October 15, 2012 - City of Laredo
October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo
Proposal Page 7 of 9 Subcontractors L Materials: (Submit a list of Subcontractors including name, address, and contact information. List sources, types and manufacturers of proposed materials including contact information) By the act of submitting a bid on this pffoject the contractor is indicating and cediwing hislher capability, including equipmeant and personnel, to routinely install steel casing by way of boring or jacking to the straight slopes, grades, and alignments presented ina these plans without dips in the flow line. CDBG SIDEWALKS PROJECT #42 - 23 BLOCKS SUBCONTRACTORS LAREDO READY MIX CMC REBAR BEAVERS SOURCE 3000 PSI CONCRETE REBAR, WIRE, MESH, DOWELS, ETC. IREBAR, WIRE, MESH, DOWELS, ETC. Financial Status: A confidential financial statement will be submitted by the apparent successful low Bidder only if the Owner deems it necessary. Division A .. bG\
BID BOND KNOW ALL MEN BY THESE PRESENTS, that we DEH Construction Co, LLC as principal, hereinafter called the "Principal," and SURETEC INSURANCE COMPANY, as surety, hereinafter called the "Surety," are held and firmly bound unto City of Laredo as obligee, hereinafter called the Obligee, in the sum of 5 % of the greatest amount bid by Principal for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the principal has submitted a bid for CDBG Sidewalks City-Wide Project # 42 (23.5 Blocks - Distr~ct IV) Proi. No. NOW, THEREFORE, if the contract be timely awarded to the Principal and the Principal shall within such time as specified in the bid, enter into a contract in writing or, in the event of the failure of the Principal to enter into such Contract, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. PROVIDED, HOWEVER, neither Principal nor Surety shall be bound hereunder unless Obligee prior to execution of the final contract shall furnish evidence of financing in a manner and form acceptable to Principal and Surety that financing has been firmly committed to cover the entire cost of the project. SIGNED, sealed and dated this 9th day of August , 2012 DEH Construction Co, LLC (Principal) BY: TITLE: w SURETEC INSURANCE COMPANY BY: --_U , Attorney-in-Fact
- Page 234 and 235: HIGHWAY PROJECT CUATRO VIENTOS ENTI
- Page 236 and 237: RESOLUTION 201 2-R-086 Authorizing
- Page 238 and 239: DATE: COUNCIL COMMUNICATION 1 SUBJE
- Page 240 and 241: DATE: 10115/2012 INITIATED BY: Jesu
- Page 242 and 243: This Agreement is entered into purs
- Page 244 and 245: provided the non-performing party e
- Page 246 and 247: Grantee shall maintain and retain s
- Page 248 and 249: This Agreement contains the entire
- Page 250 and 251: QUOTE# 001 CONTRACT PRICING WORKSHE
- Page 252 and 253: DATE: 10/15/2012 INITIATED BY: Jesu
- Page 254 and 255: F Non- Equipment Charges (Trade- In
- Page 257 and 258: DATE: 10/15/12 INITIATED BY: Carlos
- Page 260 and 261: To: The City of Laredo, Texas Honor
- Page 262 and 263: Item No, 2 3 4 5 6 Eslimated Quanti
- Page 264 and 265: Proposed Progress Schedules: +J, E
- Page 266 and 267: Western Surety Company POWER OF ATT
- Page 268 and 269: CDBG Sidewalks Project No.43 (25.5
- Page 270 and 271: DATE: 10/15/12 INITIATED BY: Carlos
- Page 273 and 274: LLC CDBG SIDEWALKS PROJECT #42 - 23
- Page 275 and 276: Itiformation to Contractors Page 2
- Page 277 and 278: STATEMENT OF !#iMTIEIIRI[&S AND OTm
- Page 279 and 280: Proposal Page 2 of 9 AFFIDAVIT Form
- Page 281 and 282: Proposal CITY OF LAREDO CDBG SIDEWA
- Page 283: Proposal Page 6 of 9 Cumnt Worldoad
- Page 287 and 288: SureTec lnsurance Company THIS BOND
- Page 289 and 290: SureTec Insurance Company LIMITED P
- Page 291 and 292: 2016 Mcdonell Laredo Tx. 78040 CURR
- Page 293 and 294: San Luis Rio Colorado, Son. July 19
- Page 295 and 296: Jacaman Road JUAN RAMIREZ INVESTMEN
- Page 297: The bid and bid bonds for Leyendeck
- Page 300 and 301: Affirmative Action Program: Project
- Page 302 and 303: INFORMATION FROM BIDDERS MUST BE CO
- Page 305 and 306: TELEPI-IONE (956)-722-053 1 FAX (95
- Page 307 and 308: TOTAL BASE BID TOTAL BASE BID BID S
- Page 309 and 310: 1 RESTRICTIONS ON LOBBYING CERTIFIC
- Page 311 and 312: POWER OF ATTORNEY Farnlington Casua
- Page 313: DATE: 1011 5/12 COUNCIL COMMUNICATI
- Page 317: DATE: 10/15/12 INITIATED BY: Carlos
- Page 321 and 322: DATE: 10115112 INITIATED BY: Jesus
- Page 323 and 324: Bid Tabulation FY 12-097 Contract L
- Page 325 and 326: DATE: 10/15/12 COUNCIL COMMUNICATIO
- Page 327 and 328: Requested by: Approved by: Approved
- Page 329 and 330: September 20,201 2 DANNENBAUM ENGIN
- Page 331 and 332: additional services and is based on
- Page 333 and 334: EXHIBIT NO. 1-1 REPLACEMENT PAGE AN
Proposal Page 7 <strong>of</strong> 9<br />
Subcontractors L Materials: (Submit a list <strong>of</strong> Subcontractors including name, address,<br />
and contact information. List sources, types and manufacturers <strong>of</strong><br />
proposed materials including contact information)<br />
By the act <strong>of</strong> submitting a bid on this pffoject the contractor is indicating and cediwing<br />
hislher capability, including equipmeant and personnel, to routinely install steel casing by<br />
way <strong>of</strong> boring or jacking to the straight slopes, grades, and alignments presented ina these<br />
plans without dips in the flow line.<br />
CDBG SIDEWALKS PROJECT #42 - 23 BLOCKS<br />
SUBCONTRACTORS<br />
LAREDO READY MIX<br />
CMC REBAR<br />
BEAVERS SOURCE<br />
3000 PSI CONCRETE<br />
REBAR, WIRE, MESH, DOWELS, ETC.<br />
IREBAR, WIRE, MESH, DOWELS, ETC.<br />
Financial Status: A confidential financial statement will be submitted by the apparent<br />
successful low Bidder only if the Owner deems it necessary.<br />
Division A .. bG\