October 15, 2012 - City of Laredo
October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo
January 1993 -January 1994 Resident of Urbanization at Constructora PAVEFRO at Nuevo Laredo I administered and executed a project involving the construction of cells of anchorage for the sanitary filling at Nuevo Laredo, performing the activities of coordination of machinery for earth fill , topography equipment and pipe installers Achivements Fulfill the time, cost and quality objectives set by the company. August 1992 - August 1993 Resident of Edification at Constructora CASTORES from Durango I supervised the project of construction of 150 houses in New developing activities of coordination of provisions., verification of work quality, advance and perform estimations. Achivements Fulfill the time, cost and quality objectives set by the company. May 1992 - August 1992 Resident of Edification en Constructora FUTURO de N.L. Tam. I supervised the project of construction of 2 public buildings, one being the Department of General Services and the other one the Cultural House of Nuevo Laredo. Coordinating provisions and verifying the quality of work and degree of advance. Achivements Fulfill the time, cost and quality objectives set by the company. March 1991- May 1992 Edification Supervisor at Constructora CHAMPYAN from Tampico I supervised the project of construction of 230 houses in Nuevo Laredo performing activities of verification of work quality, advance and perform estimations. Achivements I managed to integrate my self to a job company with 10 years of experience in a fast and efficient way.
San Luis Rio Colorado, Son. July 1999 - February 2001 Casas GEO Job superintendent at the Reynosa and Nuevo Laredo branches of one of the main Mexican house-building companies. Developed two divisions, totaling 1350 and 706 built houses. July 1995 - July 1999 Various: Raft, Constructora Piriimide, Construcciones Vilchis, and Constructora PACSA. Urbanization resident for several Nuevo Laredo based companies. Urbanization of 500 houses, industrial patios-of maneuver and industrial ships. July 1994 - July 1995 Grupo Acali Building supervisor in Nuevo Laredo of a Chihuahua-based company. 120 houses built. January 1993 - July 1994 Constructora Pavimentos y Edificaciones Fronterizas Resident of urbanization during the construction of Nuevo Laredo's waste landfill. March 1991 - January 1993 Resident of construction for local and foreign companies in Nuevo Laredo, such as Castores Construction Company (Durango), Futuro Construction Company (Nuevo Laredo) and Champay an Construction Company (Tampico). Development of 610 houses, public buildings and paving. EDUCATION Master in Construction Management. Universidad Aut6noma de Tamaulipas. Civil Engineer. hstituto Tecnol6gico de Nuevo Laredo. Specialty in Management. Universidad Virtual- Tecnol6gico de Monterrey (currently attending) COURSES Electronic 1og.Cbmara de la Industria de la Construcci6n. STAAD software for computer analysis of steel and concrete structures Wonterrey, N.L.) Opus AE-10, software for unit cost analysis. Cgmara de la Industria de la Construcci6n Intermediate English (60 hours). Royal English Academy. Steel structures (40 hours). Institute Tecnol6gico de Nuevo Laredo. Microsoft Office: Excel, Word and Power Point (60 hours). Royal English Academy. Autocad 14 (40 hours). Institute Tecnol6gico de Nuevo Laredo. Opus 2000 (40 horas). CBmara de la Industria de la Construcci6n.
