29.06.2013 Views

Case Studies - Renewable Energy Integration: Power to the ... - EERE

Case Studies - Renewable Energy Integration: Power to the ... - EERE

Case Studies - Renewable Energy Integration: Power to the ... - EERE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Foundations in<br />

Permafrost<br />

• They must not<br />

se,le, /lt or be<br />

upli4ed<br />

• Pile founda/ons<br />

(six <strong>to</strong> eight piles)<br />

may extend 1/3 <strong>to</strong><br />

2/3 <strong>the</strong> height of<br />

<strong>the</strong> <strong>to</strong>wer in<strong>to</strong> <strong>the</strong><br />

ground

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!