Table of Contents - APTAStandards.com
Table of Contents - APTAStandards.com
Table of Contents - APTAStandards.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4.8.4.5 Peer-to-Peer Clearing and Settlement<br />
ERG APTA Specifications have been developed for the regional system settlement<br />
approach but some <strong>of</strong> the messages could be conceivably used for a peer-peer<br />
settlement<br />
model.<br />
4.8.4.6 Additional Messages<br />
Offered<br />
The following additional messages are <strong>of</strong>fered by the ERG specifications and intended<br />
for card/product activities conducted by customer service personnel.<br />
• Product and e-cash refund<br />
• Product replacement<br />
• Bad Debt settlement<br />
• Issuing reversal<br />
4.8.5 Data Elements<br />
The ERG APTA specifications<br />
cover the data elements supported by the UTFS<br />
Workpackage 1 and are listed in Appendix C. The APTA-002 specification provides the<br />
type definitions for the data elements used in conjunction with the APTA-001<br />
specification.<br />
4.8.6 Message Sequences<br />
The<br />
ERG APTA Specifications do not define message sequences.<br />
4.8.7<br />
Security Requirements<br />
ERG’s approach to message security is to protect each transaction with a MAC,<br />
ensuring that the content and source <strong>of</strong> the transaction can be validated. This<br />
MAC is<br />
applied<br />
over a subset <strong>of</strong> the <strong>com</strong>plete message structure.<br />
4.8.8 Timing and Routing<br />
The ERG APTA Specification s do not define Timing and Routing requirements.<br />
4.8.9 Usability<br />
ERG<br />
provided the specification in its entirety for APTA to use within their APTA UTFS<br />
WP 4 efforts at no cost. It<br />
may be openly reviewed and changed if necessary. However,<br />
ERG prefers that it be not used piecemeal. In case APTA prefers to adapt the<br />
specification in its entirety and submit changes to it, ERG is willing to <strong>of</strong>fer their<br />
internal change process to maintain the central control <strong>of</strong> the document in return for a<br />
fee based on time and materials.<br />
Page 65