Project Planning for CIPable Facility 27<br />

Downstream CIP<br />

CON pH UV<br />

Buffer PREP Media PREP<br />

Level 3<br />

Buffer hold<br />

Purification<br />

Fermentation<br />

Upstream CIP<br />

CIP skid CIP skid<br />

Harvest<br />

Level 2<br />

Level 1<br />

Centrifuge<br />

Level 0<br />

FIGURE 3 Simplified design schematic showing all equipment cleaned by each of two CIP skids.<br />

The final schematic would define individual circuits. Source: Courtesy of Genentech, Inc.<br />

2. The water requirement for CIP would be 28 gal (106 L) to fill 200 0 of CIP S/R<br />

piping, plus a3-gal (10 L) puddle in aproperly designed vessel with aflat plate<br />

vortex breaker, and approximately 7gal (27 L) to fill 100 ft of 1.5 00 tube.<br />

3. If the CIP skid requires only 20 gal to fill skid piping, heat exchanger, and<br />

solution tank, then the total volume required for each recycle phase of the