29.06.2013 Views

Greening Mass Transit & Metro Regions: The Final Report - MTA

Greening Mass Transit & Metro Regions: The Final Report - MTA

Greening Mass Transit & Metro Regions: The Final Report - MTA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Materials Flow Working Group Water Management Working Group Climate Adaptation Working Group<br />

■ <strong>The</strong> <strong>MTA</strong> should institute a green<br />

Lifecycle Analysis (LCA) system to<br />

manage materials from procurements<br />

through disposal.<br />

■ <strong>The</strong> <strong>MTA</strong> should introduce sourceseparation<br />

of waste in NYCT subway<br />

stations.<br />

■ <strong>The</strong> <strong>MTA</strong> should enhance its efforts<br />

to reuse and expand markets for its<br />

waste.<br />

■ <strong>The</strong> <strong>MTA</strong> should flex its market<br />

power to promote green goods.<br />

■ <strong>The</strong> <strong>MTA</strong> should seek more revenue<br />

and energy potential from <strong>MTA</strong> waste.<br />

■ <strong>The</strong> <strong>MTA</strong> should encourage the use<br />

of low-carbon local materials by all<br />

<strong>MTA</strong> agencies and vendors.<br />

■ <strong>The</strong> <strong>MTA</strong> should expand the<br />

procurement of sustainable railroad<br />

ties at all rail agencies.<br />

issues on <strong>MTA</strong> capital planning. <strong>The</strong> Commission believes that the <strong>MTA</strong> should have<br />

$75 billion to $100 billion over the course of the next two <strong>MTA</strong> capital plans (2010-<br />

2014 and 2015-2019) to prepare the <strong>MTA</strong> and its service region for a sustainable future.<br />

Investments at these higher levels will help the <strong>MTA</strong> region and the nation weather the<br />

current recession as well as accelerate the region's transition from fossil-fuel dependency<br />

■ <strong>The</strong> <strong>MTA</strong> should identify beneficial<br />

uses for the millions of gallons of<br />

groundwater pumped out of subway<br />

system tunnels.<br />

■ <strong>The</strong> <strong>MTA</strong> should reduce its use<br />

of potable water by up to 75 percent or<br />

more by 2020 by substituting rainwater,<br />

recycling greywater, and/or other<br />

conservation practices.<br />

■ <strong>The</strong> <strong>MTA</strong> should implement<br />

systemwide metering and submetering<br />

to reduce its water consumption.<br />

■ <strong>The</strong> <strong>MTA</strong> should improve water<br />

fixtures and conservation at <strong>MTA</strong><br />

facilities through water efficient designs,<br />

water-saving fixtures, and employee<br />

programs. As the Commission stated<br />

in the interim report, the <strong>MTA</strong> should<br />

encourage the use of local drinking<br />

water by its 70,000 employees to<br />

minimize bottled-water consumption.<br />

■ <strong>The</strong> <strong>MTA</strong> should improve the<br />

efficiency of its vehicle washes<br />

systemwide.<br />

■ <strong>The</strong> <strong>MTA</strong> should develop a climateadaptation<br />

decision matrix to identify<br />

options for protecting transit infrastructure<br />

from storm surge, extreme heat, and<br />

other manifestations of climate change.<br />

■ <strong>The</strong> <strong>MTA</strong> should implement a<br />

Climate Adaptation Resiliency Evaluation<br />

procedure (CARE), which would be<br />

activated when any new projects or<br />

major alterations are undertaken where<br />

critical structural components are<br />

located in present or potential coastal<br />

surge flood zones.<br />

to a low-carbon economy. <strong>The</strong> Commission recommends that all of these capital<br />

expenditures be designed to meet the green standards described in this report. For<br />

projects already designed, any design review or subsequent design iteration should be<br />

carried out in keeping with the recommendations contained in this report.<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!