19.06.2013 Views

APMP.M.H-S3 Final Report Comparison on Hardness ... - BIPM

APMP.M.H-S3 Final Report Comparison on Hardness ... - BIPM

APMP.M.H-S3 Final Report Comparison on Hardness ... - BIPM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Revisi<strong>on</strong>: final <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>APMP</str<strong>on</strong>g>.M.H-<str<strong>on</strong>g>S3</str<strong>on</strong>g><br />

<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

<str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> <strong>on</strong> <strong>Hardness</strong> Measurement Rockwell scale A and B<br />

Tassanai Sanp<strong>on</strong>pute 1 , Apichaya Meesaplak 1 , Febo Menelao 2 , T. K. Chan 3 , Gun-Wo<strong>on</strong>g<br />

Bahng 4 , S.S.K.Titus 5 , S.K. Jain 5<br />

1 NIMT: Nati<strong>on</strong>al Institute of Metrology (Thailand), 3/5 Moo 3, Kl<strong>on</strong>g 5, Kl<strong>on</strong>g Luang,<br />

Pathumthani Province, 12120, Thailand<br />

2 PTB : Physikalisch-Technische Bundesanstalt, Bundesallee 100, 38116 Braunschweig,<br />

Germany<br />

3 SCL: Standards and Calibrati<strong>on</strong> Laboratory, 36/F Immigrati<strong>on</strong> Tower, 7 Gloucester Road,<br />

Wanchai, H<strong>on</strong>g K<strong>on</strong>g<br />

4 KRISS: Korea Research Institute of Standards and Science 209 gaje<strong>on</strong>g-ro, Yuse<strong>on</strong>g-gu,<br />

Daeje<strong>on</strong> 305-340, Korea<br />

5 NPLI: Force & <strong>Hardness</strong> Standards, Nati<strong>on</strong>al Physical Laboratory, Dr. K.S. Krishnan<br />

Marg, New Delhi 110012, India<br />

Page 1 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Abstract<br />

The <str<strong>on</strong>g>APMP</str<strong>on</strong>g>.M.H-<str<strong>on</strong>g>S3</str<strong>on</strong>g> Rockwell hardness intercomparis<strong>on</strong> was initiated by NIMT,<br />

Thailand and the required protocol was prepared by NIMT and was checked by Dr.John<br />

Man, MNIA, Australia in 2009. In this comparis<strong>on</strong>, PTB, Germany, Standards and<br />

Calibrati<strong>on</strong> Laboratory (SCL), H<strong>on</strong>g K<strong>on</strong>g, Nati<strong>on</strong>al Physical Laboratory (NPLI), India,<br />

and Korea Research Institute of Standards and Science (KRISS), Korea have<br />

participated. This comparis<strong>on</strong> exercise was focused in the measurement range of 25-100<br />

HRBW scale and 35-85 HRA scale. The Round Robin test was d<strong>on</strong>e during the period<br />

of April 2010 to October 2010. The participated NMIs have dem<strong>on</strong>strated the capability<br />

of the machine and the operating c<strong>on</strong>diti<strong>on</strong>s according to ISO 6508 Part3 to perform the<br />

measurements. However, SCL, H<strong>on</strong>g K<strong>on</strong>g could dem<strong>on</strong>strate their capability to<br />

perform the measurements <strong>on</strong>ly according to ISO 6508 part2. The CMC declared by the<br />

different laboratories lie in the range of 0.30 HRA to 0.40 HRA and 0.40 HRBW to<br />

0.75 HRBW. The CMC declared by SCL for the Rockwell B scale is 1.5HRBW due to<br />

the reas<strong>on</strong> described above. It is observed from the results that the measurement<br />

uncertainty is estimated not less than the CMC declared by the laboratories. From the<br />

measurement results provided by all the participated laboratories, the En ratio was<br />

determined to establish the degree of equivalence. The En ratio was calculated by<br />

including as well as by excluding the results of the laboratory which has performed the<br />

test according to ISO 6508 Part2 in order to make sure that it does not affect the overall<br />

results. It is noticed that the En ratio still found to remain less than 1.<br />

Page 2 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

C<strong>on</strong>tent<br />

1. Introducti<strong>on</strong> ............................................................................................................... 6<br />

2. Participating Institutes ............................................................................................... 6<br />

3. Schedule .................................................................................................................... 7<br />

4. Artifacts ..................................................................................................................... 8<br />

5. Measurement of Artifacts........................................................................................... 9<br />

6. HRA Measurement Data .......................................................................................... 10<br />

7. HRB Measurement Data .......................................................................................... 14<br />

8. Analyzing Method of <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> Results ............................................................... 19<br />

9. <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> Results ................................................................................................. 21<br />

10. Discussi<strong>on</strong> and C<strong>on</strong>clusi<strong>on</strong> ...................................................................................... 27<br />

11. Measurement <str<strong>on</strong>g>Report</str<strong>on</strong>g> ................................................................................................ 28<br />

Measurement report of PTB Laboratory .................................................................... 29<br />

Measurement report of NIMT Laboratory ................................................................. 36<br />

Measurement report of KRISS Laboratory ................................................................ 50<br />

Measurement report of NPLI Laboratory .................................................................. 61<br />

Measurement report of SCL Laboratory .................................................................... 69<br />

12. References ............................................................................................................... 77<br />

Page 3 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

C<strong>on</strong>tent of Table<br />

Table 1 List of participants ................................................................................................. 6<br />

Table 2 List of CMC declarati<strong>on</strong> ........................................................................................ 7<br />

Table 3 Original schedule and actual time of measurement ................................................. 7<br />

Table 4 Artifact Identificati<strong>on</strong>s ........................................................................................... 8<br />

Table 5 NIMT’s HRA Measurement Result ..................................................................... 10<br />

Table 6 PTB’s HRA Measurement Result ........................................................................ 11<br />

Table 7 KRISS’s HRA Measurement Result .................................................................... 12<br />

Table 8 NPLI’s HRA Measurement Result ...................................................................... 13<br />

Table 9 NIMT’s HRB Measurement Result ...................................................................... 14<br />

Table 10 PTB’s HRB Measurement Result ....................................................................... 15<br />

Table 11 SCL’s HRB Measurement Result ....................................................................... 16<br />

Table 12 KRISS’s HRB Measurement Result ................................................................... 17<br />

Table 13 NPLI’s HRB Measurement Result .................................................................... 18<br />

Table 14 C<strong>on</strong>clusi<strong>on</strong> of comparis<strong>on</strong> evaluati<strong>on</strong> <strong>on</strong> Rockwell hardness scale A ................. 21<br />

Table 15 C<strong>on</strong>clusi<strong>on</strong> of comparis<strong>on</strong> evaluati<strong>on</strong> <strong>on</strong> Rockwell hardness scale B .................. 23<br />

Table 16 C<strong>on</strong>clusi<strong>on</strong> of comparis<strong>on</strong> evaluati<strong>on</strong> <strong>on</strong> Rockwell hardness scale B without<br />

SCL’s results ............................................................................................................ 25<br />

Page 4 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

C<strong>on</strong>tent of Figure<br />

Figure 1 Indentati<strong>on</strong> positi<strong>on</strong> .............................................................................................. 9<br />

Figure 2 Deviati<strong>on</strong> from reference value of HRA measurement comparis<strong>on</strong> ..................... 22<br />

Figure 3 En Ratio of HRA measurement comparis<strong>on</strong> ........................................................ 22<br />

Figure 4 Deviati<strong>on</strong> value of HRB measurement comparis<strong>on</strong> ............................................. 24<br />

Figure 5 En Ratio of HRB measurement comparis<strong>on</strong> ........................................................ 24<br />

Figure 6 Deviati<strong>on</strong> value of HRB measurement comparis<strong>on</strong> without SCL’s results.......... 26<br />

Figure 7 En Ratio of HRB measurement comparis<strong>on</strong> without SCL’s results ..................... 26<br />

Figure 8 Variati<strong>on</strong> of hardness measurement in Rockwell scale A .................................... 27<br />

Figure 9 Variati<strong>on</strong> of hardness measurement in Rockwell scale B .................................... 27<br />

