developed. It is hoped that these will allow monitoring of ungulates within an <br />
occupancy framework. Protocols have also been developed for monitoring <br />
Nomascus gibbon within CarBi project sites. <br />
<br />
<br />
Intermediate result 1.4 <br />
On an annual basis as of project start, the effectiveness of the patrolling and <br />
Management Information System (MIST) has been externally verified and validated. <br />
<strong>Progress</strong> <br />
Draft TOR for external evaluator has been developed, and verification is planned for <br />
June 2012 <br />
<br />
Intermediate result 1.5 <br />
By 12 months after project start: MIST and all ranger stations are established and fully <br />
operational. <br />
<strong>Progress</strong> <br />
The MIST systems in the three protected areas in Vietnam (Hue Saola NR, <br />
Quangnam Saola NR and Bach Ma NP) are up and running, but some adaptive <br />
management will be applied to ensure that best practice is established and pursued <br />
with the assistance from the PA and Law Enforcement <strong>Technical</strong> Advisors. <br />
Challenges and solutions <br />
Under the informal internal review by the <strong>Technical</strong> Advisor for the MIST system in <br />
Hue Saola NR, the MIST is showing some obvious errors in the data calibration and <br />
its basic application which, if addressed, will increase the effectiveness and <br />
efficiency of the system significantly. <br />
<br />
It is planned that a MIST expert will be recruited to calibrate and improve the MIST <br />
system in February2012. A CarBi wide Regional Law Enforcement and MIST <br />
Strategy is also being developed to ensure consistency and high quality throughout <br />
the operational domain. <br />
<br />
Intermediate result 1.6 <br />
By 18 months after project start: Management plans for the saola Nature Reserves <br />
have been developed and appraised as well as revised for Bach Ma National Park <br />
respectively. <br />
<br />
Planning towards this intermediate result has been initialized. Management <br />
planning includes functional Zonation and Conservation Needs Assessment. ToR’s <br />
for the management planning and zonation consultants have been drafted and they <br />