October 15, 2012 - City of Laredo
October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo
e ST PAUL TRAVELERS IMPORTANT NOTICE TO OBTAIN INFORMATTON OR MAKE A COMPLATNT: You may contact Travelers Casualty & Surety Company of America, Travelers Casualty & Surety Company, Travelers Indemnity Company, Standard Fire Insurance Company and/or Farmington Casualty Company for information or to make a complaint at: Travelers Bond Attn: Claims 1500 Market Street West Tower, Suite 2900 Philadelphia, PA 19102 (267) 675-3057 (267) 675-3 102 Fax You may contact the Texas Department of Insurance to obtain the information on companies, coverages, rights or complaints at: Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not become a part or a condition of the attached document and is given to comply with Section 2253-021, Government Code, and Section 53.202, Property Code, effective September 1,2001.
DATE: 1011 5/12 COUNCIL COMMUNICATION SUBJECT: MOTION Consideration for approval to award a professional services contract to Terracon Consultants, Inc., Laredo, Texas, for an amount of $47,260.00 to provide laboratory, sampling and testing services of materials for quality assurance for the Laredo International Airport Aircraft Rescue and Fire Fighting Station. Contract time is for the duration of the project. Completion date is scheduled for October 2013. Funding is available in the Airport Construction Fund FAA Grant No. 73. 1NITIATED BY: Carlos Villarreal, City Manager PREVIOUS COUNCIL ACTION: None. STAFF SOURCE: Rogelio Rivera, P.E., City Engineer Jose L. Flores, Airport Manager BACKGROUND: The professional services contract is to provide laboratory, sampling and testing services of materials for quality assurance during the construction of the Laredo International Airport Aircraft Rescue and Fire Fighting Station. Fee breakdown is as follows: Earthwork/soils testing.. ......................................................... $20,830.00 Foundation observation.. ......................................................... $1,800.00 Concrete testing.. ................................................................. $1 1,000.00 Masonry testing.. .................................................................. $1,920.00 Asphalt concrete testing.. ........................................................ $2,190.00 Structural steel observations.. ................................................... $3,520.00 Project management. .............................................................. $6,000.00 Total Fee.. .......................................................................... $47,260.00 Contract time is for the duration of the project. Completion date is scheduled for October 2013. All testing fees will be in accordance with the number of tests and testing requested and the fee may be increased or decreased however any changes in the contract will be addressed by a separate amendment to the contract. FINANCIAL IMPACT: Funding is available in the Airport Construction Fund FAA Grant No. 73. Account No. 433-3603-585-9301 COMMITTEE RECOMMENDATION: On September 18,2012 the Airport Advisory Board considered this item and recommends approval. Approved by the Operations Committee on Tuesday, October 9,2012, and by the Finance Committee on Wednesday, October 10,20 12. STAFF RECOMMENDATION: Approval of Motion.
- Page 262 and 263: Item No, 2 3 4 5 6 Eslimated Quanti
- Page 264 and 265: Proposed Progress Schedules: +J, E
- Page 266 and 267: Western Surety Company POWER OF ATT
- Page 268 and 269: CDBG Sidewalks Project No.43 (25.5
- Page 270 and 271: DATE: 10/15/12 INITIATED BY: Carlos
- Page 273 and 274: LLC CDBG SIDEWALKS PROJECT #42 - 23
- Page 275 and 276: Itiformation to Contractors Page 2
- Page 277 and 278: STATEMENT OF !#iMTIEIIRI[&S AND OTm
- Page 279 and 280: Proposal Page 2 of 9 AFFIDAVIT Form
- Page 281 and 282: Proposal CITY OF LAREDO CDBG SIDEWA
- Page 283 and 284: Proposal Page 6 of 9 Cumnt Worldoad
- Page 285 and 286: BID BOND KNOW ALL MEN BY THESE PRES
- Page 287 and 288: SureTec lnsurance Company THIS BOND
- Page 289 and 290: SureTec Insurance Company LIMITED P
- Page 291 and 292: 2016 Mcdonell Laredo Tx. 78040 CURR
- Page 293 and 294: San Luis Rio Colorado, Son. July 19
- Page 295 and 296: Jacaman Road JUAN RAMIREZ INVESTMEN
- Page 297: The bid and bid bonds for Leyendeck
- Page 300 and 301: Affirmative Action Program: Project
- Page 302 and 303: INFORMATION FROM BIDDERS MUST BE CO
