DATE:<br />

10/<strong>15</strong>/12<br />

INITIATED BY:<br />

Carlos Villarreal,<br />

<strong>City</strong> Manager<br />

COUNCIL COMMUNICATION<br />

SUBJECT: MOTION<br />

Consideration for approval <strong>of</strong> amendment 110.3 a net increase <strong>of</strong> $25,000.00 to the pr<strong>of</strong>essional<br />

services contract with Crane Engineering Corporation, <strong>Laredo</strong>, Texas, for additional project<br />

management, site inspections, product submittal review, and coordination caused by construction<br />

delays by the contractor for the completion <strong>of</strong> the North Merida Drive Extension Project. Current<br />

engineering contract amount with this amendment is $342,600.00. Funding is available in contract<br />

liquidated damages.<br />

STAFF SOURCE:<br />

Rogelio Rivera, P.E., <strong>City</strong> Engineer<br />

Riazul I. Mia, Environmental Director<br />

PREVIOUS COUNCIL ACTION:<br />

On February 22,20 1 1, <strong>City</strong> Council approved amendment no. 2 an increase <strong>of</strong> $1 9,300.00 to the pr<strong>of</strong>essional<br />

services contract with Crane Engineering Corporation, <strong>Laredo</strong>, Texas, for the North Merida Drive Extension<br />

Project to submit environmental work to USACE for approval <strong>of</strong> excavation <strong>of</strong> existing pond immediately east <strong>of</strong><br />

Merida Drive and for bridge pier cap design modifications.<br />

BACKGROUND:<br />

The original scope <strong>of</strong> services is to include, but not limited to:<br />

Planning, design and permitting for the proposed construction <strong>of</strong> the extension <strong>of</strong> North Merida Drive and other<br />

public improvements that will be required for the successful completion <strong>of</strong> this project. These services are limited<br />

to the approximate 1,500 linear feet section within the proposed Independence Hills Park Project.<br />

This amendment no. 3 is for additional project management site inspections, product submittal review, and<br />

coordination and also includes additional monthly meetings, pre-final inspections, and meetings with sub-<br />

contractors. These additional services will increase the contract by $40,000.00 but the <strong>City</strong> <strong>of</strong> <strong>Laredo</strong> is receiving a<br />

$<strong>15</strong>,000.00 credit for Hydrologic and Hydraulic Modeling Allowances not used therefore changing the contract by<br />

a net increase amount <strong>of</strong> $25,000.00.<br />

Original engineering contract amount.. ....................................................... $285,600.00<br />

(Approved by <strong>City</strong> Council on March 16,2009<br />

Amendment no. 1 ................................................................................. $12,700.00<br />

(Approved by <strong>City</strong> Manager on September 23,2009)<br />

Design <strong>of</strong> 12" water line extension as requested by the<br />

Utilities Department.<br />

...............................................................................<br />

Amendment no. 2.. $19,300.00<br />

(Approved by <strong>City</strong> Council February 22,20 1 1)<br />

To submit environmental work to USACE for approval <strong>of</strong> excavation<br />

<strong>of</strong> existing pond immediately east <strong>of</strong> Merida Drive and for bridge pier<br />

cap design modifications.<br />

This amendment no. 3.. ......................................................................... $25.000.00<br />

Additional project management, etc.. ................ $40,000.00<br />

Deduct hydrologic and hydraulic modeling.. ....... .$( <strong>15</strong>,000.00)<br />

Contract net increase.. ................................. .$25,000.00<br />

Current engineering contract amount.. ......................................................... $342,600.00<br />

FINANCIAL IMPACT:<br />

Funding is available in the contract liquidated damages.<br />

COMMITTEE RECOMMENDATION:<br />

Approved by the Operations Committee on<br />

Tuesday, <strong>October</strong> 9,20 12.<br />

STAFF RECOMMENDATION:<br />

Approval <strong>of</strong> Motion.