30.06.2013 Views

Untitled

Untitled

Untitled

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Index 387<br />

Off skid instrumentation, 129<br />

Operational qualification (OQ), 327<br />

Operations, CIP facility planning<br />

and, 38<br />

OQ. See Operational qualification.<br />

Overhead vapor lines, 284–285<br />

Over-temperature alarm, problems<br />

with, 302<br />

Oxidizing agents, 68<br />

Passivation, 202–210<br />

definition of, 203<br />

pickling, 203–204<br />

process of, 204<br />

repassivation, 206<br />

surface cleanliness, 203<br />

testing of, 206<br />

argon electron spectroscopy<br />

(AES), 206<br />

electron spectroscopy for chemical<br />

analysis (ESCA), 206<br />

scanning electron microscopy<br />

(SEM), 206<br />

variables in, 204<br />

chelants, 205<br />

citric acid, 204–205<br />

mineral acids, 204<br />

welding, 205–206<br />

Performance qualification (PQ), 327<br />

Peristaltic pumps, 231<br />

diaphragm type, 150<br />

Permanent joints, fabrication of, 214<br />

Permissive failure, 299–300<br />

pH level,<br />

treatment of, 318–323<br />

value, 56<br />

Pharmaceutical CIP systems, desirable<br />

criteria, 115–117<br />

Pharmaceutical Inspection Convention,<br />

369–370<br />

Pharmaceutical industry soils in,<br />

54–55<br />

Phosphates, treatment of, 323<br />

Pickling, 203–204<br />

PID. See proportional integral derivative.<br />

Piping circuit, 11–12<br />

Piping design, API processing and, 291<br />

Piping layout, 33–34<br />

Piping systems, 175–193<br />

eductor<br />

[Piping systems]<br />

assisted pumped return flow,<br />

179–180<br />

return flow, 178–179<br />

flow distribution control, 180–187<br />

hydraulic considerations, 191–193<br />

installation considerations, 189–191<br />

integration of, 187–189<br />

pumped return flow, 177–178<br />

return flow motivation, 175–180<br />

slope, 217<br />

top pressure return flow, 180<br />

Piping, flexible, 217–218<br />

Pitting corrosion, 197<br />

Plan commissioning, CIP system, 327–345<br />

Plan commissioning and qualification<br />

functional testing planning, 335–341<br />

requirement review, 328–333<br />

cleaning validation, 328–329<br />

operating parameters, 329<br />

schematics, 329–333<br />

responsible party, 328<br />

test documentation, 341–342<br />

testing execution, 342–345<br />

Plating, 213–214<br />

PLC. See Programmable logic controller<br />

Policy, cleaning validation, 349<br />

Polished finishes, 199–200<br />

types, 200–201<br />

glass beading, 201–202<br />

mechanical, 201<br />

vibratory, 201<br />

Polishes, mechanical, 213<br />

Polishing, cost of, 200<br />

Port arrangements, transfer panels and,<br />

218–219<br />

Portable CIP skid, 114–115<br />

Portable piping systems, 175<br />

Position sensing, valves and, 223<br />

Post-acid rinse, 11<br />

Post-wash rinse, 11<br />

PQ. See Performance qualification<br />

Pressure limitations, 216<br />

Pressure, gas blow and, 81<br />

Prewash rinse, 10<br />

CIP skids, 10<br />

water type, 10<br />

Process applications, mix proof valves,<br />

238–244<br />

Process component addition, 12–12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!