- Page 305 and 306: TELEPI-IONE (956)-722-053 1 FAX (95
- Page 307 and 308: TOTAL BASE BID TOTAL BASE BID BID S
- Page 309 and 310: 1 RESTRICTIONS ON LOBBYING CERTIFIC
- Page 311: POWER OF ATTORNEY Farnlington Casua
- Page 317: DATE: 10/15/12 INITIATED BY: Carlos
- Page 321 and 322: DATE: 10115112 INITIATED BY: Jesus
- Page 323 and 324: Bid Tabulation FY 12-097 Contract L
- Page 325 and 326: DATE: 10/15/12 COUNCIL COMMUNICATIO
- Page 327 and 328: Requested by: Approved by: Approved
- Page 329 and 330: September 20,201 2 DANNENBAUM ENGIN
- Page 331 and 332: additional services and is based on
- Page 333 and 334: EXHIBIT NO. 1-1 REPLACEMENT PAGE AN
- Page 335 and 336: ATTACHMENT "A" Replacement Page (mo
- Page 337 and 338: Date: May 3, 2012 Replacement Page
- Page 339 and 340: ATTACHMENT "D" Replacement Page LIS
- Page 341 and 342: Date: Mav , 3.2012 - ATTACHMENT "B"
- Page 343 and 344: EXHIBIT NO. 2-1 Supplemental No. 1
- Page 345 and 346: DATE: 1 1/05/2012 COUNCIL COMMUNICA
- Page 347 and 348: To: Mr. Dan Migura Human Resources
- Page 349 and 350: 07/15/2011- Lt. Ramon had an MRI of
- Page 351 and 352: Employee . . . . . . . . Authorized
- Page 353 and 354: Date of Iniury: 10/14/2011 Iniuw: C
- Page 355 and 356: CITY OF LAREDO Employee Status Info
- Page 357 and 358: Date of Iniury: 0512 1/20 1 1 Injur
- Page 359: Employee . . . . . . . . Authorized
DATE:<br />
1011 5/12<br />
COUNCIL COMMUNICATION<br />
SUBJECT: MOTION<br />
Consideration for approval to award a pr<strong>of</strong>essional services contract to Terracon Consultants,<br />
Inc., <strong>Laredo</strong>, Texas, for an amount <strong>of</strong> $47,260.00 to provide laboratory, sampling and testing<br />
services <strong>of</strong> materials for quality assurance for the <strong>Laredo</strong> International Airport Aircraft Rescue and<br />
Fire Fighting Station. Contract time is for the duration <strong>of</strong> the project. Completion date is<br />
scheduled for <strong>October</strong> 2013. Funding is available in the Airport Construction Fund FAA Grant<br />
No. 73.<br />
1NITIATED BY:<br />
Carlos Villarreal,<br />
<strong>City</strong> Manager<br />
PREVIOUS COUNCIL ACTION:<br />
None.<br />
STAFF SOURCE:<br />
Rogelio Rivera, P.E., <strong>City</strong> Engineer<br />
Jose L. Flores, Airport Manager<br />
BACKGROUND:<br />
The pr<strong>of</strong>essional services contract is to provide laboratory, sampling and testing services <strong>of</strong> materials for<br />
quality assurance during the construction <strong>of</strong> the <strong>Laredo</strong> International Airport Aircraft Rescue and Fire Fighting<br />
Station.<br />
Fee breakdown is as follows:<br />
Earthwork/soils testing.. ......................................................... $20,830.00<br />
Foundation observation.. ......................................................... $1,800.00<br />
Concrete testing.. ................................................................. $1 1,000.00<br />
Masonry testing.. .................................................................. $1,920.00<br />
Asphalt concrete testing.. ........................................................ $2,190.00<br />
Structural steel observations.. ................................................... $3,520.00<br />
Project management. .............................................................. $6,000.00<br />
Total Fee.. .......................................................................... $47,260.00<br />
Contract time is for the duration <strong>of</strong> the project. Completion date is scheduled for <strong>October</strong> 2013.<br />
All testing fees will be in accordance with the number <strong>of</strong> tests and testing requested and the fee may be<br />
increased or decreased however any changes in the contract will be addressed by a separate amendment to the<br />
contract.<br />
FINANCIAL IMPACT:<br />
Funding is available in the Airport Construction Fund FAA Grant No. 73.<br />
Account No. 433-3603-585-9301<br />
COMMITTEE RECOMMENDATION:<br />
On September 18,<strong>2012</strong> the Airport Advisory Board<br />
considered this item and recommends approval.<br />
Approved by the Operations Committee on Tuesday,<br />
<strong>October</strong> 9,<strong>2012</strong>, and by the Finance Committee on<br />
Wednesday, <strong>October</strong> 10,20 12.<br />
STAFF RECOMMENDATION:<br />
Approval <strong>of</strong> Motion.