October 15, 2012 - City of Laredo
October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo
EXHIBIT NO. 2-1 Supplemental No. 1 to the Main Contract - Revised 09/20/2012 ADDITIONAL SCOPE OF SERVICES FOR SUPPLEMENTAL NO. 1 TO THE MAIN CONTRACT - REVISED 09/20/2012 And Related Criteria Used to Develop Additional Scope of Work and Engineering Lump Sum Fee For Additional Construction Management, Inspection Services for the North Laredo (El Pico) Water Treatment Plant (Engineer reserves the right to approach the Client for additional scope and budget if deviations occur from the criteria as listed) Project: City of Laredo Water Utilities Department North Laredo (El Pico) Water Treatment Plant Consulting Engineering Services to include additional construction management, and inspection services for the project due contract additional time extension; increase in complexity and multiple locations being worked at same time and shall include but are not limited to the following: ADDITIONAL CONSTRUCTION MANAGEMENT FOR THE NORTH LAREDO (EL 8010-1 PICO) WATER TREATMENT PLANT Additional Administration for Managing; Document Control and Overseeing of Shop Drawing Review 1 Implementation for El Pico Water Plant Additional Site Visits for El Pico Water Plant Additional Administration for Managing; Document Control and Overseeing of Interpretations and Clarifications for El Pico Water Plant Additional Monthly Contractors Estimate for El Pico Water Plant Additional Administration ; Document Control and Overseeing for Change Orders Additional Project Site Representation (CivilNechanical) for El Pico Water Plant Additional Weekly Meetings for El Pico Water Plant Additional Monthly Presentation(s) for El Pico Water Plant Additional Weekly Meetings with Contractor for El Pico Water Plant Additional Miscellaneous Meetings for El Pico Water Plant Additional Internal Meetings with Site Representative for El Pico Water Plant Additional Administration for Managing; Document Control and Overseeing of Answer Site Representative Questions for El Pico Water Plant Additional Document Control 1 Monitoring of Stored Materials on Hand for El Pico Water Plant PROJECT COMPLETION 1 FINAL ACCEPTANCE FOR THE NORTH LAREDO (EL 8020-1 PICO) WATER TREATMENT PLANT DUE TO SCHEDULE INCREASE Additional Final Inspection for El Pico Water Plant Additional Administration for Managing and Overseeing of Contractor's Final Pay Estimate/Reconciliation for El Pico Water Plant Additional Certificate of Completion for El Pico Water Plant Additional Administration for Managing and Overseeing of Record As Built Drawings Review for El Pico Water Plant ADDITIONAL DIRECT EXPENSES FOR THE NORTH LAREDO (EL PICO) WATER 8030-1 TREATMENT PLANT City of Laredo - Public Utilities Department/ Dannenbaum Engineering Company - Laredo, LLC Supplemental No. 1 to Professional Services Contract - Revised 09/20/2012 - Exhibit No. 2-1 Page 1 of2
EXHIBIT NO. 2-1 Supplemental No. 1 to the Main Contract - Revised 09/20/2012 ADDITIONAL SCOPE OF SERVICES FOR SUPPLEMENTAL NO. 1 TO THE MAIN CONTRACT - REVISED 09/20/2012 And Related Criteria Used to Develop Additional Scope of Work and Engineering Lump Sum Fee For Additional Construction Management, Inspection Services for the North Laredo (El Pico) Water Treatment Plant (Engineer reserves the right to approach the Client for additional scope and budget if deviations occur from the criteria as listed) I. Base Contract Fee ENGINEERING FEE SUMMARY Construction Management, lnspection and Cathodic Protection of 20 MGD Rated Water Surface Treatment Plant A. Basic Services (Refer to Attachment A-1 for Details) Lump Sum Item No. Description Basic Engineering Fee 8010 Construction Management and Engineering $2,036,925.64 8020 Project Completion / Final Acceptance $43,026.64 8030 Direct Expenses / Including Cathodic Protection Services $85,427.56 Base Contract Total Basic Engineering Fee TOTAL BASE CONTRACT FEE $2,165,379.84 II. Supplemental No. 1 - Revised 09/20/2012 to Main Contract dated 06/01/2011 for additional Construction Management and lnspection for El Pico Water Treatment Plant. Refer to Exhibit No. 2-1 for further details. Lump Sum Item No. Description Basic Engineering Fee 8010-1 Additional Construction Management and Inspection (Water Plant) $517,524.02 8020-1 Additional Services Project Completion / Final Acceptance $4,733.44 8030-1 Additional Direct Expenses $16,690.00 Base Contract-Supplemental No. 1 to Main Contract TOTAL REVISED BASE CONTRACT AMOUNT AFTER APPROVAL OF SUPPLEMENTAL NO. 1 - REVISED 09/20/2012 City of Laredo - Public Utilities Department/ Dannenbaum Engineering Company - Laredo, LLC Supplemental No. 1 to ProfessionalServices Contract - Revised 09/20/2012 - Exhibit No. 2-1 Page 2 of 2
