19.06.2013 Views

APMP.M.H-S3 Final Report Comparison on Hardness ... - BIPM

APMP.M.H-S3 Final Report Comparison on Hardness ... - BIPM

APMP.M.H-S3 Final Report Comparison on Hardness ... - BIPM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Participant<br />

Nati<strong>on</strong>al Institute of<br />

Metrology (Thailand),<br />

NIMT<br />

Table 2 List of CMC declarati<strong>on</strong><br />

Calibrati<strong>on</strong> and Measurement Capability (CMC)<br />

Rockwell scale A Rockwell scale B<br />

0.38 HRA 0.40 HRB<br />

Physikalisch-Technische<br />

Bundesanstalt, PTB<br />

0.30 HRA 0.50 HRB<br />

Standards and Calibrati<strong>on</strong><br />

Laboratory, SCL<br />

- 1.5 HRB<br />

Korea Research Institute<br />

of Standards and Science,<br />

KRISS 0.40 HRA<br />

0.60 HRB for nominal<br />

more than 50 HRB<br />

0.75 HRB for nominal<br />

not more than 50 HRB<br />

Nati<strong>on</strong>al Physical<br />

Laboratory, NPLI<br />

0.30 HRA<br />

0.50 HRB for nominal<br />

more than 60 HRB<br />

0.60 HRB for nominal<br />

not more than 60 HRB<br />

3. Schedule<br />

The comparis<strong>on</strong> started at the pilot lab, NIMT, in May 2010. The original schedule was<br />

to transfer the artifact from NIMT, PTB, NPLI, SCL, and KRISS respectively with 2<br />

weeks for measurement and 2 weeks for transportati<strong>on</strong> process. The actual<br />

measurement schedule was slightly changed from the tentative <strong>on</strong>e due to some<br />

problem in shipping the artifact to India. Thus, NPLI was scheduled to the last<br />

participant for measurement during October 2010 while measurements of the other<br />

participants went according to the original plan.<br />

The table 3 shows the original schedule and actual time of measurement<br />

Table 3 Original schedule and actual time of measurement<br />

Institute/Country Original schedule Actual schedule<br />

Nati<strong>on</strong>al Institute of Metrology<br />

(Thailand)<br />

Physikalisch-Technische<br />

Bundesanstalt (PTB)<br />

Standards and Calibrati<strong>on</strong><br />

Laboratory (SCL)<br />

1-14 May 2010 1-14 May 2010<br />

1-15 June 2010 1-15 June 2010<br />

1-15 August 2010 1-15 August 2010<br />

Page 7 of 77