DATE:<br />

10/<strong>15</strong>/12<br />

INITIATED BY:<br />

Carlos Villarreal,<br />

<strong>City</strong> Manager<br />

-<br />

PREVIOUS COUNCIL ACTION:<br />

None.<br />

COUNCIL COMMUNICATION<br />

SUBJECT: MOTION<br />

Consideration for approval <strong>of</strong> amendment no. 2 an increase <strong>of</strong> $5,852.28 to the pr<strong>of</strong>essional<br />

services contract with Architects Plus, Inc., <strong>Laredo</strong>, Texas for upgrades to site lighting, site<br />

furnishings, and site landscaping for the El Eden Community Park Improvements Project.<br />

Current engineering contract amount with his amendment is $48,896.87. Funding is available<br />

in the 2008 CO and 2007 CO Discretionary.<br />

BACKGROUND:<br />

The original scope <strong>of</strong> work included but not limited to:<br />

STAFF SOURCE:<br />

Rogelio Rivera, P.E., <strong>City</strong> Engineer<br />

Osbaldo Guzman, Parks and Leisure Director<br />

The project consists <strong>of</strong> the complete construction <strong>of</strong> outdoor amenities for the new El Eden Community Park<br />

Improvements including a concrete basketball court, concrete sidewalk trails, shade structures, steel benches,<br />

perimeter cyclone fencing, drainage structures, site lighting system, sprinkler system and landscaping.<br />

This amendment no. 2 is for upgrades to site lighting, site furnishings, and site landscaping.<br />

. .<br />

............................................................<br />

Original engineering contract amount. $3 3,250.00<br />

(Approved by <strong>City</strong> Manager on April 19,20 1 1)<br />

Amendment No. 1 ................................................................................... $9,794.59<br />

(Approved by <strong>City</strong> Manager on April 25,<strong>2012</strong>)<br />

For design and installation <strong>of</strong> site irrigation sprinkler<br />

system, drainage improvements, existing east property line fencing<br />

repairs, and additional lighting.<br />

This amendment no. 2.. ............................................................................ $5,852.28<br />

Current engineering contract amount.. ........................................................... $48,896.87<br />

FINANCIAL IMPACT:<br />

Funding is available in the 2008 CO and 2007 CO - Discretionary.<br />

Account No. 461-9854-535-4898 $5,219<br />

Account No. 462-9853-4361 $633.28<br />

COMMITTEE RECOMMENDATION:<br />

Approved by the Operations Committee on<br />

Tuesday, <strong>October</strong> 9,<strong>2012</strong>.<br />

STAFF RECOMMENDATION:<br />

Approval <strong>of</strong> Motion.