- Page 291 and 292: 2016 Mcdonell Laredo Tx. 78040 CURR
- Page 293 and 294: San Luis Rio Colorado, Son. July 19
- Page 295 and 296: Jacaman Road JUAN RAMIREZ INVESTMEN
- Page 297: The bid and bid bonds for Leyendeck
- Page 300 and 301: Affirmative Action Program: Project
- Page 302 and 303: INFORMATION FROM BIDDERS MUST BE CO
- Page 305 and 306: TELEPI-IONE (956)-722-053 1 FAX (95
- Page 307 and 308: TOTAL BASE BID TOTAL BASE BID BID S
- Page 309 and 310: 1 RESTRICTIONS ON LOBBYING CERTIFIC
- Page 311 and 312: POWER OF ATTORNEY Farnlington Casua
- Page 313: DATE: 1011 5/12 COUNCIL COMMUNICATI
- Page 317: DATE: 10/15/12 INITIATED BY: Carlos
- Page 321 and 322: DATE: 10115112 INITIATED BY: Jesus
- Page 323 and 324: Bid Tabulation FY 12-097 Contract L
- Page 325 and 326: DATE: 10/15/12 COUNCIL COMMUNICATIO
- Page 327 and 328: Requested by: Approved by: Approved
- Page 329 and 330: September 20,201 2 DANNENBAUM ENGIN
- Page 331 and 332: additional services and is based on
- Page 333 and 334: EXHIBIT NO. 1-1 REPLACEMENT PAGE AN
- Page 335 and 336: ATTACHMENT "A" Replacement Page (mo
- Page 337 and 338: Date: May 3, 2012 Replacement Page
- Page 339 and 340: ATTACHMENT "D" Replacement Page LIS
- Page 341: Date: Mav , 3.2012 - ATTACHMENT "B"
- Page 345 and 346: DATE: 1 1/05/2012 COUNCIL COMMUNICA
- Page 347 and 348: To: Mr. Dan Migura Human Resources
- Page 349 and 350: 07/15/2011- Lt. Ramon had an MRI of
- Page 351 and 352: Employee . . . . . . . . Authorized
- Page 353 and 354: Date of Iniury: 10/14/2011 Iniuw: C
- Page 355 and 356: CITY OF LAREDO Employee Status Info
- Page 357 and 358: Date of Iniury: 0512 1/20 1 1 Injur
- Page 359: Employee . . . . . . . . Authorized
EXHIBIT NO. 2-1 Supplemental No. 1 to the Main Contract - Revised 09/20/<strong>2012</strong><br />
ADDITIONAL SCOPE OF SERVICES FOR SUPPLEMENTAL NO. 1 TO THE MAIN CONTRACT -<br />
REVISED 09/20/<strong>2012</strong><br />
And Related Criteria Used to Develop Additional Scope <strong>of</strong> Work and Engineering Lump Sum Fee<br />
For Additional Construction Management, Inspection Services for the<br />
North <strong>Laredo</strong> (El Pico) Water Treatment Plant<br />
(Engineer reserves the right to approach the Client for additional scope and budget<br />
if deviations occur from the criteria as listed)<br />
I. Base Contract Fee<br />
ENGINEERING FEE SUMMARY<br />
Construction Management, lnspection and Cathodic Protection <strong>of</strong> 20 MGD Rated Water<br />
Surface Treatment Plant<br />
A. Basic Services (Refer to Attachment A-1 for Details)<br />
Lump Sum<br />
Item No. Description Basic Engineering Fee<br />
8010 Construction Management and Engineering $2,036,925.64<br />
8020 Project Completion / Final Acceptance $43,026.64<br />
8030 Direct Expenses / Including Cathodic Protection Services $85,427.56<br />
Base Contract<br />
Total Basic Engineering Fee<br />
TOTAL BASE CONTRACT FEE $2,165,379.84<br />
II. Supplemental No. 1 - Revised 09/20/<strong>2012</strong> to Main Contract dated 06/01/2011 for<br />
additional Construction Management and lnspection for El Pico Water Treatment Plant.<br />
Refer to Exhibit No. 2-1 for further details.<br />
Lump Sum<br />
Item No. Description Basic Engineering Fee<br />
8010-1 Additional Construction Management and Inspection (Water Plant) $517,524.02<br />
8020-1 Additional Services Project Completion / Final Acceptance $4,733.44<br />
8030-1 Additional Direct Expenses $16,690.00<br />
Base Contract-Supplemental No. 1 to Main Contract<br />
TOTAL REVISED BASE CONTRACT AMOUNT AFTER APPROVAL OF<br />
SUPPLEMENTAL NO. 1 - REVISED 09/20/<strong>2012</strong><br />
<strong>City</strong> <strong>of</strong> <strong>Laredo</strong> - Public Utilities Department/ Dannenbaum Engineering Company - <strong>Laredo</strong>, LLC<br />
Supplemental No. 1 to Pr<strong>of</strong>essionalServices Contract - Revised 09/20/<strong>2012</strong> - Exhibit No. 2-1<br />
Page 2 <strong>of</strong> 2