Page 5 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

1. Introducti<strong>on</strong><br />

There is a great demand to organize a measurement comparis<strong>on</strong> in HRA and HRB from<br />

some Nati<strong>on</strong>al Institute of Metrology in ASEAN countries and may be in some <str<strong>on</strong>g>APMP</str<strong>on</strong>g><br />

members in order to establish the CMC of the participating Nati<strong>on</strong>al Metrological<br />

Institutes (NMI). In view of this, the Nati<strong>on</strong>al Institute of Metrology, Thailand (NIMT)<br />

has taken the initiative to be the pilot laboratory to organize the comparis<strong>on</strong>.<br />

Physikalish – Techniche Bundesansralt, Germany (PTB) has participated as an invited<br />

laboratory from EUROMET as they have a l<strong>on</strong>g experience and good reputati<strong>on</strong> in<br />

hardness measurements. In this comparis<strong>on</strong>, Standards and Calibrati<strong>on</strong> Laboratory<br />

(SCL), H<strong>on</strong>g K<strong>on</strong>g, Nati<strong>on</strong>al Physical Laboratory (NPLI), India, and Korea Research<br />

Institute of Standards and Science (KRISS), Korea have shown keen interest for<br />

participati<strong>on</strong>.<br />

The first objective of this comparis<strong>on</strong> is to determine the capability of the primary<br />

Rockwell hardness machine, including standard c<strong>on</strong>diti<strong>on</strong>s, of each participant. The<br />

sec<strong>on</strong>d objective is to c<strong>on</strong>firm the calibrati<strong>on</strong> and measurement capability (CMC) of<br />

Rockwell hardness scale A and B measurement declared by the participants.<br />

2. Participating Institutes<br />

The list of participants and the CMC declared by them are given in table 1 and table 2<br />

as below:<br />

Table 1 List of participants<br />

Participant Address C<strong>on</strong>tact informati<strong>on</strong><br />

Nati<strong>on</strong>al Institute of<br />

Metrology (Thailand),<br />

NIMT<br />

Physikalisch-Technische<br />

Bundesanstalt, PTB<br />

Standards and Calibrati<strong>on</strong><br />

Laboratory, SCL<br />

Korea Research Institute<br />

of Standards and Science,<br />

KRISS<br />

Nati<strong>on</strong>al Physical<br />

Laboratory, (NPLI)<br />

3 / 4-5 Moo 3, Kl<strong>on</strong>g 5,<br />

Kl<strong>on</strong>gLuang, Pathumthani 12120,<br />

Thailand<br />

5.12: <strong>Hardness</strong> and Layer<br />

Thickness Measurement<br />

Technique Bundesallee 100 38116<br />

Braunschweig<br />

Germany<br />

36/F Immigrati<strong>on</strong> Tower,<br />

7 Gloucester Road,<br />

Wanchai, H<strong>on</strong>g K<strong>on</strong>g<br />

209 gaje<strong>on</strong>g-ro, Yuse<strong>on</strong>g-gu,<br />

Daeje<strong>on</strong> 305-340, Korea<br />

Dr. K.S. Krishnan Marg, New<br />

Delhi 110012, India<br />

tassanai@nimt.or.th<br />

Tel: +66 (0)2584 3090<br />

febo.menelao@ptb.de<br />

Tel: +49 (0)531 592-<br />

5145<br />

tkchan@itc.gov.hk<br />

gwbahng@kriss.re.kr<br />

skjain@mail.nplindia.org<br />

Tel: +91 11 456 08680<br />

Page 6 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Participant<br />

Nati<strong>on</strong>al Institute of<br />

Metrology (Thailand),<br />

NIMT<br />

Table 2 List of CMC declarati<strong>on</strong><br />

Calibrati<strong>on</strong> and Measurement Capability (CMC)<br />

Rockwell scale A Rockwell scale B<br />

0.38 HRA 0.40 HRB<br />

Physikalisch-Technische<br />

Bundesanstalt, PTB<br />

0.30 HRA 0.50 HRB<br />

Standards and Calibrati<strong>on</strong><br />

Laboratory, SCL<br />

- 1.5 HRB<br />

Korea Research Institute<br />

of Standards and Science,<br />

KRISS 0.40 HRA<br />

0.60 HRB for nominal<br />

more than 50 HRB<br />

0.75 HRB for nominal<br />

not more than 50 HRB<br />

Nati<strong>on</strong>al Physical<br />

Laboratory, NPLI<br />

0.30 HRA<br />

0.50 HRB for nominal<br />

more than 60 HRB<br />

0.60 HRB for nominal<br />

not more than 60 HRB<br />

3. Schedule<br />

The comparis<strong>on</strong> started at the pilot lab, NIMT, in May 2010. The original schedule was<br />

to transfer the artifact from NIMT, PTB, NPLI, SCL, and KRISS respectively with 2<br />

weeks for measurement and 2 weeks for transportati<strong>on</strong> process. The actual<br />

measurement schedule was slightly changed from the tentative <strong>on</strong>e due to some<br />

problem in shipping the artifact to India. Thus, NPLI was scheduled to the last<br />

participant for measurement during October 2010 while measurements of the other<br />

participants went according to the original plan.<br />

The table 3 shows the original schedule and actual time of measurement<br />

Table 3 Original schedule and actual time of measurement<br />

Institute/Country Original schedule Actual schedule<br />

Nati<strong>on</strong>al Institute of Metrology<br />

(Thailand)<br />

Physikalisch-Technische<br />

Bundesanstalt (PTB)<br />

Standards and Calibrati<strong>on</strong><br />

Laboratory (SCL)<br />

1-14 May 2010 1-14 May 2010<br />

1-15 June 2010 1-15 June 2010<br />

1-15 August 2010 1-15 August 2010<br />

Page 7 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Korea Research Institute of<br />

Standards and Science (KRISS)<br />

Nati<strong>on</strong>al Physical Laboratory<br />

India<br />

1-15 September 2010 1-15 September 2010<br />

1-15 July 2010 1-15 October 2010<br />

SCL, H<strong>on</strong>g K<strong>on</strong>g was able to make the measurement <strong>on</strong>ly in HRB scale, while others<br />

participants made the measurement in all the range of hardness scales, i.e. both in HRA<br />

and HRB.<br />

4. Artifacts<br />

The artifact reference blocks for Rockwell hardness scale A and scale B are<br />

manufactured by Asahi Giken Co.,Ltd. Japan. Each scale c<strong>on</strong>sists of hardness block<br />

with serial number as in the table 4. The dimensi<strong>on</strong>s of the blocks are 65 mm in<br />

diameter and thickness of each block as in the table 4. All hardness block with 10.5 mm<br />

thickness are made from brass while the rest is made from steel.<br />

Table 4 Artifact Identificati<strong>on</strong>s<br />

HRA Set S/N Thickness HRB Set S/N Thickness<br />

35 HRA A32517 11.5 mm 25 HRB E1620 10.5 mm<br />

40 HRA A33781 11.5 mm 30 HRB B30120 10.5 mm<br />

55 HRA 25568 15 mm 40 HRB A31382 10.5 mm<br />

60 HRA B12037 15 mm 50 HRB A32411 10.5 mm<br />

70 HRA B15871 15 mm 60 HRB A33748 10.5 mm<br />

80 HRA A27761 15 mm 70 HRB A28422 10.5 mm<br />

85 HRA A21048 15 mm 80 HRB A35542 10.5 mm<br />

90 HRB 25566 15 mm<br />

100 HRB 30836 15 mm<br />

The surface of each artifact block was laser engraved with divided segments for<br />

indicating the indentati<strong>on</strong> positi<strong>on</strong>s (Figure 1). Each segment is used for single<br />

Page 8 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

indentati<strong>on</strong> in the comparis<strong>on</strong>. There are 9 areas of measurement <strong>on</strong> each block. The<br />

rest of the segments <strong>on</strong> the block surface are reserved as alternative places for trial and<br />

error measurements<br />

Figure 1 Indentati<strong>on</strong> positi<strong>on</strong><br />

The plastic sheet indicating the indentati<strong>on</strong> positi<strong>on</strong> of each participant will be<br />

enclosed with the artifact sets. It shall be placed <strong>on</strong> the artifact block in order to ensure<br />

the indentati<strong>on</strong> positi<strong>on</strong> before making the indentati<strong>on</strong>.<br />

