DATE:<br />
10/<strong>15</strong>/12<br />
INITIATED BY:<br />
Carlos Villarreal,<br />
<strong>City</strong> Manager<br />
COUNCIL COMMUNICATION<br />
SUBJECT: MOTION<br />
Consideration for approval <strong>of</strong> amendment no. 2 an increase <strong>of</strong> $139,200.00 to the pr<strong>of</strong>essional<br />
services contract with URS Corporation, Dallas, Texas, in association with Metaform Studio<br />
Architects, <strong>Laredo</strong>, Texas, and Synergy Structural Engineers, <strong>Laredo</strong>, Texas, for construction<br />
phase services for the <strong>Laredo</strong> International Airport Rescue and Fire Fighting Station. Current<br />
engineering contract amount with the amendment is $558,920.34. Funding is available in the<br />
Airport Construction Fund FAA Grant No. 73.<br />
STAFF SOURCE:<br />
Rogelio Rivera, P.E., <strong>City</strong> Engineer<br />
Jose L. Flores, Airport Manager<br />
PREVIOUS COUNCIL ACTION:<br />
On February 6,<strong>2012</strong>, <strong>City</strong> Council approved amendment no. 1 an increase <strong>of</strong> $345,014.85 to the pr<strong>of</strong>essional<br />
services contract with URS Corporation, Dallas, Texas, for the design, preparation <strong>of</strong> plans and specifications and<br />
construction phase services for the Airport Rescue and Fire Fighting Station at the <strong>Laredo</strong> International Airport.<br />
BACKGROUND:<br />
Original scope <strong>of</strong> work includes:<br />
Architectural and BuildingISite Engineering for a new 14,400 gross square-foot (GSF) Aircraft Rescue and<br />
Firefighting Station (ARFF), and a 1,400 gross square-foot Operations/Command Center, on a two-acre site south<br />
<strong>of</strong> the existing LRD Terminal Building. The project will consist <strong>of</strong> a <strong>15</strong>,800 GSF two-story<br />
building housing ARFF vehiclelapparatus bays, pump room, watchlalarm room, medical<br />
decontamination, gear wash, equipment storage, ARFF administration rooms, command center, tool<br />
and equipment rooms, staff day room, dormitories, locker rooms, lavatories, kitcheddining, and rooms<br />
for mechanical and electrical building services, with communications equipment. The site features will<br />
include ARFF vehicle parking and circulation aprons, employee and visitor parking, exterior patio and<br />
generator pads, storm drainage, sanitary, water, natural gas and electrical services, fencing, and<br />
landscaping. A new roadway will connect the ARFF site to the Terminal area. The preliminary opinion <strong>of</strong><br />
probable construction cost for this project is $3.8 million, including $400,000 in site and roadway<br />
development. The estimated building cost is $3.4 million, including $300,000 for the<br />
operationslcornmand center. The project shall be designed in accordance with the approved Airport Layout Plan<br />
(ALP) as amended, and applicable FAA Advisory Circulars current on the date <strong>of</strong> execution <strong>of</strong> this<br />
agreement.<br />
This amendment no. 2 is for the construction phase services.<br />
Original engineering contract amount.. ............................................ $74,705.49<br />
(Approved by <strong>City</strong> Council on May 16,201 1)<br />
Amendment no. 1.. .................................................................... $345,0 14.85<br />
(Approved by <strong>City</strong> Council on February 6,<strong>2012</strong>)<br />
For the design, preparation <strong>of</strong> plans and specifications.<br />
This amendment no. 2.. .............................................................. $139,200.00<br />
Current engineering contract amount.. ............................................. $558,920.34<br />
FINANCIAL IMPACT:<br />
Funding is available in the Airport Construction Fund FAA Grant No. 73.<br />
Account No. 433-3603-585-9301<br />
COMMITTEE RECOMMENDATION:<br />
The Airport Advisory Board is scheduled to consider this<br />
item for approval on <strong>October</strong> 9,<strong>2012</strong>. Approved by the<br />
Operations Committee on Tuesday, <strong>October</strong> 9,<strong>2012</strong>, and<br />
by the Finance Committee on Wednesday, <strong>October</strong> 10,<br />
<strong>2012</strong>.<br />
STAFF RECOMMENDATION:<br />
Approval <strong>of</strong> Motion.