- Page 242 and 243: This Agreement is entered into purs
- Page 244 and 245: provided the non-performing party e
- Page 246 and 247: Grantee shall maintain and retain s
- Page 248 and 249: This Agreement contains the entire
- Page 250 and 251: QUOTE# 001 CONTRACT PRICING WORKSHE
- Page 252 and 253: DATE: 10/15/2012 INITIATED BY: Jesu
- Page 254 and 255: F Non- Equipment Charges (Trade- In
- Page 257 and 258: DATE: 10/15/12 INITIATED BY: Carlos
- Page 260 and 261: To: The City of Laredo, Texas Honor
- Page 262 and 263: Item No, 2 3 4 5 6 Eslimated Quanti
- Page 264 and 265: Proposed Progress Schedules: +J, E
- Page 266 and 267: Western Surety Company POWER OF ATT
- Page 268 and 269: CDBG Sidewalks Project No.43 (25.5
- Page 270 and 271: DATE: 10/15/12 INITIATED BY: Carlos
- Page 273 and 274: LLC CDBG SIDEWALKS PROJECT #42 - 23
- Page 275 and 276: Itiformation to Contractors Page 2
- Page 277 and 278: STATEMENT OF !#iMTIEIIRI[&S AND OTm
- Page 279 and 280: Proposal Page 2 of 9 AFFIDAVIT Form
- Page 281 and 282: Proposal CITY OF LAREDO CDBG SIDEWA
- Page 283 and 284: Proposal Page 6 of 9 Cumnt Worldoad
- Page 285 and 286: BID BOND KNOW ALL MEN BY THESE PRES
- Page 287 and 288: SureTec lnsurance Company THIS BOND
- Page 289 and 290: SureTec Insurance Company LIMITED P
- Page 291: 2016 Mcdonell Laredo Tx. 78040 CURR
- Page 295 and 296: Jacaman Road JUAN RAMIREZ INVESTMEN
- Page 297: The bid and bid bonds for Leyendeck
- Page 300 and 301: Affirmative Action Program: Project
- Page 302 and 303: INFORMATION FROM BIDDERS MUST BE CO
- Page 305 and 306: TELEPI-IONE (956)-722-053 1 FAX (95
- Page 307 and 308: TOTAL BASE BID TOTAL BASE BID BID S
- Page 309 and 310: 1 RESTRICTIONS ON LOBBYING CERTIFIC
- Page 311 and 312: POWER OF ATTORNEY Farnlington Casua
- Page 313: DATE: 1011 5/12 COUNCIL COMMUNICATI
- Page 317: DATE: 10/15/12 INITIATED BY: Carlos
- Page 321 and 322: DATE: 10115112 INITIATED BY: Jesus
- Page 323 and 324: Bid Tabulation FY 12-097 Contract L
- Page 325 and 326: DATE: 10/15/12 COUNCIL COMMUNICATIO
- Page 327 and 328: Requested by: Approved by: Approved
- Page 329 and 330: September 20,201 2 DANNENBAUM ENGIN
- Page 331 and 332: additional services and is based on
- Page 333 and 334: EXHIBIT NO. 1-1 REPLACEMENT PAGE AN
- Page 335 and 336: ATTACHMENT "A" Replacement Page (mo
- Page 337 and 338: Date: May 3, 2012 Replacement Page
- Page 339 and 340: ATTACHMENT "D" Replacement Page LIS
- Page 341 and 342: Date: Mav , 3.2012 - ATTACHMENT "B"
January 1993 -January 1994<br />
Resident <strong>of</strong> Urbanization at Constructora PAVEFRO at Nuevo <strong>Laredo</strong><br />
I administered and executed a project involving the construction <strong>of</strong> cells <strong>of</strong> anchorage for the sanitary<br />
filling at Nuevo <strong>Laredo</strong>, performing the activities <strong>of</strong> coordination <strong>of</strong> machinery for earth fill , topography<br />
equipment and pipe installers<br />
Achivements<br />
Fulfill the time, cost and quality objectives set by the company.<br />
August 1992 - August 1993<br />
Resident <strong>of</strong> Edification at Constructora CASTORES from Durango<br />
I supervised the project <strong>of</strong> construction <strong>of</strong> <strong>15</strong>0 houses in New developing activities <strong>of</strong> coordination <strong>of</strong><br />
provisions., verification <strong>of</strong> work quality, advance and perform estimations.<br />
Achivements<br />
Fulfill the time, cost and quality objectives set by the company.<br />
May 1992 - August 1992<br />
Resident <strong>of</strong> Edification en Constructora FUTURO de N.L. Tam.<br />
I supervised the project <strong>of</strong> construction <strong>of</strong> 2 public buildings, one being the Department <strong>of</strong> General<br />
Services and the other one the Cultural House <strong>of</strong> Nuevo <strong>Laredo</strong>. Coordinating provisions and verifying<br />
the quality <strong>of</strong> work and degree <strong>of</strong> advance.<br />
Achivements<br />
Fulfill the time, cost and quality objectives set by the company.<br />
March 1991- May 1992<br />
Edification Supervisor at Constructora CHAMPYAN from Tampico<br />
I supervised the project <strong>of</strong> construction <strong>of</strong> 230 houses in Nuevo <strong>Laredo</strong> performing activities <strong>of</strong><br />
verification <strong>of</strong> work quality, advance and perform estimations.<br />
Achivements<br />
I managed to integrate my self to a job company with 10 years <strong>of</strong> experience in a fast and efficient way.