26.06.2013 Views

BEMS assisted tools adapted to Initial and Continuous ... - Repository

BEMS assisted tools adapted to Initial and Continuous ... - Repository

BEMS assisted tools adapted to Initial and Continuous ... - Repository

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

<strong>BEMS</strong> <strong>assisted</strong> <strong><strong>to</strong>ols</strong> <strong>adapted</strong> <strong>to</strong><br />

<strong>Initial</strong> <strong>and</strong> <strong>Continuous</strong> Commissioning<br />

Benedicte VIAUD<br />

Proceedings of the Fourth International Conference for Enhanced 1 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

EDF Introduction<br />

Why EDF has decided <strong>to</strong> be involved in Cx<br />

Energy <strong>and</strong> environmental reasons<br />

• Reduction of the energy costs<br />

• Durable development<br />

Malfunctioning of the installations of HVAC more<br />

linked <strong>to</strong> the commissioning process than <strong>to</strong> the<br />

equipments reliability<br />

• Improving the reliability of the electrical HVAC installations<br />

Proceedings of the Fourth International Conference for Enhanced 2 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Mapping of the Cx <strong><strong>to</strong>ols</strong> developed<br />

Data Base of Functional Test Procedures<br />

Au<strong>to</strong>matic Commissioning Tool<br />

• For <strong>Initial</strong> <strong>and</strong> <strong>Continuous</strong> Commissioning<br />

• Conception <strong>and</strong> assessment in a nursery school<br />

Using whole building simulation for improved Cx<br />

• For design phase <strong>and</strong> <strong>Continuous</strong> Commissioning<br />

• Conception <strong>and</strong> assessment in a large <strong>and</strong> complex<br />

commercial building<br />

Proceedings of the Fourth International Conference for Enhanced 3 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


Objective : <strong>to</strong> develop an au<strong>to</strong>matic Cx <strong>to</strong>ol for electrical applications<br />

DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Development of an au<strong>to</strong>matic Cx <strong>to</strong>ol<br />

<strong>and</strong> assessment on a nursery school<br />

Purpose : commissioning of the technical installations <strong>to</strong> check that<br />

the expected performances for comfort <strong>and</strong> energy management have<br />

been reached.<br />

Demonstration site: nursery school<br />

Field Partners<br />

Building owner : Mairie de Crevecoeur-le-Gr<strong>and</strong><br />

<strong>BEMS</strong> supplier : Delta Dore<br />

Operating agent : Industelec<br />

Proceedings of the Fourth International Conference for Enhanced 4 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Nursery school of<br />

Crèvecœur-le-Gr<strong>and</strong><br />

• New building<br />

• 2429 m 2<br />

• 160 pupils<br />

The demonstration site<br />

Proceedings of the Fourth International Conference for Enhanced 5 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


Technical applications managed by the <strong>BEMS</strong><br />

DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

• Heating system : electric heating ceiling panel<br />

• Ventilation<br />

• Mechanical Ventilation System<br />

• Air H<strong>and</strong>ling Units<br />

• Lighting<br />

• Domestic Hot Water<br />

Technical installations<br />

Proceedings of the Fourth International Conference for Enhanced 6 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


Management of power dem<strong>and</strong><br />

<strong>and</strong> energy consumption<br />

- Load shedding<br />

- Sub metering<br />

- Optimisation of power dem<strong>and</strong><br />

according <strong>to</strong> the structure of the<br />

electricity rate (tariff)<br />

DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Minitel<br />

<strong>BEMS</strong> architecture<br />

- Consultation<br />

- Paramétrage<br />

RTC<br />

modem<br />

modem modem<br />

Echanges<br />

à haut débit<br />

Très nombreuses combinaisons possibles<br />

DIN<br />

RS 232<br />

Liaison partagée<br />

Imprimante<br />

Bus N°2 BatiBUS ou<br />

Emetteur CPL pro<strong>to</strong>cole X2D<br />

Proceedings of the Fourth International Conference for Enhanced 7 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

PYRAM 500<br />

RS 232<br />

ou<br />

RS 485<br />

Heating<br />

- Scheduling<br />

- Zoning<br />

- Optimal Start/S<strong>to</strong>p<br />

- Room temperature<br />

control<br />

- Consultation<br />

- Paramétrage<br />

- Acquisition d'his<strong>to</strong>rique<br />

- Supervision<br />

• Emulation Minitel<br />

• Sauvegarde / Restauration<br />

d'une configuration<br />

• Echange des fichiers<br />

his<strong>to</strong>riques format tableur<br />

• Liaison JBUS EUROPTIBAT<br />

avec un superviseur<br />

(16 centrales PYRAM)<br />

Bus N°1 (BatiBUS)<br />

Récepteur fil pilote<br />

2, 3 ou 4 ordres<br />

Secteur 230 / 400 V<br />

Eclairage<br />

Récepteur thermostaté<br />

pour réduit de température<br />

Répéteur<br />

1<br />

1<br />

2<br />

2<br />

de :<br />

E1 E2 E3 E4 E5 E6 E7 E8<br />

ou<br />

Courant<br />

ALIMENTATION STABILISEE PYRAM ARB Gestion des charges électriques<br />

Type tarif IDENTIFICATION PYRAM 12 D Transmission<br />

Module Universel PYRAM 16 X Entrées T/R Entrées analog. Sorties T/R Sorties analog. IDENTIFICATION<br />

