October 15, 2012 - City of Laredo
October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo
To: The City of Laredo, Texas Fsorn: Honorable Raul G. Salinas, Mayor BJD PROPOSAL Leyendecker Construction, Inc. Contractor , P.O. Box 1827 Laredo, Texas 78041 Address: (956) 722-0931 Phone: Fax: . (956) 722-8215 Project: LAREDO INTERNATIONAL AIRPORT AIRCRAFT RESCUE & FIRE: RIGHTING BUILDING Pursuant to Notice to Bidders, the undersigned bidder hereby proposes to furnish the labor, materials, and equipment in accordance with the plans and specifications, general coxiditions of the agreement, special provisions of the Agreement, and Addenda, if any. The bidder binds himself upon acceptance of his proposal to execute a contract and bonds accompanying form of performing arid completing the said work within the time stated as required by the detailed specifications at the following unit - prices. The quantities shown below are based on the Engineer's estimate of quantities a11d it is agreed that the quantities may be increased or diminished, and may be considered necessary in the opinion of the City of Laredo, Texas to complete the work fully as planned and contemplated, and that all quantities of work, either increased or decreased, are to be performed at the unit prices set forth below (except as provided in the General Conditions of the Agreement or the specifications, the contract documents). &= The Cont~actor agrees to complete the entire project within jl&calendar days of the contractor's receipt of the Notice to Proceed. Ack~lowledgment,of Addenda: (Please initial and date): Addendum No. 1: &@/Q ~ / I . L Addendum No. 2: ~~/0=k/r L Addendum No. 3: Addendum No. 4: Acknowledgment of other docume~its: (Please initial and date): ~a~e"~eterminati Labor Provisions: Laredo International Airport Division A -Bid Proposal & Bid Bond Aircraft Rescue &Fire Fightillg Building July 11,2012 A-11
- Page 248 and 249: This Agreement contains the entire
- Page 250 and 251: QUOTE# 001 CONTRACT PRICING WORKSHE
- Page 252 and 253: DATE: 10/15/2012 INITIATED BY: Jesu
- Page 254 and 255: F Non- Equipment Charges (Trade- In
- Page 257 and 258: DATE: 10/15/12 INITIATED BY: Carlos
- Page 260 and 261: To: The City of Laredo, Texas Honor
- Page 262 and 263: Item No, 2 3 4 5 6 Eslimated Quanti
- Page 264 and 265: Proposed Progress Schedules: +J, E
- Page 266 and 267: Western Surety Company POWER OF ATT
- Page 268 and 269: CDBG Sidewalks Project No.43 (25.5
- Page 270 and 271: DATE: 10/15/12 INITIATED BY: Carlos
- Page 273 and 274: LLC CDBG SIDEWALKS PROJECT #42 - 23
- Page 275 and 276: Itiformation to Contractors Page 2
- Page 277 and 278: STATEMENT OF !#iMTIEIIRI[&S AND OTm
- Page 279 and 280: Proposal Page 2 of 9 AFFIDAVIT Form
- Page 281 and 282: Proposal CITY OF LAREDO CDBG SIDEWA
- Page 283 and 284: Proposal Page 6 of 9 Cumnt Worldoad
- Page 285 and 286: BID BOND KNOW ALL MEN BY THESE PRES
- Page 287 and 288: SureTec lnsurance Company THIS BOND
- Page 289 and 290: SureTec Insurance Company LIMITED P
- Page 291 and 292: 2016 Mcdonell Laredo Tx. 78040 CURR
- Page 293 and 294: San Luis Rio Colorado, Son. July 19
- Page 295 and 296: Jacaman Road JUAN RAMIREZ INVESTMEN
- Page 297: The bid and bid bonds for Leyendeck
- Page 301 and 302: STATEMENT OF MATERIALS AND OTHER CH
- Page 303: Project: LAREDO INTERNATIONAL AIRPO
- Page 306 and 307: ClTY OF LAREDO ENGINEERING DEPARTME
