AVEC BOARD 2018 GOALS ¢Lower diesel use 25% 1,250,000 gallons 77% of our fuel is used in Wind Class 4+ villages ¢Reduce power plants by 50% Interconnect another 24 villages Wind is 6% of generation capacity 5% of 2011 generation ¢Reduce non-fuel costs by 10% Plant costs, depreciation, interest… Reduced rates 2 cents/kWh
What is AVEC Doing? Installing wind generation – Selawik, Toksook Bay, Kasigluk, Gambell, Savoonga, Hooper Bay, New Stuyahok, Emmonak, Quinhagak, Chevak, Mekoryuk, Shaktoolik… Capturing recovered heat where feasible – More than 40 AVEC locations Building Interties – Toksook Bay to Tununak – Toksook Bay to Nightmute – Brevig Mission to Teller – Developing HVDC concept Welcoming new villages – Nightmute (1998), Teller (2005), Kotlik (2007), Ekwok (2011) Kobuk (2012)
- Page 1 and 2: Power to the People Integrating Win
- Page 3 and 4: SYSTEM INFORMATION ¢ 80 Anchorageb
- Page 5: AVEC’S DELIVERED FUEL COST • Av
- Page 9 and 10: Future Interties Ø St. Michael’s
- Page 11 and 12: Benefits of Integrating Wind Genera
- Page 13 and 14: Nearly all failed. Lack of maintena
- Page 15 and 16: Many of AVEC’s villages are in We
- Page 17 and 18: CURRENT CHALLENGES TO INFRASTRUCTUR
- Page 19 and 20: CURRENT CHALLENGES TO INFRASTRUCTUR
- Page 21 and 22: Transportation Issues
- Page 23 and 24: And here’s the power pole!
- Page 25 and 26: Heavy equipment must be brought in
- Page 27 and 28: CURRENT CHALLENGES TO INFRASTRUCTUR
- Page 29 and 30: Foundation Design Criteria Turbines
- Page 31 and 32: Solutions to Challenges: Dove-taili
- Page 33 and 34: Wind Assessment is critical • Det
- Page 35 and 36: Wind Technicians Are Being Trained
- Page 37 and 38: TRAINING SEVERAL WIND TECHNICIANS K
- Page 39 and 40: Some of the equipment is complex
- Page 41 and 42: Wind Technician Julius Bell adjusti
- Page 43 and 44: THE WORK AND RESULTS ARE REWARDING
- Page 45 and 46: What Alaskans Spend on Energy From
AVEC BOARD 2018 GOALS<br />
¢Lower diesel use 25%<br />
1,250,000 gallons<br />
77% of our fuel is used in Wind Class 4+ villages<br />
¢Reduce power plants by 50%<br />
Interconnect ano<strong>the</strong>r 24 villages<br />
Wind is 6% of generation capacity<br />
5% of 2011 generation<br />
¢Reduce non-fuel costs by 10%<br />
Plant costs, depreciation, interest…<br />
Reduced rates 2 cents/kWh