Transmission<br />

ALIMENTATION STABILISEE PYRAM ARB<br />

Transmetteur<br />

CPL X2D<br />

Fonctionnement OK Défaut Transmission CPL<br />

Communication Configuration<br />

Réception Emission<br />

Configuration<br />

N° de série<br />

Maître 00<br />

ou<br />

Adresse site<br />

Réémetteur<br />

Etat des entrées logiques / analogiques<br />

= 0 > 0<br />

N°1<br />

N°2 N°3 N°4<br />

MCT 51034<br />

X2D<br />

Alimentation<br />

BatiBUS<br />

- Entrée 24 V pour secours<br />

ET REPETEUR DE TRANSMISSION<br />

- Transmission full duplex<br />

- Isolement des bus sur C.C.<br />

1 F<br />

AUTO<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

0h 2 4 6 8 10 12 14 16 18 20 22 24<br />

2<br />

1<br />

Secteur<br />

PYRAM ARB<br />

Version BatiBUS<br />

F<br />

PYRAM A10<br />

• Pour chauffage<br />

direct<br />

• Fonctionement<br />

par allures<br />

• Témoin de<br />

consommation<br />

+ contact feuillure<br />

Gestion des charges électriques<br />

(délestage intelligent,<br />

courbe de charge ...)<br />

Alim 12V<br />

S3 S4 Voir notice pour correspondance des entrées suivant le tarif Contact<br />

0V<br />

E1 Com E2 E3 Com E4 E5 Com E6 E7 Com E8 E5 E6 E7 E8<br />

1 2 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23<br />

PYRAM 12 D<br />

Edit.1<br />

S1 S2 S3 S4<br />

1<br />

F<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

AUTO<br />

0h 2 4 6 8 10 121416 1820 2224<br />

Version<br />

A<br />

Fonctionnement<br />

normal<br />

PYRAM 12 D<br />

Version BatiBUS<br />

T<br />

PYRAM A11<br />

• Pour chauffage<br />

direct<br />

• Identique au<br />

TC BatiBUS<br />

OK<br />

Lighting, Ventilation<br />

- Scheduling<br />

- Override<br />

- Zoning<br />

DHW<br />

- Scheduling<br />

TC 51039<br />

Récep.<br />

fil<br />

pilote<br />

X2D<br />

Module multi-fonctions<br />

(chauffage, accumulation, ECS,<br />

au<strong>to</strong>matismes, signalisation)<br />

1<br />

2<br />

3<br />

4<br />

AUTO<br />

Froid<br />

Chaud<br />

16 18 20 22 24 26<br />

A30<br />

Version<br />

A<br />

Fonctionnement<br />

normal<br />

PYRAM 16 X<br />

Version BatiBUS<br />

PYRAM A30<br />

• Pour ventilo-<br />

convecteurs<br />

Contacteur<br />

MIB /<br />

TRILOGIE<br />

Signalisation,<br />

bou<strong>to</strong>n poussoir,<br />

comptage<br />

Limitation d'énergie en fonction de la température extérieure<br />

Chauffe - eau<br />

électrique<br />

ECS<br />

- Entrée 24 V pour secours<br />

ET REPETEUR DE TRANSMISSION<br />

- Transmission full duplex<br />

- Isolement des bus sur C.C.<br />

V1 V2 V3<br />

PYRAM A30<br />

Récep.<br />

thermostat<br />

2<br />

1<br />

Secteur<br />

PYRAM ARB<br />

Version BatiBUS<br />

Récepteurs<br />

2 voies<br />

S1 S2<br />

OK OK<br />

ESL-IC-04-10-47<br />

AC 51042<br />

Gestion par<br />

armoire<br />

divisionnaire<br />

TC BatiBUS<br />

Offre multi-constructeur<br />

C<br />

Montée et<br />

descente<br />

d'un volet<br />

roulant<br />

T<br />

v<br />

PAS<br />

PH<br />

Ecla<br />

Thermostat<br />

bi-directionnel<br />

(SAUTER-<br />

THERMOR)<br />

Récepte<br />

2 voie


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Methodology <strong>and</strong> Tool<br />

specifications<br />

Collect of the user needs<br />

Definition of the technical issues<br />

Development of the pro<strong>to</strong>type<br />

• Development of a st<strong>and</strong>-alone<br />

st<strong>and</strong> alone Cx Tool<br />

• Interface with the <strong>BEMS</strong> system through<br />

data logging<br />

• Application of passive testing Cx approach<br />

Iterative with end user<br />

• To assess the <strong>to</strong>ol<br />

• To improve the user interface<br />

Proceedings of the Fourth International Conference for Enhanced 8 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Tool of initial Commissioning<br />