5. Measurement of Artifacts<br />

The primary Rockwell hardness machines used for the comparis<strong>on</strong> must be passed<br />

the verificati<strong>on</strong> according to ISO 6508-3 [1]. Before making the indentati<strong>on</strong> <strong>on</strong> each<br />

block, the testing cycle must be adjusted to comply with ISO 6508-3. Then start to<br />

measure the hardness value of artifact blocks by making 9 indentati<strong>on</strong>s each block <strong>on</strong><br />

the designated area <strong>on</strong> the indentati<strong>on</strong>-positi<strong>on</strong>ing sheet.<br />

Each participant must give a characteristics descripti<strong>on</strong> of your primary Rockwell<br />

hardness machine, your primary indenter, testing c<strong>on</strong>diti<strong>on</strong> and envir<strong>on</strong>mental<br />

informati<strong>on</strong>. Also laboratory must report the measurement results for each indentati<strong>on</strong><br />

and the uncertainty of measurement of Rockwell hardness scale A and Rockwell<br />

hardness scale B, and uncertainty budget of measurement.<br />

Page 9 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

6. HRA Measurement Data<br />

Table 5 NIMT’s HRA Measurement Result<br />

Measure value (HRA)<br />

No. A32517 A33781 25568 B12037 B15871 A27761 A21048<br />

Nominal value 35 40 55 60 70 80 85<br />

Secti<strong>on</strong>1 35.41 38.99 54.98 60.47 70.53 81.29 85.43<br />

Secti<strong>on</strong>2 35.25 39.11 55.05 60.45 70.60 81.28 85.37<br />

Secti<strong>on</strong>3 35.17 39.23 55.05 60.47 70.56 81.25 85.39<br />

Secti<strong>on</strong>4 35.26 39.12 55.06 60.43 70.58 81.28 85.38<br />

Secti<strong>on</strong>5 35.08 39.53 55.05 60.37 70.52 81.33 85.25<br />

Secti<strong>on</strong>6 35.29 39.31 55.12 60.42 70.56 81.26 85.25<br />

Secti<strong>on</strong>7 35.24 38.94 55.06 60.44 70.61 81.31 85.22<br />

Secti<strong>on</strong>8 35.44 38.98 55.03 60.45 70.64 81.34 85.28<br />

Secti<strong>on</strong>9 35.15 38.70 55.08 60.47 70.59 81.32 85.33<br />

Average Value 35.25 39.10 55.05 60.44 70.58 81.30 85.32<br />

Uniformity 0.36 0.83 0.14 0.10 0.12 0.09 0.21<br />

Correcti<strong>on</strong> Value 0.08 0.08 0.08 0.08 0.08 0.08 0.08<br />

Corrected Value 35.33 39.18 55.13 60.52 70.65 81.37 85.40<br />

Expanded uncertainty (k=2) 0.40 0.43 0.39 0.39 0.39 0.38 0.39<br />

Page 10 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Table 6 PTB’s HRA Measurement Result<br />

Measure value (HRA)<br />

No. A32517 A33781 25568 B12037 B15871 A27761 A21048<br />

Nominal value 35 40 55 60 70 80 85<br />

Secti<strong>on</strong>1 34.84 38.84 54.96 60.66 70.79 81.47 85.55<br />

Secti<strong>on</strong>2 35.48 39.24 55.15 60.67 70.87 81.48 85.61<br />

Secti<strong>on</strong>3 34.90 38.58 55.17 60.61 70.84 81.45 85.57<br />

Secti<strong>on</strong>4 35.00 39.06 55.21 60.57 70.88 81.53 85.41<br />

Secti<strong>on</strong>5 34.98 39.31 55.25 60.58 70.79 81.52 85.45<br />

Secti<strong>on</strong>6 35.22 39.25 55.17 60.60 70.77 81.45 85.50<br />

Secti<strong>on</strong>7 35.16 38.75 55.14 60.62 70.87 81.51 85.42<br />

Secti<strong>on</strong>8 35.51 38.98 55.17 60.64 70.92 81.48 85.42<br />

Secti<strong>on</strong>9 35.41 38.78 55.24 60.63 70.88 81.51 85.56<br />

Average Value 35.17 38.98 55.16 60.62 70.85 81.49 85.50<br />

Uniformity 0.67 0.73 0.29 0.10 0.15 0.08 0.20<br />

Correcti<strong>on</strong> Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Corrected Value 35.17 38.98 55.16 60.62 70.85 81.49 85.50<br />

Expanded uncertainty (k=2) 0.35 0.35 0.31 0.30 0.30 0.30 0.30<br />

Page 11 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Table 7 KRISS’s HRA Measurement Result<br />

Measure value (HRA)<br />

No. A32517 A33781 25568 B12037 B15871 A27761 A21048<br />

Nominal value 35 40 55 60 70 80 85<br />

Secti<strong>on</strong>1 36.40 40.00 54.70 60.20 70.70 81.20 85.50<br />

Secti<strong>on</strong>2 35.40 39.21 54.90 60.20 70.80 81.40 85.50<br />

Secti<strong>on</strong>3 35.60 39.90 55.00 60.40 70.80 81.40 85.50<br />

Secti<strong>on</strong>4 35.60 39.30 55.00 60.40 70.70 81.30 85.40<br />

Secti<strong>on</strong>5 35.40 39.70 54.90 60.30 70.70 81.40 85.50<br />

Secti<strong>on</strong>6 35.60 39.30 55.00 60.40 70.60 81.40 85.30<br />

Secti<strong>on</strong>7 35.30 39.30 54.80 60.30 70.80 81.35 85.50<br />

Secti<strong>on</strong>8 35.40 39.00 54.90 60.30 70.70 81.40 85.40<br />

Secti<strong>on</strong>9 35.50 39.10 54.90 60.20 70.60 81.40 85.30<br />

Average Value 35.58 39.42 54.90 60.30 70.71 81.36 85.43<br />

Uniformity 1.10 1.00 0.30 0.20 0.20 0.20 0.20<br />

Correcti<strong>on</strong> Value -0.03 -0.03 -0.03 -0.04 -0.04 -0.04 -0.04<br />

Corrected Value 35.55 39.39 54.87 60.26 70.67 81.32 85.39<br />

Expanded uncertainty (k=2) 0.46 0.47 0.40 0.40 0.40 0.40 0.40<br />

Page 12 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Table 8 NPLI’s HRA Measurement Result<br />

Measure value (HRA)<br />

No. A32517 A33781 25568 B12037 B15871 A27761 A21048<br />

Nominal value 35 40 55 60 70 80 85<br />

Secti<strong>on</strong>1 35.48 38.49 55.46 60.74 70.66 81.54 85.91<br />

Secti<strong>on</strong>2 35.47 38.42 55.31 60.77 70.79 81.55 85.94<br />

Secti<strong>on</strong>3 35.31 39.34 55.14 60.46 70.88 81.57 85.87<br />

Secti<strong>on</strong>4 35.16 39.26 55.29 60.45 70.88 81.55 85.68<br />

Secti<strong>on</strong>5 35.12 39.51 55.33 60.53 70.91 81.55 85.80<br />

Secti<strong>on</strong>6 35.28 39.36 55.19 60.56 70.90 81.56 85.78<br />

Secti<strong>on</strong>7 35.34 39.41 55.09 60.63 70.80 81.57 85.72<br />

Secti<strong>on</strong>8 35.20 39.46 54.98 60.55 70.85 81.49 85.67<br />

Secti<strong>on</strong>9 35.40 39.19 55.13 60.63 70.94 81.68 85.81<br />

Average Value 35.31 39.16 55.21 60.59 70.85 81.56 85.80<br />

Uniformity 0.36 1.09 0.48 0.32 0.28 0.19 0.27<br />

Correcti<strong>on</strong> Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Corrected Value 35.31 39.16 55.21 60.59 70.85 81.56 85.80<br />

