cover page for test report - Zippy
cover page for test report - Zippy
cover page for test report - Zippy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Issue Date: 2010-01-29 Page 30 of 69 Report Reference # E143756-A26-UL-2<br />
IEC 60950-1:2005<br />
Clause Requirement + Test Result - Remark Verdict<br />
4.6 Openings in enclosures N/A<br />
4.6.1 Top and side openings Mechanical enclosure<br />
evaluated.<br />
See critical component<br />
table/Power<br />
Module/Chassis construction.<br />
Unit intended <strong>for</strong> building-in.<br />
To be evaluated other<br />
enclosures in end product.<br />
Dimensions (mm) .............................................. : See table 1.5.1 -<br />
4.6.2 Bottoms of fire enclosures This equipment is <strong>for</strong> buildingin.<br />
Compliance shall be<br />
evaluated <strong>for</strong> the final system.<br />
Construction of the bottom, dimensions (mm) ...... : No openings -<br />
4.6.3 Doors or <strong>cover</strong>s in fire enclosures N/A<br />
4.6.4 Openings in transportable equipment N/A<br />
4.6.4.1 Constructional design measures N/A<br />
Dimensions (mm) .............................................. : -<br />
4.6.4.2 Evaluation measures <strong>for</strong> larger openings N/A<br />
4.6.4.3 Use of metallized parts N/A<br />
4.6.5 Adhesives <strong>for</strong> constructional purposes N/A<br />
Conditioning temperature (°C), time (weeks) ....... : -<br />
TRF No. IECEN60950_1C Underwriters Laboratories Inc.<br />
N/A<br />
N/A