Project Planning for CIPable Facility 35<br />

FIGURE 6 An orthographic drawing of area containing process and CIP system piping installed in<br />

gray space for ease of maintenance. Source: Courtesy of Genentech, Inc.<br />

in purchasing such equipment from vendors that have the best experience, and<br />

perhaps agood previous track record. It is not advisable to make purchasing<br />

decisions solely on cost which is especially true with CIP equipment.<br />

Spray devices for custom biopharmaceutical or pharmaceutical processes<br />

tanks require spray coverage verification which require custom design of every<br />

spray to ensure coverage of all tank nozzles. Procurement isbest accomplished by<br />

providing the A&E guidance about tank top piping criteria, following the establishment<br />

of nozzle locations for vessel procurement, and then submitting the tank head<br />

drawings with arequest for adesign/fabricate bid from aselected spray ball<br />

vendor. The spray balls can then be sent to the vessel vendor for spray coverage<br />

testing in the tank shop. Neither spray device design nor spray flow rate decisions<br />

can be made by tank fabricators unfamiliar with the total project CIP concept.<br />

Vessels must be sprayed at aspecified flow rate and pressure which is compatible<br />

with the CIP S/R piping design and ensures compliance with cleaning flow velocity<br />

criteria for each tank.<br />

Standardization of pumps, valves, and instrumentation on CIP skids is<br />

beneficial from both procurement and long-term maintenance perspectives. This<br />

can be accomplished by including apreferred component and instrument list with<br />

requests for bids for skids. Consideration of lead time is important and it is<br />

desirable to prioritize deliveries of skids, valve arrays, and transfer panels. Early<br />

procurement ofall CIP equipment will greatly enhance the ability to finish piping