Expanded uncertainty (k=2) 0.31 0.42 0.32 0.31 0.31 0.30 0.31<br />

Page 13 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

7. HRB Measurement Data<br />

Table 9 NIMT’s HRB Measurement Result<br />

Measure value (HRBW)<br />

No. E1620 B30120 A31382 A32411 A33748 A28422 A35542 25566 30836<br />

Nominal value 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong>1 23.88 28.60 37.82 51.05 59.70 69.74 79.79 90.13 100.14<br />

Secti<strong>on</strong>2 24.29 28.38 37.85 51.14 59.28 69.53 78.72 90.47 100.10<br />

Secti<strong>on</strong>3 24.32 28.48 37.66 51.05 59.63 69.40 80.19 90.46 100.11<br />

Secti<strong>on</strong>4 23.97 28.70 37.96 50.95 59.98 69.37 79.52 90.45 100.09<br />

Secti<strong>on</strong>5 24.18 28.62 37.40 50.99 58.96 69.56 79.66 90.40 100.05<br />

Secti<strong>on</strong>6 24.22 28.21 37.54 51.13 59.40 69.97 80.19 90.49 99.95<br />

Secti<strong>on</strong>7 23.84 28.37 37.84 50.91 59.67 69.57 79.61 90.56 99.94<br />

Secti<strong>on</strong>8 24.14 28.65 37.61 50.87 59.82 69.35 78.96 90.51 99.96<br />

Secti<strong>on</strong>9 23.79 28.63 37.75 50.84 59.73 69.85 79.38 90.45 100.02<br />

Average Value 24.07 28.52 37.71 50.99 59.57 69.59 79.56 90.44 100.04<br />

Uniformity 0.53 0.49 0.56 0.30 1.02 0.62 1.47 0.43 0.20<br />

Correcti<strong>on</strong> Value 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06<br />

Corrected Value 24.13 28.57 37.77 51.05 59.63 69.65 79.61 90.49 100.10<br />

Expanded uncertainty (k=2) 0.40 0.40 0.40 0.40 0.40 0.40 0.41 0.40 0.40<br />

Page 14 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Table 10 PTB’s HRB Measurement Result<br />

Measure value (HRBW)<br />

No. E1620 B30120 A31382 A32411 A33748 A28422 A35542 25566 30836<br />

Nominal value 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong>1 23.22 28.84 37.86 51.05 60.13 70.32 79.25 89.73 99.76<br />

Secti<strong>on</strong>2 23.34 28.88 37.69 51.12 60.49 70.19 79.49 90.03 99.76<br />

Secti<strong>on</strong>3 22.99 28.94 37.54 51.05 59.94 69.90 79.32 90.01 99.74<br />

Secti<strong>on</strong>4 22.76 28.32 37.56 50.77 59.71 69.66 79.73 90.01 99.67<br />

Secti<strong>on</strong>5 23.55 28.38 37.29 50.87 59.46 69.68 79.38 90.00 99.70<br />

Secti<strong>on</strong>6 23.38 28.50 37.85 50.99 59.67 69.75 80.24 90.01 99.60<br />

Secti<strong>on</strong>7 23.66 28.34 37.52 50.93 60.04 69.80 80.04 90.05 99.60<br />

Secti<strong>on</strong>8 23.32 28.43 37.78 50.82 60.09 69.71 79.67 90.02 99.61<br />

Secti<strong>on</strong>9 23.89 28.70 37.78 50.91 60.04 69.89 79.45 89.96 99.65<br />

Average Value 23.35 28.59 37.65 50.95 59.95 69.88 79.62 89.98 99.68<br />

Uniformity 1.14 0.61 0.57 0.35 1.03 0.66 0.99 0.32 0.16<br />

Correcti<strong>on</strong> Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Corrected Value 23.35 28.59 37.65 50.95 59.95 69.88 79.62 89.98 99.68<br />

Expanded uncertainty (k=2) 0.56 0.53 0.52 0.51 0.54 0.53 0.55 0.50 0.50<br />

Page 15 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Table 11 SCL’s HRB Measurement Result<br />

Measure value (HRBW)<br />

No. E1620 B30120 A31382 A32411 A33748 A28422 A35542 25566 30836<br />

Nominal value 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong>1 26.75 31.30 40.25 53.30 61.95 71.60 81.05 91.55 100.95<br />

Secti<strong>on</strong>2 26.65 31.45 40.05 53.20 61.60 71.35 80.90 91.55 100.95<br />

Secti<strong>on</strong>3 27.00 30.95 40.45 52.95 61.60 71.50 81.55 91.40 101.00<br />

Secti<strong>on</strong>4 26.60 30.70 40.10 52.90 61.15 71.50 80.30 91.45 100.90<br />

Secti<strong>on</strong>5 25.95 30.50 39.50 52.60 61.15 71.20 80.35 91.50 100.85<br />

Secti<strong>on</strong>6 26.70 30.15 39.75 52.80 61.35 71.20 81.20 91.50 100.85<br />

Secti<strong>on</strong>7 25.85 29.05 40.00 53.00 61.75 71.20 80.50 91.50 100.85<br />

Secti<strong>on</strong>8 26.60 30.75 40.30 53.05 61.90 71.50 80.90 91.60 100.90<br />

Secti<strong>on</strong>9 25.60 30.70 39.50 53.10 61.30 71.40 80.35 91.45 100.80<br />

Average Value 26.41 30.62 39.99 52.99 61.53 71.38 80.79 91.50 100.89<br />

Uniformity 1.40 2.40 0.95 0.70 0.80 0.40 1.25 0.20 0.20<br />

Correcti<strong>on</strong> Value -0.50 -0.50 -0.50 -0.50 -0.50 -0.50 -0.50 -0.50 -0.50<br />

Corrected Value 25.91 30.12 39.49 52.49 61.03 70.88 80.29 91.00 100.39<br />

Expanded uncertainty (k=2) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00<br />

Page 16 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Table 12 KRISS’s HRB Measurement Result<br />

Measure value (HRBW)<br />

No. E1620 B30120 A31382 A32411 A33748 A28422 A35542 25566 30836<br />

Nominal value 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong>1 22.70 29.60 38.70 52.10 59.60 70.50 79.80 90.70 100.00<br />

Secti<strong>on</strong>2 22.80 29.40 38.70 50.90 59.80 70.00 79.20 90.30 100.20<br />

Secti<strong>on</strong>3 23.10 29.20 38.40 51.00 59.40 70.00 80.20 90.30 100.10<br />

Secti<strong>on</strong>4 23.80 29.50 38.60 50.90 59.70 70.00 79.80 90.30 100.10<br />

Secti<strong>on</strong>5 24.30 29.60 38.80 51.00 59.80 70.30 79.70 90.30 100.20<br />

Secti<strong>on</strong>6 23.90 29.60 38.40 51.00 59.90 70.90 80.50 90.40 100.10<br />

Secti<strong>on</strong>7 24.10 29.60 38.80 50.80 60.00 69.90 79.30 90.40 100.10<br />

Secti<strong>on</strong>8 23.70 29.40 38.40 50.70 60.20 70.00 80.50 90.30 100.10<br />

Secti<strong>on</strong>9 23.90 29.20 38.50 50.60 59.70 69.90 79.70 90.30 100.00<br />

Average Value 23.59 29.46 38.59 51.00 59.79 70.17 79.86 90.37 100.10<br />

Uniformity 1.60 0.40 0.40 1.50 0.80 1.00 1.30 0.40 0.20<br />

Correcti<strong>on</strong> Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Corrected Value 23.59 29.46 38.59 51.00 59.79 70.17 79.86 90.37 100.10<br />

Expanded uncertainty (k=2) 0.75 0.75 0.75 0.75 0.60 0.60 0.60 0.60 0.60<br />

Page 17 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Table 13 NPLI’s HRB Measurement Result<br />

Measure value (HRBW)<br />

No. E1620 B30120 A31382 A32411 A33748 A28422 A35542 25566 30836<br />

Nominal value 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong>1 23.14 29.67 37.14 51.41 59.32 69.76 79.09 90.12 99.96<br />

Secti<strong>on</strong>2 23.56 29.45 37.38 51.11 59.13 70.23 78.89 90.05 99.87<br />