- Page 308 and 309: DEBARRED BIDDERS STATEMENT The Cont
- Page 310 and 311: BID BOND TRAVELERS CASUALTY AND SUR
- Page 312 and 313: e ST PAUL TRAVELERS IMPORTANT NOTIC
- Page 315: DATE: 10/15/12 INITIATED BY: Carlos
- Page 319: DATE: 10/15/12 INITIATED BY: Carlos
- Page 322 and 323: DATE: 10/15/12 INITIATED BY: Horaci
- Page 324 and 325: Bid Tabulation FY12-097 Contract La
- Page 326 and 327: City of Laredo Utilities Department
- Page 328 and 329: DATE: 1011 511 2 COUNCIL COMMUNICAT
- Page 330 and 331: STATE OF TEXAS COUNTY OF WEBB CITY
- Page 332 and 333: IN WITNESS WHEmOF, the City of Lare
- Page 334 and 335: ATTACHMENT "A" Replacement Page (mo
- Page 336 and 337: Dannenbaum Engineering Company - La
- Page 338 and 339: ATTACHMENT "D" Replacement Page LIS
- Page 340 and 341: Dannenbaum Engineering Company - La
- Page 342 and 343: EXHIBIT NO. 2-1 Supplemental No. 1
- Page 344 and 345: "EXHIBIT NO. 2-1" Preoared , --,. b
- Page 346 and 347: DATE: 1011 511 2 I COUNCIL COMMUNIC
To: The <strong>City</strong> <strong>of</strong> <strong>Laredo</strong>, Texas<br />
Fsorn:<br />
Honorable Raul G. Salinas, Mayor<br />
BJD PROPOSAL<br />
Leyendecker Construction, Inc.<br />
Contractor<br />
, P.O. Box 1827 <strong>Laredo</strong>, Texas 78041<br />
Address:<br />
(956) 722-0931<br />
Phone:<br />
Fax: . (956) 722-82<strong>15</strong><br />
Project: LAREDO INTERNATIONAL AIRPORT<br />
AIRCRAFT RESCUE & FIRE: RIGHTING BUILDING<br />
Pursuant to Notice to Bidders, the undersigned bidder hereby proposes to furnish the<br />
labor, materials, and equipment in accordance with the plans and specifications, general<br />
coxiditions <strong>of</strong> the agreement, special provisions <strong>of</strong> the Agreement, and Addenda, if any.<br />
The bidder binds himself upon acceptance <strong>of</strong> his proposal to execute a contract and bonds<br />
accompanying form <strong>of</strong> performing arid completing the said work within the time stated as<br />
required by the detailed specifications at the following unit<br />
-<br />
prices. The quantities shown<br />
below are based on the Engineer's estimate <strong>of</strong> quantities a11d it is agreed that the quantities<br />
may be increased or diminished, and may be considered necessary in the opinion <strong>of</strong> the<br />
<strong>City</strong> <strong>of</strong> <strong>Laredo</strong>, Texas to complete the work fully as planned and contemplated, and that all<br />
quantities <strong>of</strong> work, either increased or decreased, are to be performed at the unit prices set<br />
forth below (except as provided in the General Conditions <strong>of</strong> the Agreement or the<br />
specifications, the contract documents).<br />
&=<br />
The Cont~actor agrees to complete the entire project within jl&calendar days <strong>of</strong> the<br />
contractor's receipt <strong>of</strong> the Notice to Proceed.<br />
Ack~lowledgment,<strong>of</strong> Addenda: (Please initial and date):<br />
Addendum No. 1: &@/Q ~ / I . L<br />
Addendum No. 2: ~~/0=k/r L<br />
Addendum No. 3:<br />
Addendum No. 4:<br />
Acknowledgment <strong>of</strong> other docume~its: (Please initial and date):<br />
~a~e"~eterminati<br />
Labor Provisions:<br />
<strong>Laredo</strong> International Airport Division A -Bid Proposal & Bid Bond<br />
Aircraft Rescue &Fire Fightillg Building July 11,<strong>2012</strong><br />
A-11