October 15, 2012 - City of Laredo
October 15, 2012 - City of Laredo October 15, 2012 - City of Laredo
Item No, 2 3 4 5 6 Eslimated Quantity 20'899 832 10 2 1 0 Unit SF SF EA EA LS EA BID SCHEDULE FOR SIDEWALK PROJECT 43 (25.5 BLOCKS DISTRICT V) CITY OF LAREDO ENGINEERING DEPARTMENT Name of fay Item With Unit Prices Written in Words Furnish all labor, equipment, md material to consttuct a 4" thick Reinforced Concrete Sidewalk including all cosf for preparation, hleter Adjustment, saw cutting, removing, disposing of existing concrete & trees as necessary. Also, includes all Relocations of Mail boxes, Stop & Street si s, complete in place at: f h V ~ P . an4 bYieo do\\ar as perunit. Furnish all labor, equipment, and material to construct a 6" thick 4' wide Concrete Sidewalk at driveway, including all cost for preparation, Meter adjustment, saw cutting, removing, disposing of existing concrete & trees as newsaty. Also, includes all Relocations ofMait boxes, Stop & Street signs, complete in place at: Four a,d qOl~co do\\ax 5 pet unit. Furnish all labor, equipment, and material to construct a Reinforced Concrete Single ADA Ramp, including all cost for preparation, Meter Adjusrment, saw cutting, removing, disposing of existing concrete & trees as necessary. Also, includes all Relocations of Mail boxes, Stop & Street signs, complete in place at: S~V- +A oqd ''O/t*o &,l\lyjper unit. Furnish all labor, equipment, and material to construct a Reinforced Concrete Double ADA Ramp, including all cost for preparation, Meter Adjustment, saw cutting removing, disposing of existing concrete & trees as necessary. Also, includes all Relocations of Mail boxes, Stop Bc Street signs, complete in p la~ at: 0- A-kaar a d d.4 vfsojrao &f\arcger unit. Include %10,000.00 Contingencies as part of the Base bid, complete in place at per unit. Furnish all labor, equipment, and material to construct a Reinforced Concrete STEPS as per details on plans, complete in place at: I TELEPHONElFAX NUMBERS: Lq56\ 2r84 - 03 7 b / (9~6) 3 12 - 3 4 5 0 1 +:.. NOTE: AL,L BID ITEMS WILL BE PAID FOR WHEN COMPLETE IN PLACE, TESTED AND ACCEPTED BY T3flE OWNER. 8 . .. t . . , . . . . . . 3 .......I... . ti.;,.< q.*,-.;,h ' . . ' . .,. . , . . . . . 1 . : ; . 2- , ' : .. -.;s ...r..u....; ..... ,.*" .tt. ...* ::a:.i-,~ii.i . ii-n;CI.d*.j.'jjj. :i...,' ..-,T, Unit Bid Price 9 3. 6 p 4 * 3 0 Amount Bid hq 5,236 ~4 3 9 10. 4 > , .... 3 ' .. .?_ ..& *.:
lu~ vwlA'1'1ON FROM BIDDERS MUST BE COMPLETED AND SUBMITTED WITH BID PROPOSAL Project: CDBG Sidewalks City - Wide Project No. 43 (25.5 Blocks - District V) Stateineilt of Qualifications: (Similar Projects Conlpleted by Bidder) 1. Name of Project: Value of Contract: Date Completed: 2. Name of Project: Value of Contract: Date Completed: 3. Name of Project: Value of Contract: Date Completed: Experience Data: (Include name and experience record of the Superintendent) Mr. k&,d Vah : 2 a yrsr5 rk cxprian ra. ir\ gcfiorn\ 'mn I i(t~\~)ht~~ ce-cceCc work I M e s ~ ~ qva-;ng, ~ y , a&* Financial Status: A coddential financial statement will de submitted by the apparent successful low Bidder only if the Owner deems it necessary.
- Page 211 and 212: PREPARED 9/28/12, 18:21:40 TAX ADJU
- Page 213 and 214: PREPARED 9/28/12, 18:21:40 PROGRAM
- Page 215 and 216: PREPARED 9/28/12, 17:33:06 TAX PERI
- Page 217 and 218: DATE: 3ctober 15,2012 INITIATED BY:
- Page 219 and 220: RESOLUTION NO. 2012-R-083 PASSED BY
- Page 221 and 222: County WEBB District Laredo (22) RO
- Page 223 and 224: County: Webb District: Laredo AGREE
- Page 225 and 226: LOCATION "B" = 1-1 SCALE: 1 = 300'
- Page 227 and 228: WESOLUTION NO. 20%-R4$9 PASSER BY T
- Page 229 and 230: -&&q-, . -&:k%- Form ROW-W-EDC Xev.
