ROGI KALYAN SAMITI, DHH, ANGUL

ROGI KALYAN SAMITI, DHH, ANGUL ROGI KALYAN SAMITI, DHH, ANGUL

29.06.2013 Views

All self Attested Copy:- N.B: ROGI KALYAN SAMITI, DHH, ANGUL DOCUMENTS TO BE PRODUCED ALONG WITH APPLICATION 1. Self attested photocopy of supporting documents regarding experience in cleaning. Weightage will be given to those having experience in hospitals of 100 or more beds. 2. Self attested photocopy of Registration Certificate of the farm (Registration under Company act, Registration at IGR, Registration under Society Act). 3. Self attested photocopy of Audit Report of last 3(Three years). 4. Self attested photocopy of EPF, ESI, Service Tax Registration certificates. 5. Self attested photocopy of Labour Office, Angul Registration Certificate, if any. 6. Self attested photocopy of Agreement Paper for showing local office. 7. Money Receipt of RKS, DHH, Angul regarding purchase of the tender paper Or DD of Rs.500/- drawn in favour of RKS, DHH, Angul in case of downloaded documents. 8. An EMD of Rs.10, 000/- in the shape of demand draft in favor of RKS, DHH, Angul. 1. Original documents of the above are required to be submitted at the time of opening of the tender papers failing which tender papers will be rejected. 2. Only those parties, who are able to show all the original documents, will be eligible for the next round i.e. to open the technical bids. 3. Those who obtain minimum 50% of mark in technical bid will qualified for opening the financial bid. Page 6 of 12

Sl. No. ROGI KALYAN SAMITI, DHH, ANGUL ANNEXURE-I Floor Area (Required to be cleaned by Out-Sourcing Agency) Name of Ward Sweeping/wet moping Floor Area in sq.ft. 1 Male, Orthopedic, Infection Ward, Operation Theater 2 Pediatric Ward, FMW, Neo-Natal Ward Wash Basin(Nos.) Page 7 of 12 Bathrooms, Toilets, Urinals (Nos.) Frequency/ Time (Daily) 6500 sq.ft. 2 14 3Times (7A.M-10A.M., 11.30A.M.-12.30 PM 3 P.M.-6 P.M.) 5000sq. ft. 3 6 Do 3 O&G Ward,L.Room2 7000sq. ft. 4 9 Do Ila Ward, Panda 4 L Room OT Seva Sadan 4500sq.ft. 11 14 Do 5 OPD (G &1st Floor ) Laboratory, Emergency, Casualty ART Center 8000 sq.ft. 10 5 Do 6 O/O-CDMO, ADMO (M,FW,PH), RSK, Conference Hall 4000sq.ft. 8 7 Daily twice (Before 9A.M. At 2P.M.

Sl.<br />

No.<br />

<strong>ROGI</strong> <strong>KALYAN</strong> <strong>SAMITI</strong>, <strong>DHH</strong>, <strong>ANGUL</strong><br />

ANNEXURE-I<br />

Floor Area (Required to be cleaned by Out-Sourcing Agency)<br />

Name of Ward Sweeping/wet<br />

moping Floor<br />

Area in sq.ft.<br />

1 Male,<br />

Orthopedic,<br />

Infection<br />

Ward,<br />

Operation<br />

Theater<br />

2 Pediatric<br />

Ward,<br />

FMW,<br />

Neo-Natal<br />

Ward<br />

Wash<br />

Basin(Nos.)<br />

Page 7 of 12<br />

Bathrooms,<br />

Toilets,<br />

Urinals<br />

(Nos.)<br />

Frequency/<br />

Time<br />

(Daily)<br />

6500 sq.ft. 2 14 3Times<br />

(7A.M-10A.M.,<br />

11.30A.M.-12.30 PM<br />

3 P.M.-6 P.M.)<br />

5000sq. ft. 3 6 Do<br />

3 O&G<br />

Ward,L.Room2<br />

7000sq. ft. 4 9 Do<br />

Ila<br />

Ward,<br />

Panda<br />

4<br />

L Room OT<br />

Seva Sadan 4500sq.ft. 11 14 Do<br />

5 OPD<br />

(G &1st Floor )<br />

Laboratory,<br />

Emergency,<br />

Casualty<br />

ART Center<br />

8000 sq.ft. 10 5 Do<br />

6 O/O-CDMO,<br />

ADMO<br />

(M,FW,PH),<br />

RSK,<br />

Conference<br />

Hall<br />

4000sq.ft. 8 7 Daily twice<br />

(Before 9A.M.<br />

At 2P.M.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!