Case Studies - Renewable Energy Integration: Power to the ... - EERE
Case Studies - Renewable Energy Integration: Power to the ... - EERE Case Studies - Renewable Energy Integration: Power to the ... - EERE
Roads, water and sewer lines, boardwalks and existing overhead power and phone lines present hurdles
CURRENT CHALLENGES TO INFRASTRUCTURE DEVELOPMENT Special equipment may be needed to install the foundation or pilings. Special equipment, shown here, was required to twist the helical piles into the ground in Kasigluk.
- Page 1 and 2: Power to the People Integrating Win
- Page 3 and 4: SYSTEM INFORMATION ¢ 80 Anchorageb
- Page 5 and 6: AVEC’S DELIVERED FUEL COST • Av
- Page 7 and 8: What is AVEC Doing? Installing wind
- Page 9 and 10: Future Interties Ø St. Michael’s
- Page 11 and 12: Benefits of Integrating Wind Genera
- Page 13 and 14: Nearly all failed. Lack of maintena
- Page 15 and 16: Many of AVEC’s villages are in We
- Page 17 and 18: CURRENT CHALLENGES TO INFRASTRUCTUR
- Page 19 and 20: CURRENT CHALLENGES TO INFRASTRUCTUR
- Page 21 and 22: Transportation Issues
- Page 23 and 24: And here’s the power pole!
- Page 25: Heavy equipment must be brought in
- Page 29 and 30: Foundation Design Criteria Turbines
- Page 31 and 32: Solutions to Challenges: Dove-taili
- Page 33 and 34: Wind Assessment is critical • Det
- Page 35 and 36: Wind Technicians Are Being Trained
- Page 37 and 38: TRAINING SEVERAL WIND TECHNICIANS K
- Page 39 and 40: Some of the equipment is complex
- Page 41 and 42: Wind Technician Julius Bell adjusti
- Page 43 and 44: THE WORK AND RESULTS ARE REWARDING
- Page 45 and 46: What Alaskans Spend on Energy From
Roads, water and sewer lines,<br />
boardwalks and existing overhead power<br />
and phone lines present hurdles