DATE:<br />

10/<strong>15</strong>/12<br />

COUNCIL COMMUNICATION<br />

SUBJECT: MOTION<br />

Award <strong>of</strong> construction contract to the lowest bidder Leyendecker Construction Inc., <strong>Laredo</strong>,<br />

Texas, in the amount <strong>of</strong> $3,588,000.00 for the <strong>Laredo</strong> International Airport Aircraft Rescue and<br />

Fire Fighting Station with a construction contract time <strong>of</strong> three hundred sixty-five (365)<br />

calendar days; and authorizing the <strong>City</strong> Manager to execute all related contract documents<br />

contingent upon receipt and approval <strong>of</strong> insurance and bond documents. Completion date for<br />

the project is scheduled for <strong>October</strong> 2013. Funding is available in the Airport Construction<br />

Fund FAA Grant No. 73.<br />

INITIATED BY:<br />

Carlos Villarreal,<br />

<strong>City</strong> Manager<br />

PREVIOUS COUNCIL ACTION:<br />

None.<br />

STAFF SOURCE:<br />

Rogelio Rivera, P.E., <strong>City</strong> Engineer<br />

Jose L. Flores, Airport Manager<br />

BACKGROUND:<br />

The proposed Aircraft Rescue and Fire Fighting facility is an Index C compliant ARFF station situated on a two-acre site,<br />

300 feet south <strong>of</strong> the terminal apron. The <strong>15</strong>,400 SF building will be located immediately east <strong>of</strong> Taxiway J at the<br />

intersection with Taxiway D. The new facility will encompass two tandem drive-through apparatus bays and one<br />

maintenance bay, supported by a gear wasWdecontamination room, an agent storage room, SCBA, workshop and hose<br />

drying room. The private staff area has six shared sleeping rooms supported by three toiletlshower bathrooms, a laundry<br />

room and exercise room. Operations spaces include two staff <strong>of</strong>fices, watchlalam and conference room, kitchenldining<br />

room, TV and dayroom, with rooms for I.T., mechanical and electrical equipment. The site work includes water for<br />

firefighting and domestic use, a sanitary sewer, and power and communications conduit. A concrete paved ARFF vehicle<br />

driveway from the airfield loops around the building to expedite parking and refilling <strong>of</strong> on-board water and agent tanks.<br />

Landside access is provided by a concrete paved driveway from the AOA fence-line, serving 18 staff and vehicle parking<br />

spaces. Plans and specifications were prepared by URS Corporation, Dallas, Texas.<br />

Five (5) bids were received at the <strong>City</strong> Secretary's Office at 4:00 P.M. on Thursday, August 16,<strong>2012</strong>, and publicly<br />

opened, read, and taken under advisement on Friday, August 17,<strong>2012</strong>, at 10:OO A.M. as follows:<br />

Contractor (Bidder)<br />

1. Leyendecker Construction, Inc.<br />

<strong>Laredo</strong>, Texas<br />

2. Vision Construction Company<br />

<strong>Laredo</strong>, Texas<br />

3. Davila Construction<br />

San Antonio, Texas<br />

4. Journeyman Construction<br />

San Antonio, Texas<br />

5. Marshall Company<br />

Corpus Christi, Texas<br />

Base Bid<br />

$3,580,000.00<br />

$3,585,635.96<br />

$3,700,000.00<br />

$4,330,000.00<br />

$4,388,000.00<br />

Alternate No. 1 (provide ceramic<br />

tile in lieu <strong>of</strong> vinyl per 01 2300<br />

alternates)<br />

$8,000.00<br />

$2,500.00<br />

$9,000.00<br />

$12,000.00<br />

$9,800.00<br />

Page 1 <strong>of</strong> 2<br />

FINANCIAL IMPACT:<br />

Funding is available in the Airport Construction Fund FAA Grant No. 73.<br />

Account No. 433-3603-585-930 1<br />

COMMITTEE RECOMMENDATION:<br />

STAFF RECOMMENDATION:<br />

On September 18,<strong>2012</strong> the Airport Advisory Board Approval <strong>of</strong> Motion.<br />

considered this item and recommends approval.<br />

Approved by the Operations Committee on Tuesday,<br />

<strong>October</strong> 9,201 2, and by the Finance Committee on<br />

Wednesday, <strong>October</strong> 10,<strong>2012</strong>.<br />

Total Base Bid and<br />

Alternate No. 1<br />

$3,588,000.00<br />

$3,588,135.96<br />

$3,709,000.00<br />

$4,342,000.00<br />

$4,397,800.00