October 15, 2012 - City of Laredo
October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo
DATE: 10/15/12 INITIATED BY: Carlos Villarreal, City Manager COUNCIL COMMUNICATION SUBJECT: MOTION Consideration to ratify the City Manager's approval of amendment no. 2 an increase of $74,776.05 to the professional services contract with Architects Plus, Inc., to revise previously approved plans and specifications, identifying, investigating, surveying, and documenting partially completed and abandoned improvements for the South Laredo Library Project. Also includes the bidding phase, construction administration phase for the construction completion of this project. Current engineering contract amount with this amendment is $461,934.05. Funding is available in the 2008 C.O. Bond. STAFF SOURCE: Rogelio Rivera, P.E., City Engineer Maria G. Soliz, Library Director PREVIOUS COUNCIL ACTION: On June 22,2009, City Council awarded a professional services contract to Architects Plus, Inc., in the amount of $362,400.00 for the New South Laredo Library Facility. BACKGROUND: The original scope of work included but was not limited to: The location of the project is to be located on an approximately 1.6 acre site at U.S. Hwy. 83 and Palo Blanco in the vicinity of the Cigarroa Park and Freddie Benavides Baseball Field. Based on the City's Request for Qualifications and preliminary calculations as per the Texas Library Standards, the proposed development would more than likely be a 20,000 sq. ft. two story building with on-site parking incorporation "Green" features. In addition, the project will provide "Additional Services' to include, color renderings, power point and presentation drawings, civil engineering services, library consulting services, environmental "green" consultant services, lighting, landscaping and irrigation design services. This amendment no. 2 is to revise previously approved plans and specifications identifying, investigating and surveying and documenting partially completed and abandoned improvements. This amendment includes to re-solicit bids, provide award recommendation, and construction administration services for the construction completion of this project. Original engineering contract amount.. ..................................................... $362,400.00 (Approved by City Council on June 22,2009) Amendment No. 1.. ............................................................................ $24,758.00 (Approved by City Manager on February 28,201 1) Building program required revisions to accommodate multiple site constraints, including multiple land parcels, severe grade elevations and limited on-site utilities, the final design required additional structural, below-grade waterproofing and site details, including off-site utility improvements and an underground boring connection crossing US Hwy. 83 resulting in higher design and construction costs. This amendment no. 2 ........................................................................... $74,776.05 Current engineering contract amount.. ........................................................ $46 1,934.05 FINANCIAL IMPACT: Funding is available in the 2008 C.O. Bond. Account No. 463-9854-535-9571 COMMITTEE RECOMMENDATION: Approved by the Operations Committee on Tuesday, October 9,201 2, and by the Finance Committee on Wednesday, October 10,20 12. STAFF RECOMMENDATION: Approval of Motion.
- Page 266 and 267: Western Surety Company POWER OF ATT
- Page 268 and 269: CDBG Sidewalks Project No.43 (25.5
- Page 270 and 271: DATE: 10/15/12 INITIATED BY: Carlos
- Page 273 and 274: LLC CDBG SIDEWALKS PROJECT #42 - 23
- Page 275 and 276: Itiformation to Contractors Page 2
- Page 277 and 278: STATEMENT OF !#iMTIEIIRI[&S AND OTm
- Page 279 and 280: Proposal Page 2 of 9 AFFIDAVIT Form
- Page 281 and 282: Proposal CITY OF LAREDO CDBG SIDEWA
- Page 283 and 284: Proposal Page 6 of 9 Cumnt Worldoad
- Page 285 and 286: BID BOND KNOW ALL MEN BY THESE PRES
- Page 287 and 288: SureTec lnsurance Company THIS BOND
- Page 289 and 290: SureTec Insurance Company LIMITED P
- Page 291 and 292: 2016 Mcdonell Laredo Tx. 78040 CURR
- Page 293 and 294: San Luis Rio Colorado, Son. July 19
- Page 295 and 296: Jacaman Road JUAN RAMIREZ INVESTMEN
- Page 297: The bid and bid bonds for Leyendeck
- Page 300 and 301: Affirmative Action Program: Project
- Page 302 and 303: INFORMATION FROM BIDDERS MUST BE CO
- Page 305 and 306: TELEPI-IONE (956)-722-053 1 FAX (95
- Page 307 and 308: TOTAL BASE BID TOTAL BASE BID BID S
- Page 309 and 310: 1 RESTRICTIONS ON LOBBYING CERTIFIC
- Page 311 and 312: POWER OF ATTORNEY Farnlington Casua
- Page 313: DATE: 1011 5/12 COUNCIL COMMUNICATI
- Page 319: DATE: 10/15/12 INITIATED BY: Carlos
- Page 322 and 323: DATE: 10/15/12 INITIATED BY: Horaci
- Page 324 and 325: Bid Tabulation FY12-097 Contract La
- Page 326 and 327: City of Laredo Utilities Department