- Page 232 and 233: AU'PpQOMZING THE CITY MANAGER TO EX
- Page 234 and 235: HIGHWAY PROJECT CUATRO VIENTOS ENTI
- Page 236 and 237: RESOLUTION 201 2-R-086 Authorizing
- Page 238 and 239: DATE: COUNCIL COMMUNICATION 1 SUBJE
- Page 240 and 241: DATE: 10115/2012 INITIATED BY: Jesu
- Page 242 and 243: This Agreement is entered into purs
- Page 244 and 245: provided the non-performing party e
- Page 246 and 247: Grantee shall maintain and retain s
- Page 248 and 249: This Agreement contains the entire
- Page 250 and 251: QUOTE# 001 CONTRACT PRICING WORKSHE
- Page 252 and 253: DATE: 10/15/2012 INITIATED BY: Jesu
- Page 254 and 255: F Non- Equipment Charges (Trade- In
- Page 257 and 258: DATE: 10/15/12 INITIATED BY: Carlos
- Page 260 and 261: To: The City of Laredo, Texas Honor
- Page 264 and 265: Proposed Progress Schedules: +J, E
- Page 266 and 267: Western Surety Company POWER OF ATT
- Page 268 and 269: CDBG Sidewalks Project No.43 (25.5
- Page 270 and 271: DATE: 10/15/12 INITIATED BY: Carlos
- Page 273 and 274: LLC CDBG SIDEWALKS PROJECT #42 - 23
- Page 275 and 276: Itiformation to Contractors Page 2
- Page 277 and 278: STATEMENT OF !#iMTIEIIRI[&S AND OTm
- Page 279 and 280: Proposal Page 2 of 9 AFFIDAVIT Form
- Page 281 and 282: Proposal CITY OF LAREDO CDBG SIDEWA
- Page 283 and 284: Proposal Page 6 of 9 Cumnt Worldoad
- Page 285 and 286: BID BOND KNOW ALL MEN BY THESE PRES
- Page 287 and 288: SureTec lnsurance Company THIS BOND
- Page 289 and 290: SureTec Insurance Company LIMITED P
- Page 291 and 292: 2016 Mcdonell Laredo Tx. 78040 CURR
- Page 293 and 294: San Luis Rio Colorado, Son. July 19
- Page 295 and 296: Jacaman Road JUAN RAMIREZ INVESTMEN
- Page 297: The bid and bid bonds for Leyendeck
- Page 300 and 301: Affirmative Action Program: Project
- Page 302 and 303: INFORMATION FROM BIDDERS MUST BE CO
- Page 305 and 306: TELEPI-IONE (956)-722-053 1 FAX (95
- Page 307 and 308: TOTAL BASE BID TOTAL BASE BID BID S
- Page 309 and 310: 1 RESTRICTIONS ON LOBBYING CERTIFIC
- Page 311 and 312: POWER OF ATTORNEY Farnlington Casua
lu~ vwlA'1'1ON FROM BIDDERS<br />
MUST BE COMPLETED AND SUBMITTED WITH BID PROPOSAL<br />
Project: CDBG Sidewalks <strong>City</strong> - Wide Project No. 43 (25.5 Blocks - District V)<br />
Stateineilt <strong>of</strong> Qualifications: (Similar Projects Conlpleted by Bidder)<br />
1. Name <strong>of</strong> Project:<br />
Value <strong>of</strong> Contract:<br />
Date Completed:<br />
2. Name <strong>of</strong> Project:<br />
Value <strong>of</strong> Contract:<br />
Date Completed:<br />
3. Name <strong>of</strong> Project:<br />
Value <strong>of</strong> Contract:<br />
Date Completed:<br />
Experience Data: (Include name and experience record <strong>of</strong> the Superintendent)<br />
Mr. k&,d Vah : 2 a yrsr5 rk cxprian ra. ir\ gcfiorn\ 'mn I<br />
i(t~\~)ht~~ ce-cceCc work I M e s ~ ~ qva-;ng, ~ y , a&*<br />
Financial Status: A coddential financial statement will de submitted by the apparent successful low<br />
Bidder only if the Owner deems it necessary.