Prescient presentation - Petmin
Prescient presentation - Petmin
Prescient presentation - Petmin
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SIVAS<br />
• Drilling to commence of main zone using drill rig 1<br />
• Stream sampling to be completed<br />
• ALS analysis of first BH mineralized Listvenite<br />
• Deploy 2 nd drill rig<br />
• Preliminary mineralogy evaluation + lab scale Metallurgical test work<br />
• Secure Forestry and Operating Permits for Phase 2<br />
• New road construction to planned BH positions ~ 3km and Systematic<br />
sampling of Listvenite<br />
• Detailed structural mapping as recommended by EB/MR<br />
• Commence development of planned trenches and sampling<br />
• Obtain ALS results for MZ BH no2, and SEZ BH’s 1,2,3, 4 and 5<br />
• Mine minimum tonnages from Licenses 22013 (800 tons) and 18246 (500<br />
tons)<br />
• Submit requisite reports/documents for extension of Operating License no<br />
18246 for a further 10yrs<br />
• Grab and chip sampling of outcrops with known potential for Cu/Au/Ni<br />
mineralization<br />
• Initial mineralogy study on representative mineralized listvenite samples<br />
• Adit?<br />
54<br />
<br />
September<br />
<br />
<br />
October November December<br />
<br />
<br />
Completed To be completed<br />
To be<br />
completed in<br />
2012<br />
…turning …Committed development to projects growth, …exceeding into dedicated cash generative to expectations<br />
value assets