Proceedings of the Fourth International Conference for Enhanced 9 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Step 1 : Building identification<br />

Objective : <strong>to</strong> identify the specific information about the building <strong>and</strong> its<br />

technical description (size, applications, electrical rates, …) in order <strong>to</strong> allow <strong>to</strong><br />

achieve the commissioning tests.<br />

Proceedings of the Fourth International Conference for Enhanced 10 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Step 2 : Manual Commissioning<br />

Objective : <strong>to</strong> check the technical installations (presence, location, cabling of the<br />

sensors <strong>and</strong> actua<strong>to</strong>rs…)<br />

These tests could be done manually. Some checklists are given …<br />

Proceedings of the Fourth International Conference for Enhanced 11 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Step 3 : Cx of the <strong>BEMS</strong> <strong>BEMS</strong><br />

itself<br />

Objective : <strong>to</strong> check the compliance of the functions implemented on the <strong>BEMS</strong> with<br />

the building owner requirements <strong>and</strong> <strong>to</strong> check that the functions operate according <strong>to</strong><br />

the book of specification.<br />

Proceedings of the Fourth International Conference for Enhanced 12 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Step 4 : Optimisation of the building<br />

performances<br />

Objective : <strong>to</strong> optimise the performance of the implemented functions<br />

in term of comfort, energy consumption <strong>and</strong> operating costs.<br />

Proceedings of the Fourth International Conference for Enhanced 13 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Step 5 : Reporting<br />

Objective : <strong>to</strong> report the work of the Commissioning Agent <strong>to</strong> the Building<br />

Owner. It allows <strong>to</strong> follow the Commissioning progress <strong>and</strong> <strong>to</strong> know results.<br />

This document has <strong>to</strong> be updated after each use.<br />

Proceedings of the Fourth International Conference for Enhanced 14 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


- Experience from field tests :<br />

-<br />

DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Example Findings<br />

o Step 1, 1 Building identification : some technical information are missing, missing,<br />

lack of updated documentation,<br />

o Example : power of appliances not available<br />

o Step 2, 2,<br />

Manual Cx : location of part of the installation,<br />

o Example : lack of labelling in the electrical boxes<br />

o Step 3, 3,<br />

Cx of the <strong>BEMS</strong> itself,<br />

o Example : discrepancy between <strong>BEMS</strong> information <strong>and</strong> ventilation operating operating<br />

o Step 4, 4,<br />

Optimisation of the building performance (phase in progress),<br />

o Example : under heating in north zone, non optimal AHU control<br />

o Step 5, 5,<br />

Reporting : users appreciate this step <strong>and</strong> help <strong>to</strong> its<br />

development ; better information on operating of the building <strong>and</strong> <strong>and</strong><br />

transfer<br />

of knowledge between ac<strong>to</strong>rs.<br />

Proceedings of the Fourth International Conference for Enhanced 15 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Example of the <strong>to</strong>ol development issues<br />

Interface with the <strong>BEMS</strong><br />

o Definition of the relevant information needed <strong>to</strong> perform the test tes<br />

o Availability of the information in the logging data base<br />

o Treatment of the missing data<br />

Development of a generic <strong>to</strong>ol<br />

o Checklists <strong>adapted</strong> <strong>to</strong> the description of site<br />

o Interface between <strong>BEMS</strong> <strong>and</strong> the Cx <strong>to</strong>ol<br />

Proceedings of the Fourth International Conference for Enhanced 16 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Example 1<br />

Functional testing of the scheduling<br />

Proceedings of the Fourth International Conference for Enhanced 17 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Example 2<br />

Optimal Start/S<strong>to</strong>p<br />

Proceedings of the Fourth International Conference for Enhanced 18 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47


Conclusion<br />

DDD/AGE n° 04-000TRP<br />

04 000TRP<br />

Conclusion <strong>and</strong> On going work<br />

• <strong>BEMS</strong> <strong>and</strong> Cx procedures improve the operating of medium<br />

size building :<br />

• Cost <strong>and</strong> time effective<br />

• Decrease time dedicated for Tuning <strong>and</strong> TAB<br />

• Improve the comfort <strong>and</strong> energy consumption from the start of the<br />

building occupation<br />

• Manual tests are part of the whole Cx process (risk of<br />

discrepancy between operation <strong>and</strong> <strong>BEMS</strong> information)<br />

Next steps<br />

• Development of the optimisation step<br />

• Iteration process with the final users <strong>to</strong> improve the <strong>to</strong>ol<br />

(Building Owner, Facility Manager, <strong>BEMS</strong> Supplier)<br />

• Expansion of the <strong>to</strong>ol <strong>to</strong> other buildings<br />

Proceedings of the Fourth International Conference for Enhanced 19 Building Operations, Paris, France, Oc<strong>to</strong>ber 18-19, 2004<br />

ESL-IC-04-10-47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!