Secti<strong>on</strong>3 23.59 29.43 36.90 51.50 59.19 69.97 79.80 90.09 100.08<br />

Secti<strong>on</strong>4 24.21 29.53 37.70 51.33 58.83 69.64 79.41 90.14 99.87<br />

Secti<strong>on</strong>5 24.77 29.74 37.82 51.49 58.88 69.93 79.66 90.03 99.80<br />

Secti<strong>on</strong>6 24.83 29.58 37.67 51.21 58.71 69.82 79.85 90.06 99.84<br />

Secti<strong>on</strong>7 24.70 29.26 37.87 51.24 59.35 69.73 79.32 90.38 99.85<br />

Secti<strong>on</strong>8 24.89 29.47 38.10 51.23 58.84 69.91 79.33 90.16 99.76<br />

Secti<strong>on</strong>9 24.86 29.52 38.24 50.80 59.28 69.50 78.85 90.18 99.76<br />

Average Value 24.28 29.52 37.65 51.26 59.06 69.83 79.36 90.13 99.87<br />

Uniformity 1.75 0.48 1.34 0.70 0.64 0.73 1.00 0.35 0.32<br />

Correcti<strong>on</strong> Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Corrected Value 24.28 29.52 37.65 51.26 59.06 69.83 79.36 90.13 99.87<br />

Expanded uncertainty (k=2) 0.70 0.60 0.60 0.60 0.60 0.52 0.56 0.51 0.51<br />

Page 18 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

8. Analyzing Method of <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> Results<br />

The measurement results are used to compute the degree of equivalence in <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g><br />

Reference Value (CRV) and En ratio. The calculati<strong>on</strong> is shown in following formulas:<br />

-Calculati<strong>on</strong> of <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> Reference Value (CRV)<br />

Pilot laboratory determined KCRV by calculating the weighted mean of<br />

measurements of all participants (xref).<br />

-The uncertainty of the CRV was calculated by following expressi<strong>on</strong>:<br />

Where:<br />

x = The measured value of participating institute i ( i =1,2,…,n)<br />

-Its deviati<strong>on</strong> from CRV<br />

-The uncertainty of this deviati<strong>on</strong> at a 95% level of c<strong>on</strong>fidence<br />

Where u(<br />

di<br />

) was given by<br />

And k = 2<br />

Page 19 of 77<br />

Eq. 1<br />

Eq. 2<br />

Eq. 3<br />

Eq. 4<br />

Eq. 5<br />

-Evaluati<strong>on</strong> of Coefficient En<br />

The equivalence between the measurements of participating institutes was expressed<br />

by coefficient E as well.<br />

Where:<br />

x<br />

u<br />

ref<br />

2<br />

<br />

1<br />

( x<br />

ref<br />

x<br />

1<br />

u<br />

2<br />

( x ) x<br />

1<br />

2<br />

2<br />

2<br />

1 u ( x ) 1<br />

u ( x ) ... 1<br />

u ( x )<br />

<br />

) u<br />

2<br />

1<br />

2<br />

1<br />

<br />

( x ) u<br />

1<br />

2<br />

u ( x ) ... x<br />

2<br />

1<br />

( x<br />

i<br />

u( xi<br />

) = The standard uncertainty of i x<br />

n<br />

E<br />

n<br />

<br />

d x x<br />

i<br />

i<br />

2<br />

2<br />

2<br />

... <br />

) u<br />

ref<br />

U ( di<br />

) k u(<br />

di<br />

)<br />

2<br />

n<br />

1<br />

( x<br />

2<br />

2<br />

2<br />

u ( d ) u ( x ) u ( x<br />

U<br />

2<br />

i<br />

x x<br />

i<br />

( x ) U<br />

i<br />

ref<br />

2<br />

i<br />

( x<br />

ref<br />

)<br />

ref<br />

2<br />

u ( x )<br />

n<br />

)<br />

)<br />

n<br />

n<br />

Eq. 6


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Where<br />

U ( xi<br />

) k u(<br />

xi<br />

)<br />

U ( xref<br />

) k u(<br />

xref<br />

)<br />

The was equivalent with CRV x at 95% c<strong>on</strong>fidence level, if E<br />

1.<br />

xi ref<br />

CRV is <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> Reference Value<br />

U(CRV) is uncertainty of CRV<br />

D_NMI is deviati<strong>on</strong> value of each NMIs from CRV<br />

U(D_NMI) is uncertainty of deviati<strong>on</strong> value of each NMIs from CRV<br />

En ratio NMI is degree of equivalence of each NMIs result expressed in<br />

En ratio<br />

Ue is expanded uncertainty that evaluated by each NMIs<br />

n<br />

Page 20 of 77<br />

Eq. 7


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

9. <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> Results<br />

The comparis<strong>on</strong> results, comparis<strong>on</strong> reference value (CRV), the deviati<strong>on</strong> value of each NMIs from CRV as well as their uncertainty and En<br />

ratio, are calculated and shown in Table 15, Figure 2 and Figure 3 for Rockwell scale A.<br />

Table 14 C<strong>on</strong>clusi<strong>on</strong> of comparis<strong>on</strong> evaluati<strong>on</strong> <strong>on</strong> Rockwell hardness scale A<br />

<str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> evaluati<strong>on</strong><br />

Nominal (HRA) 35 40 55 60 70 80 85<br />

CRV 35.31 39.15 55.12 60.53 70.78 81.46 85.55<br />

U(CRV) 0.18 0.21 0.17 0.17 0.17 0.17 0.17<br />

D_NIMT 0.02 0.03 0.01 -0.01 -0.12 -0.09 -0.15<br />

U(D_NIMT) 0.44 0.47 0.43 0.42 0.42 0.42 0.42<br />

En ratio NIMT 0.04 0.06 0.03 -0.02 -0.29 -0.21 -0.36<br />

D_PTB -0.14 -0.17 0.05 0.09 0.07 0.03 -0.05<br />

U(D_PTB) 0.40 0.41 0.35 0.35 0.35 0.34 0.35<br />

En ratio PTB -0.36 -0.41 0.13 0.27 0.20 0.08 -0.15<br />

D_KRISS 0.24 0.25 -0.25 -0.27 -0.10 -0.14 -0.16<br />

U(D_KRISS) 0.50 0.51 0.43 0.43 0.43 0.43 0.44<br />

En ratio KRISS 0.47 0.48 -0.56 -0.61 -0.24 -0.32 -0.36<br />

D_NPLI 0.00 0.01 0.10 0.07 0.07 0.10 0.25<br />

U(D_NPLI) 0.36 0.47 0.36 0.35 0.35 0.34 0.35<br />

En ratio NPLI -0.01 0.03 0.27 0.18 0.20 0.30 0.70<br />

Page 21 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Deviati<strong>on</strong> from CRV (HRA).<br />

En Ratio<br />

1.00<br />

0.50<br />

0.00<br />

-0.50<br />

-1.00<br />

<str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> result <strong>on</strong> Rockwell hardness scale A<br />

35 40 55 60 70 80 85 HRA<br />

D_NIMT D_PTB D_KRISS D_NPLI<br />

Figure 2 Deviati<strong>on</strong> from reference value of HRA measurement comparis<strong>on</strong><br />

2.00<br />

1.00<br />

0.00<br />

-1.00<br />

-2.00<br />

Degree of equivalence expressed in En ratio<br />

35 40 55 60 70 80 85 HRA<br />

En ratio NIMT En ratio PTB En ratio KRISS En ratio NPLI<br />

Figure 3 En Ratio of HRA measurement comparis<strong>on</strong><br />

Page 22 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

The comparis<strong>on</strong> results, comparis<strong>on</strong> reference value (CRV), the deviati<strong>on</strong> value of each NMIs from CRV as well as their uncertainty and En<br />

ratio, are calculated and shown in Table 16, Figure 4 and Figure 5 for Rockwell scale B show<br />

Table 15 C<strong>on</strong>clusi<strong>on</strong> of comparis<strong>on</strong> evaluati<strong>on</strong> <strong>on</strong> Rockwell hardness scale B<br />

