October 15, 2012 - City of Laredo

October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo

ci.laredo.tx.us
from ci.laredo.tx.us More from this publisher
20.06.2013 Views

Proposal Page 7 of 9 Subcontractors L Materials: (Submit a list of Subcontractors including name, address, and contact information. List sources, types and manufacturers of proposed materials including contact information) By the act of submitting a bid on this pffoject the contractor is indicating and cediwing hislher capability, including equipmeant and personnel, to routinely install steel casing by way of boring or jacking to the straight slopes, grades, and alignments presented ina these plans without dips in the flow line. CDBG SIDEWALKS PROJECT #42 - 23 BLOCKS SUBCONTRACTORS LAREDO READY MIX CMC REBAR BEAVERS SOURCE 3000 PSI CONCRETE REBAR, WIRE, MESH, DOWELS, ETC. IREBAR, WIRE, MESH, DOWELS, ETC. Financial Status: A confidential financial statement will be submitted by the apparent successful low Bidder only if the Owner deems it necessary. Division A .. bG\

BID BOND KNOW ALL MEN BY THESE PRESENTS, that we DEH Construction Co, LLC as principal, hereinafter called the "Principal," and SURETEC INSURANCE COMPANY, as surety, hereinafter called the "Surety," are held and firmly bound unto City of Laredo as obligee, hereinafter called the Obligee, in the sum of 5 % of the greatest amount bid by Principal for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the principal has submitted a bid for CDBG Sidewalks City-Wide Project # 42 (23.5 Blocks - Distr~ct IV) Proi. No. NOW, THEREFORE, if the contract be timely awarded to the Principal and the Principal shall within such time as specified in the bid, enter into a contract in writing or, in the event of the failure of the Principal to enter into such Contract, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. PROVIDED, HOWEVER, neither Principal nor Surety shall be bound hereunder unless Obligee prior to execution of the final contract shall furnish evidence of financing in a manner and form acceptable to Principal and Surety that financing has been firmly committed to cover the entire cost of the project. SIGNED, sealed and dated this 9th day of August , 2012 DEH Construction Co, LLC (Principal) BY: TITLE: w SURETEC INSURANCE COMPANY BY: --_U , Attorney-in-Fact

Proposal Page 7 <strong>of</strong> 9<br />

Subcontractors L Materials: (Submit a list <strong>of</strong> Subcontractors including name, address,<br />

and contact information. List sources, types and manufacturers <strong>of</strong><br />

proposed materials including contact information)<br />

By the act <strong>of</strong> submitting a bid on this pffoject the contractor is indicating and cediwing<br />

hislher capability, including equipmeant and personnel, to routinely install steel casing by<br />

way <strong>of</strong> boring or jacking to the straight slopes, grades, and alignments presented ina these<br />

plans without dips in the flow line.<br />

CDBG SIDEWALKS PROJECT #42 - 23 BLOCKS<br />

SUBCONTRACTORS<br />

LAREDO READY MIX<br />

CMC REBAR<br />

BEAVERS SOURCE<br />

3000 PSI CONCRETE<br />

REBAR, WIRE, MESH, DOWELS, ETC.<br />

IREBAR, WIRE, MESH, DOWELS, ETC.<br />

Financial Status: A confidential financial statement will be submitted by the apparent<br />

successful low Bidder only if the Owner deems it necessary.<br />

Division A .. bG\

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!