- Page 328 and 329: DATE: 1011 511 2 COUNCIL COMMUNICAT
- Page 330 and 331: STATE OF TEXAS COUNTY OF WEBB CITY
- Page 332 and 333: IN WITNESS WHEmOF, the City of Lare
- Page 334 and 335: ATTACHMENT "A" Replacement Page (mo
- Page 336 and 337: Dannenbaum Engineering Company - La
- Page 338 and 339: ATTACHMENT "D" Replacement Page LIS
- Page 340 and 341: Dannenbaum Engineering Company - La
- Page 342 and 343: EXHIBIT NO. 2-1 Supplemental No. 1
- Page 344 and 345: "EXHIBIT NO. 2-1" Preoared , --,. b
- Page 346 and 347: DATE: 1011 511 2 I COUNCIL COMMUNIC
- Page 348 and 349: liftlcany objects more than 10 lbs,
- Page 350 and 351: le employee has not been released t
- Page 352 and 353: DATE: 1011 511 2 COUNCIL COMMUNICAT
- Page 354 and 355: 1/02/2012 -Dr. Jaramillo reports pl
- Page 356 and 357: DATE: 1011 511 2 PREVIOUS COUNCIL A
- Page 358 and 359: 11/23/2011 - Sgt. Flores is examine
DATE:<br />
10/<strong>15</strong>/12<br />
INITIATED BY:<br />
Carlos Villarreal,<br />
<strong>City</strong> Manager<br />
COUNCIL COMMUNICATION<br />
SUBJECT: MOTION<br />
Consideration to ratify the <strong>City</strong> Manager's approval <strong>of</strong> amendment no. 2 an increase <strong>of</strong> $74,776.05 to the<br />
pr<strong>of</strong>essional services contract with Architects Plus, Inc., to revise previously approved plans and<br />
specifications, identifying, investigating, surveying, and documenting partially completed and<br />
abandoned improvements for the South <strong>Laredo</strong> Library Project. Also includes the bidding phase,<br />
construction administration phase for the construction completion <strong>of</strong> this project. Current engineering<br />
contract amount with this amendment is $461,934.05. Funding is available in the 2008 C.O. Bond.<br />
STAFF SOURCE:<br />
Rogelio Rivera, P.E., <strong>City</strong> Engineer<br />
Maria G. Soliz, Library Director<br />
PREVIOUS COUNCIL ACTION:<br />
On June 22,2009, <strong>City</strong> Council awarded a pr<strong>of</strong>essional services contract to Architects Plus, Inc., in the amount <strong>of</strong><br />
$362,400.00 for the New South <strong>Laredo</strong> Library Facility.<br />
BACKGROUND:<br />
The original scope <strong>of</strong> work included but was not limited to:<br />
The location <strong>of</strong> the project is to be located on an approximately 1.6 acre site at U.S. Hwy. 83 and Palo Blanco in the vicinity<br />
<strong>of</strong> the Cigarroa Park and Freddie Benavides Baseball Field. Based on the <strong>City</strong>'s Request for Qualifications and preliminary<br />
calculations as per the Texas Library Standards, the proposed development would more than likely be a 20,000 sq. ft. two<br />
story building with on-site parking incorporation "Green" features. In addition, the project will provide "Additional Services'<br />
to include, color renderings, power point and presentation drawings, civil engineering services, library consulting services,<br />
environmental "green" consultant services, lighting, landscaping and irrigation design services.<br />
This amendment no. 2 is to revise previously approved plans and specifications identifying, investigating and surveying and<br />
documenting partially completed and abandoned improvements. This amendment includes to re-solicit bids, provide award<br />
recommendation, and construction administration services for the construction completion <strong>of</strong> this project.<br />
Original engineering contract amount.. ..................................................... $362,400.00<br />
(Approved by <strong>City</strong> Council on June 22,2009)<br />
Amendment No. 1.. ............................................................................ $24,758.00<br />
(Approved by <strong>City</strong> Manager on February 28,201 1)<br />
Building program required revisions to accommodate multiple<br />
site constraints, including multiple land parcels, severe grade<br />
elevations and limited on-site utilities, the final design required<br />
additional structural, below-grade waterpro<strong>of</strong>ing and site details,<br />
including <strong>of</strong>f-site utility improvements and an underground boring<br />
connection crossing US Hwy. 83 resulting in higher design and<br />
construction costs.<br />
This amendment no. 2 ........................................................................... $74,776.05<br />
Current engineering contract amount.. ........................................................ $46 1,934.05<br />
FINANCIAL IMPACT:<br />
Funding is available in the 2008 C.O. Bond.<br />
Account No. 463-9854-535-9571<br />
COMMITTEE RECOMMENDATION:<br />
Approved by the Operations Committee on Tuesday,<br />
<strong>October</strong> 9,201 2, and by the Finance Committee on<br />
Wednesday, <strong>October</strong> 10,20 12.<br />
STAFF RECOMMENDATION:<br />
Approval <strong>of</strong> Motion.