Nominal (HRBW) 25 30 40 50 60 70 80 90 100<br />

KCRV 23.93 28.95 37.84 51.08 59.65 69.85 79.62 90.28 99.95<br />

U(KCRV) 0.27 0.28 0.26 0.26 0.25 0.25 0.26 0.24 0.24<br />

D_NIMT 0.20 -0.38 -0.08 -0.03 -0.02 -0.20 0.00 0.21 0.14<br />

U(D_NIMT) 0.48 0.58 0.48 0.48 0.47 0.47 0.48 0.47 0.47<br />

En ratio NIMT 0.41 -0.66 -0.16 -0.07 -0.04 -0.42 -0.01 0.45 0.31<br />

D_PTB -0.58 -0.36 -0.19 -0.13 0.30 0.03 0.00 -0.30 -0.27<br />

U(D_PTB) 0.62 0.60 0.58 0.57 0.60 0.58 0.61 0.56 0.56<br />

En ratio PTB -0.94 -0.59 -0.33 -0.23 0.50 0.06 0.00 -0.54 -0.49<br />

D_SCL 1.98 1.17 1.64 1.41 1.38 1.04 0.67 0.72 0.44<br />

U(D_SCL) 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.01 2.01<br />

En ratio SCL 0.98 0.58 0.82 0.70 0.68 0.52 0.33 0.36 0.22<br />

D_KRISS -0.34 0.51 0.74 -0.08 0.14 0.32 0.24 0.09 0.15<br />

U(D_KRISS) 0.80 0.80 0.79 0.79 0.65 0.65 0.65 0.65 0.65<br />

En ratio KRISS -0.42 0.63 0.94 -0.10 0.22 0.50 0.37 0.14 0.23<br />

D_NPLI 0.36 0.57 -0.20 0.18 -0.59 -0.01 -0.26 -0.14 -0.09<br />

U(D_NPLI) 0.75 0.66 0.65 0.65 0.65 0.58 0.62 0.56 0.56<br />

En ratio NPLI 0.48 0.86 -0.30 0.27 -0.90 -0.02 -0.42 -0.26 -0.15<br />

Page 23 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Deviati<strong>on</strong> from CRV (HRB)<br />

En Ratio<br />

5.00<br />

4.00<br />

3.00<br />

2.00<br />

1.00<br />

0.00<br />

-1.00<br />

-2.00<br />

2.00<br />

1.00<br />

0.00<br />

-1.00<br />

-2.00<br />

<str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> result <strong>on</strong> Rockwell hardness scale B<br />

25 30 40 50 60 70 80 90 100 HRB<br />

D_NIMT D_PTB D_SCL D_KRISS D_NPLI<br />

Figure 4 Deviati<strong>on</strong> value of HRB measurement comparis<strong>on</strong><br />

Degree of equivalence expressed in En ratio<br />

25 30 40 50 60 70 80 90 100 HRB<br />

En ratio NIMT En ratio PTB En ratio SCL<br />

En ratio KRISS En ratio NPLI<br />

Figure 5 En Ratio of HRB measurement comparis<strong>on</strong><br />

Page 24 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

To ensure that the SCL’ measurement results would not effect the other results, the evaluati<strong>on</strong> <strong>on</strong> Rockwell scale B was d<strong>on</strong>e again without<br />

SCL’s measurement results. The comparis<strong>on</strong> results, comparis<strong>on</strong> reference value (CRV), the deviati<strong>on</strong> value of each NMIs from CRV as well as<br />

their uncertainty and En ratio, are calculated and shown in Table 17, Figure 6 and Figure 7.<br />

Table 16 C<strong>on</strong>clusi<strong>on</strong> of comparis<strong>on</strong> evaluati<strong>on</strong> <strong>on</strong> Rockwell hardness scale B without SCL’s results<br />

Nominal (HRBW) 25 30 40 50 60 70 80 90 100<br />

CRV 23.89 28.92 37.82 51.05 59.63 69.83 79.61 90.27 99.94<br />

U(CRV) 0.27 0.29 0.26 0.26 0.26 0.25 0.26 0.24 0.24<br />

D_NIMT 0.24 -0.35 -0.05 -0.01 0.00 -0.18 0.01 0.22 0.15<br />

U(D_NIMT) 0.48 0.58 0.48 0.48 0.48 0.47 0.48 0.47 0.47<br />

En ratio NIMT 0.49 -0.61 -0.10 -0.02 0.01 -0.38 0.02 0.48 0.32<br />

D_PTB -0.54 -0.33 -0.16 -0.11 0.33 0.05 0.01 -0.29 -0.27<br />

U(D_PTB) 0.62 0.60 0.58 0.57 0.60 0.58 0.61 0.56 0.56<br />

En ratio PTB -0.87 -0.55 -0.28 -0.19 0.54 0.09 0.02 -0.52 -0.48<br />

D_KRISS -0.30 0.53 0.77 -0.05 0.16 0.34 0.25 0.10 0.16<br />

U(D_KRISS) 0.80 0.80 0.79 0.79 0.65 0.65 0.65 0.65 0.65<br />

En ratio KRISS -0.38 0.66 0.97 -0.07 0.25 0.52 0.38 0.15 0.24<br />

D_NPLI 0.39 0.59 -0.17 0.20 -0.57 0.00 -0.25 -0.13 -0.08<br />

U(D_NPLI) 0.75 0.67 0.65 0.65 0.65 0.58 0.62 0.56 0.56<br />

En ratio NPLI 0.53 0.89 -0.26 0.31 -0.87 0.01 -0.40 -0.24 -0.14<br />

Page 25 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Deviati<strong>on</strong> from CRV (HRB)<br />

Figure 6 Deviati<strong>on</strong> value of HRB measurement comparis<strong>on</strong> without SCL’s results<br />

En Ratio<br />

-1.00<br />

-2.00<br />

2.00<br />

1.00<br />

0.00<br />

-1.00<br />

-2.00<br />

2.00<br />

1.00<br />

0.00<br />

<str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> result <strong>on</strong> Rockwell hardness scale B<br />

25 30 40 50 60 70 80 90 100 HRB<br />

D_NIMT D_PTB D_KRISS D_NPLI<br />

Degree of equivalence expressed in En ratio<br />

25 30 40 50 60 70 80 90 100 HRB<br />

En ratio NIMT En ratio PTB En ratio KRISS En ratio NPLI<br />

Figure 7 En Ratio of HRB measurement comparis<strong>on</strong> without SCL’s results<br />

Page 26 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

10. Discussi<strong>on</strong> and C<strong>on</strong>clusi<strong>on</strong><br />

From the above comparis<strong>on</strong> results, the CMC claimed by the participated NMIs in<br />

the HRA scale is reaffirmed and hence they are acceptable. Also, it can be seen<br />

from the figure 8 that the variati<strong>on</strong> of hardness measurement by different NMI at the<br />

prescribed nominal values is less than 0.25HRA. This indicated that a CMC value of<br />

0.30 HRA is possible to achieve by NMIs for hardness primary standard.<br />

Deviati<strong>on</strong> (HRA)<br />

0.30<br />

0.25<br />

0.20<br />

0.15<br />

0.10<br />

0.05<br />

0.00<br />

Figure 8 Variati<strong>on</strong> of hardness measurement in Rockwell scale A<br />

Similarly, the variati<strong>on</strong> of hardness values measured by different NMI at the given<br />

nominal values for the HRB scale is shown in figure 9. Here, unlike in the case of<br />

HRA scale, the deviati<strong>on</strong> shown in the hardness measurement is very large<br />

(0.50HRB) for the lower range of HRB values i.e. for the soft materials having<br />

nominal values less than 60HRB. However the deviati<strong>on</strong> reduces to 0.20 HRB in the<br />

higher range of HRB scale, ie for the relatively harder materials having the nominal<br />

hardness value more than <strong>on</strong>e. This observati<strong>on</strong> str<strong>on</strong>gly suggests that NMI can<br />

achieve still a lower CMC in the higher range of hardness values (>60 HRB) for<br />

hardness primary standard<br />

Deviati<strong>on</strong> (HRB)<br />

30 40 50 60 70 80 90 HRA<br />

0.70<br />

0.60<br />

0.50<br />

0.40<br />

0.30<br />

0.20<br />

0.10<br />

0.00<br />

Deviati<strong>on</strong> Possible CMC achievement<br />

20 30 40 50 60 70 80 90 100HRB<br />

Deviati<strong>on</strong> Possible CMC achievement<br />

Figure 9 Variati<strong>on</strong> of hardness measurement in Rockwell scale B<br />

