284<br />

Nozzle<br />

Use<br />

A Manway<br />

B Agitator<br />

C CIP/Liquid feed<br />

D Sample dip pipe<br />

E Vapor rizer<br />

F Liquid inlet<br />

G CIP<br />

H Solid charge<br />

I Baffle<br />

J Liquid inlet<br />

K CIP/Liquid feed<br />

FIGURE 3 The 2000-gallon vessel top head.<br />

E<br />

D<br />

F<br />

to assurefull coverage, the need can be alleviated if the nozzle is externally flushed<br />

as part of the line cleaning. Examples of externally flushed nozzles include all<br />

liquid feeds, reflux, and the vapor riser.Shorter neck nozzles are easier to spray and<br />

should be favored in the design stage if they can be fabricated by the vessel vendor.<br />

In the past, the baffle nozzle has been aproblem. Typically,this nozzle must be<br />

cleaned by spray directed from below. This has been addressed by extending the<br />

baffle and inserting aglass-lined instrument tee to allow for CIP fluid to be injected<br />

into the annulus of the baffle/temperature transmitter nozzle temperature transmitter<br />

(TT) and level transmitter (LT) in Figure 2. This approach could be used for<br />

any unflushed nozzle with avertical member inserted into the vessel, such as a<br />

dip pipe.<br />

Condensers<br />

Avertical condenser is shown in Figure 2. Assuming the need for a 200 ft 2<br />

condenser with 174, 3 ⁄ 4 in., tubes to achieve aflushing rate of 5ft/sec would have<br />

required aflow of over 1200 gpm. Clearly, this is not feasible. Even with arate of<br />

1ft/sec, the flow is much greater than that which could be provided by the process<br />

pump. However, ifasingle-pass (i.e., process on tube side) condenser is mounted<br />

vertically, itispossible to introduce CIP liquid at such arate that afalling film is<br />

established in each tube. This film will consistently wet the tube surfaces and sweep<br />

away soil continuously. Asecond smaller spray ball can be used to wet the bottom<br />

tube sheet. This method has proven effective in cleaning reactor condensers. The<br />

individual tubes are treated as small tanks, which need not be filled, to be effectively<br />

wetted and cleaned.<br />

Overhead Vapor Lines<br />

Overhead vapor risers and reactor emergency vent piping can be the largest bore<br />

process piping in abulk pharmaceutical facility. Typical sizes may range from 4to<br />

6in. for a300-gallon vessel to 8to10in. for 2000-gallon reactors. It is not possible to<br />

pressure flush such large diameter lines at rates that would achieve 3to5ft/sec.<br />

G<br />

B<br />

H<br />

C<br />

A<br />

K<br />

I<br />

J<br />

Cerulli

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!