mergers and acquisitions.<br />
barat00p; 14.11.2006
Customer profile, opportunity profile<br />
and Compell<strong>in</strong>g event<br />
Opportunity Profile & Compell<strong>in</strong>g event<br />
BELENERGO and M<strong>in</strong>skenergo activities for power<br />
generation facilities, grids and district heat<strong>in</strong>g network<br />
upgrade are regulated by State Program for Power<br />
System Modernization.<br />
Together with the Governmental support this Program<br />
enjoys f<strong>in</strong>ancial arrangements provided by <strong>in</strong>ternational<br />
f<strong>in</strong>ancial <strong>in</strong>stitutions (World Bank and others).<br />
SIEMENS IP references <strong>in</strong> <strong>Belarus</strong>:<br />
- Grodno Azot (2 x SSC-300x2 <strong>in</strong> operation),<br />
- Belkaliy ( 1xSSC-300, 2xSSC-700 delivery stage)<br />
- Mogilev RK-3 repower<strong>in</strong>g (2 x SGT-300, just selected<br />
with Technoserv AS EPC)<br />
- M<strong>in</strong>sk CHP-2 (2xSGT-600 <strong>in</strong> operation)<br />
- Beresovskaya GRES (2xSGT-700 <strong>in</strong> operations)<br />
Siemens <strong>Belarus</strong> 6
Opportunity Profile & Compell<strong>in</strong>g<br />
Event<br />
Ma<strong>in</strong> project idea is to enhance Zhod<strong>in</strong>o CHP efficiency. New GTCC-65<br />
unit shall replace one steam generator (50 t/h) and one hot water boiler<br />
(100 Gcal/h).<br />
Involvement of the International Bank for Reconstruction and<br />
Development (long term credit for 80% of the project cost for 15 years + 3<br />
years deferr<strong>in</strong>g of payment) substantially <strong>in</strong>creases its feasibility.<br />
Siemens <strong>Belarus</strong> 7
Site Location<br />
Borisov<br />
Zhod<strong>in</strong>o CHP is located <strong>in</strong><br />
Borisov, 80 km North-East<br />
of M<strong>in</strong>sk<br />
Siemens <strong>Belarus</strong> 8
Current Project Set-Up<br />
RUE “M<strong>in</strong>skenergo”<br />
SGT-800 Supply<br />
SIT AB<br />
SОOО<br />
Erection &<br />
Commission<strong>in</strong>g<br />
Supervision + Tra<strong>in</strong><strong>in</strong>g<br />
Siemens <strong>Belarus</strong> 9
Why shall we offer Local Extended<br />
Scope? (For Discussion)<br />
• The Customer needs complete delivery of the ma<strong>in</strong> equipment from GT<br />
supplier (Siemens).<br />
• The Customer is very sensitive to price of equipment.<br />
• Local Extended Scope is a possible way to w<strong>in</strong> the tender due to more<br />
competitive price, DDU delivery, local contract with payments <strong>in</strong> Euro.<br />
• Surgutneftegas considers that local content is easier to ma<strong>in</strong>tenance.<br />
Siemens <strong>Belarus</strong> 10