Page 27 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

11. Measurement <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Page 28 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Measurement report of PTB Laboratory<br />

Page 29 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Annex A Data report forms Page 1/6<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale A)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine<br />

Serial number of hardness primary machine RNG10<br />

Manufacturer of hardness primary machine WAZAU<br />

<strong>Hardness</strong> indicati<strong>on</strong> system Laserinterferometer<br />

Test force system<br />

Relative error of preliminary test force<br />

Dead weight<br />

Relative uncertainty (2) of preliminary test force<br />

Relative error of total test force<br />

5*10^-4<br />

Relative uncertainty (2) of total test force 5*10^-4<br />

Uncertainty of depth measuring device 0.1 µm<br />

Serial number of the indenter 839<br />

The tip radius of curvature of the indenter 0.195 mm<br />

The apex angle of c<strong>on</strong>e of the indenter 119°58'<br />

The calibrati<strong>on</strong> and measurement capability<br />

(CMC)<br />

0.3 HRA<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface 0.86 mm/s<br />

Holding time of preliminary test force 2.8 s<br />

Test force loading speed (final speed) 98.0 N/s<br />

Total test force durati<strong>on</strong> time 5.6 s<br />

Time before reading permanent indentati<strong>on</strong> depth 4.7 s<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Measurement place PTB<br />

Measurement date 2nd June 2010<br />

Envir<strong>on</strong>ment (20 ± 1) °C<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

Deformati<strong>on</strong> of frame (m)<br />

1 2 3<br />

0.227 0.215 0.199<br />

Page 30 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Data report forms Page 2/6<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale B)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine<br />

Serial number of hardness primary machine RNG10<br />

Manufacturer of hardness primary machine WAZAU<br />

<strong>Hardness</strong> indicati<strong>on</strong> system Laserinterferometer<br />

Test force system<br />

Relative error of preliminary test force<br />

Deth weight<br />

Relative uncertainty (2) of preliminary test force<br />

Relative error of total test force<br />

5*10^-4<br />

Relative uncertainty (2) of total test force 5*10^-4<br />

Uncertainty of depth measuring device 0.1 µm<br />

The calibrati<strong>on</strong> and measurement capability<br />

(CMC)<br />

0.5 HRB<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface 0.86 mm/s<br />

Holding time of preliminary test force 2.5 s<br />

Test force loading speed (final speed) 103 N/s<br />

Total test force durati<strong>on</strong> time 5.5 s<br />

Time before reading permanent indentati<strong>on</strong> depth 4.8 s<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Measurement place PTB<br />

Measurement date 1st June 2010<br />

Envir<strong>on</strong>ment (20 ± 1) °C<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

Deformati<strong>on</strong> of frame (m)<br />

1 2 3<br />

0.324 0.311 0.297<br />

Page 31 of 77


Revisi<strong>on</strong>: final <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Laboratory:<br />

PTB<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form2 - Result of the Rockwell hardness scale A measurements (35 - 85 HRA) Page 3/6<br />

Measured<br />

Checked<br />

Measured<br />

by: Febo Menelao<br />

by: S. Lutz<br />

date: 2nd June 2010<br />

<strong>Hardness</strong> Block Number A32517 A33781 A25568<br />

Measured value<br />

B12037 B15871 A27761 A21048<br />

Nominal Value (HRA) 35 40 55 60 70 80 85<br />

Secti<strong>on</strong> 1 34.84 38.84 54.96 60.66 70.79 81.47 85.55<br />

Secti<strong>on</strong> 2 35.48 39.24 55.15 60.67 70.87 81.48 85.61<br />

Secti<strong>on</strong> 3 34.90 38.58 55.17 60.61 70.84 81.45 85.57<br />

Secti<strong>on</strong> 4 35.00 39.06 55.21 60.57 70.88 81.53 85.41<br />

Secti<strong>on</strong> 5 34.98 39.31 55.25 60.58 70.79 81.52 85.45<br />

Secti<strong>on</strong> 6 35.22 39.25 55.17 60.60 70.77 81.45 85.50<br />

Secti<strong>on</strong> 7 35.16 38.75 55.14 60.62 70.87 81.51 85.42<br />

Secti<strong>on</strong> 8 35.51 38.98 55.17 60.64 70.92 81.48 85.42<br />

Secti<strong>on</strong> 9 35.41 38.78 55.24 60.63 70.88 81.51 85.56<br />

Average Value 35.17 38.98 55.16 60.62 70.85 81.49 85.50<br />

Uniformity 0.67 0.73 0.29 0.10 0.15 0.08 0.20<br />

Correcti<strong>on</strong> Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Corrected Value 35.17 38.98 55.16 60.62 70.85 81.49 85.50<br />

Expanded uncertainty (k=2) 0.35 0.35 0.31 0.30 0.30 0.30 0.30<br />

Remark: In case of the participant made an incorrect indentati<strong>on</strong> or is unsure about the measurement value, please report to the pilot institute.<br />

Page 32 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form3 - Result of the Rockwell hardness scale B measurements<br />

Laboratory: Measured Checked Measured<br />

PTB by: Febo Menelao<br />

by: S. Lutz<br />

measured value<br />

date: 1 st June 2010<br />

<strong>Hardness</strong> Block Number E1620 B30120 A31382 A32411 A33748 A34522 A35542 25566 30836<br />

Nominal Value (HRBW) 25 30 40 50 60 70 80 90 100<br />

Page 4/6<br />

Secti<strong>on</strong> 1 23.22 28 .84 37.86 51 .05 60.13 70 .32 79.25 89 .73 99 .76<br />

Secti<strong>on</strong> 2 23.34 28 .88 37.69 51 .12 60.49 70 .19 79.49 90 .03 99 .76<br />

Secti<strong>on</strong> 3 22.99 28 .94 37.54 51 .05 59.94 69 .90 79.32 90 .01 99 .74<br />

Secti<strong>on</strong> 4 22.76 28 .32 37.56 50 .77 59.71 69 .66 79.73 90 .01 99 .67<br />

Secti<strong>on</strong> 5 23.55 28 .38 37.29 50 .87 59.46 69 .68 79.38 90 .00 99 .70<br />

Secti<strong>on</strong> 6 23.38 28 .50 37.85 50 .99 59 .67 69.75 80 .24 90 .01 99.60<br />

Secti<strong>on</strong> 7 23.66 28.34 37 .52 50 .93 60 .04 69.80 80 .04 90 .05 99.60<br />

Secti<strong>on</strong> 8 23.32 28.43 37 .78 50 .82 60 .09 69.71 79 .67 90 .02 99.61<br />

Secti<strong>on</strong> 9 23.89 28.70 37 .78 50 .91 60 .04 69.89 79 .45 89 .96 99.65<br />

Average Value 23.35 28 .59 37 .65 50 .95 59.95 69.88 79 .62 89 .98 99.68<br />

Uniformity 0.34 0.25 0.19 0.12 0 .30 0 .23 0.34 0 .10 0.07<br />

Correcti<strong>on</strong> Value<br />

Corrected Value 23.35 28 .59 37 .65 50 .95 59.95 69.88 79 .62 89 .98 99.68<br />

Expanded uncertainty (k= 2) 0.56 0.53 0.52 0.51 0 .54 0 .53 0.55 0 .50 0.50<br />

Remark: In case of the participant made an incorrect indentati<strong>on</strong> or is unsure about the measurement value, please report to the pilot institute.<br />

Page 33 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 4 Uncertainty budget of measurement Page 5/6<br />

