29.06.2013 Views

Prescient presentation - Petmin

Prescient presentation - Petmin

Prescient presentation - Petmin

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SIVAS<br />

• Drilling to commence of main zone using drill rig 1<br />

• Stream sampling to be completed<br />

• ALS analysis of first BH mineralized Listvenite<br />

• Deploy 2 nd drill rig<br />

• Preliminary mineralogy evaluation + lab scale Metallurgical test work<br />

• Secure Forestry and Operating Permits for Phase 2<br />

• New road construction to planned BH positions ~ 3km and Systematic<br />

sampling of Listvenite<br />

• Detailed structural mapping as recommended by EB/MR<br />

• Commence development of planned trenches and sampling<br />

• Obtain ALS results for MZ BH no2, and SEZ BH’s 1,2,3, 4 and 5<br />

• Mine minimum tonnages from Licenses 22013 (800 tons) and 18246 (500<br />

tons)<br />

• Submit requisite reports/documents for extension of Operating License no<br />

18246 for a further 10yrs<br />

• Grab and chip sampling of outcrops with known potential for Cu/Au/Ni<br />

mineralization<br />

• Initial mineralogy study on representative mineralized listvenite samples<br />

• Adit?<br />

54<br />

<br />

September<br />

<br />

<br />

October November December<br />

<br />

<br />

Completed To be completed<br />

To be<br />

completed in<br />

2012<br />

…turning …Committed development to projects growth, …exceeding into dedicated cash generative to expectations<br />

value assets

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!