Uncertainty budget for 35 HRA<br />

Quantity Estimated<br />

Standard Sensitivity Uncertainty<br />

value<br />

uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

uxi<br />

<br />

3<br />

C i u i (H )<br />

Preliminary test force, F 0 0.05 N 0.0289 0.2272 0.0066<br />

Total test force, F 0.3 N 0.1732 -0.0917 -0.0159<br />

Permanent depth of measuring device, h 0.1 µm 0.0577 0.5000 0.0289<br />

Preliminary test force dwell time, t 0 0.2 s 0.1155 0.0489 0.0056<br />

Indentati<strong>on</strong> velocity, v 10 µm/s 5.7735 -0.0102 -0.0586<br />

Total test force dwell time, t 0.2 s 0.1155 -0.1060 -0.0122<br />

Indenter angle, 0.1 ° 0.0577 0.1800 0.0104<br />

Indenter radius, r 1 µm 0.5774 0.0580 0.0335<br />

Deformati<strong>on</strong> of frame, DF 0.2 µm 0.1155 0.5000 0.0577<br />

Combined uncertainty, u c<br />

Expanded uncertainty, Ue<br />

0.0965<br />

k=2 0.19<br />

Page 34 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 4 Uncertainty budget of measurement Page 6/6<br />

Uncertainty budget for 25 HRB<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value<br />

uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

uxi<br />

<br />

3<br />

C i u i (H )<br />

Preliminary test force, F 0 0.05 N 0.0289 0.1780 0.0051<br />

Total test force, F 0.5 N 0.2887 -0.1160 -0.0335<br />

Permanent depth of measuring device, h 0.1 µm 0.0577 0.5000 0.0289<br />

Preliminary test force dwell time, t 0 0.2 s 0.1155 -0.0617 -0.0071<br />

Indentati<strong>on</strong> velocity, v 10 µm/s 5.7735 0.0067 0.0387<br />

Total test force dwell time, t 0.2 s 0.1155 -0.0170 -0.0020<br />

Indenter diameter, d 0.1 µm 0.0577 0.0098 0.0006<br />

Deformati<strong>on</strong> of frame, DF 0.3 µm 0.1732 0.5000 0.0866<br />

Combined uncertainty, u c<br />

Expanded uncertainty, Ue<br />

0.1050<br />

k=2 0.21<br />

Page 35 of 77


Revisi<strong>on</strong>: final <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Measurement report of NIMT Laboratory<br />

Page 36 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Annex A Data report forms<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale A)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine SHT-31<br />

Serial number of hardness primary machine 310039<br />

Manufacturer of hardness primary machine Akashi – Japan<br />

<strong>Hardness</strong> indicati<strong>on</strong> system Laser hologauge<br />

Test force system Lever type<br />

Relative error of preliminary test force +0.01 % (+0.001 kgf)<br />

Relative uncertainty (2) of preliminary test force 0,030 %<br />

Relative error of total test force +0.001 % (+0.0033 kgf)<br />

Relative uncertainty (2) of total test force 0.01%<br />

Uncertainty of depth measuring device 0.2 m<br />

Serial number of the indenter 53495<br />

The tip radius of curvature of the indenter 200m ± 4m<br />

The apex angle of c<strong>on</strong>e of the indenter 120 ± 0.1<br />

The calibrati<strong>on</strong> and measurement capability (CMC) 0.38 HRA<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface 80-200 m/s<br />

Holding time of preliminary test force 3 s<br />

Test force loading speed 33 s<br />

Total test force durati<strong>on</strong> time 4 s<br />

Time before reading permanent indentati<strong>on</strong> depth 4 s<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Measurement place <strong>Hardness</strong> lab. NIMT<br />

Measurement date 28-29 April 2010<br />

Envir<strong>on</strong>ment (23±1)C ,(50±10)%RH<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

Deformati<strong>on</strong> of frame (m)<br />

1 2 3<br />

0.14 0.14 0.15<br />

Page 37 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Data report forms<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale B)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine SHT-31<br />

Serial number of hardness primary machine 310039<br />

Manufacturer of hardness primary machine Akashi - Japan<br />

<strong>Hardness</strong> indicati<strong>on</strong> system Laser hologauge<br />

Test force system Lever type<br />

Relative error of preliminary test force +0.01 % (+0.001 kgf)<br />

Relative uncertainty (2) of preliminary test force 0,030 %<br />

Relative error of total test force +0.01 % (+0.0057 kgf)<br />

Relative uncertainty (2) of total test force 0.01%<br />

Uncertainty of depth measuring device 0.2 m<br />

The diameter of ball indenter 1.5875 m ±2m<br />

The calibrati<strong>on</strong> and measurement capability (CMC) 0.40 HRB<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface 80-200 m/s<br />

Holding time of preliminary test force 3 s<br />

Test force loading speed 33 s<br />

Total test force durati<strong>on</strong> time 4 s<br />

Time before reading permanent indentati<strong>on</strong> depth 4 s<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Measurement place <strong>Hardness</strong> lab. NIMT<br />

Measurement date 28-23 April 2010<br />

Envir<strong>on</strong>ment (23±1)C ,(50±10)%RH<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

Deformati<strong>on</strong> of frame (m)<br />

1 2 3<br />

0.11 0.13 0.11<br />

Page 38 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form2 - Result of the Rockwell hardness scale A measurements (35 - 85 HRA)<br />

Page 3/5<br />

Laboratory: NIMT Measured Checked Measured<br />

by: Mr.Nitiwat Sasom by:Mr.Tassanai Sanp<strong>on</strong>pute date: 28/04/2010<br />

<strong>Hardness</strong> Block Number A32517 A33781 25568 B12037 B15871 A27761 A21048<br />

Nominal Value (HRA) 35 40 55 60 70 80 85<br />

Secti<strong>on</strong> 1 35.41 38.99 54.98 60.47 70.53 81.29 85.43<br />

Secti<strong>on</strong> 2 35.25 39.11 55.05 60.45 70.60 81.28 85.37<br />

Secti<strong>on</strong> 3 35.17 39.23 55.05 60.47 70.56 81.25 85.39<br />

Secti<strong>on</strong> 4 35.26 39.12 55.06 60.43 70.58 81.28 85.38<br />

Secti<strong>on</strong> 5 35.08 39.53 55.05 60.37 70.52 81.33 85.25<br />

Secti<strong>on</strong> 6 35.29 39.31 55.12 60.42 70.56 81.26 85.25<br />

Secti<strong>on</strong> 7 35.24 38.94 55.06 60.44 70.61 81.31 85.22<br />

Secti<strong>on</strong> 8 35.44 38.98 55.03 60.45 70.64 81.34 85.28<br />

Secti<strong>on</strong> 9 35.15 38.70 55.08 60.47 70.59 81.32 85.33<br />

Average Value 35.25 39.10 55.05 60.44 70.58 81.30 85.32<br />

Uniformity 0.36 0.83 0.14 0.10 0.12 0.09 0.21<br />

S.D. 0.12 0.24 0.04 0.03 0.04 0.03 0.07<br />

Correcti<strong>on</strong> Value 0.08 0.08 0.08 0.08 0.08 0.08 0.08<br />

Corrected Value 35.33 39.18 55.13 60.52 70.65 81.37 85.40<br />

Expanded uncertainty (k=2) 0.40 0.43 0.39 0.39 0.39 0.38 0.39<br />

Page 39 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form3 - Result of the Rockwell hardness scale B measurements (25-100 HRB)<br />

Laboratory: NIMT Measured Checked Measured<br />

Page 4/5<br />

by: Mr.Nitiwat Sasom by:Mr.Tassanai Sanp<strong>on</strong>pute date: 28/04/2010<br />

measured value<br />

<strong>Hardness</strong> Block Number E1620 B30120 A31382 A32411 A33748 A34522 A35542 25566 30836<br />

Nominal Value (HRBW) 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong> 1 23.88 28.60 37.82 51.05 59.70 69.74 79.79 90.13 100.14<br />

Secti<strong>on</strong> 2 24.29 28.38 37.85 51.14 59.28 69.53 78.72 90.47 100.10<br />

Secti<strong>on</strong> 3 24.32 28.48 37.66 51.05 59.63 69.40 80.19 90.46 100.11<br />

Secti<strong>on</strong> 4 23.97 28.70 37.96 50.95 59.98 69.37 79.52 90.45 100.09<br />

Secti<strong>on</strong> 5 24.18 28.62 37.40 50.99 58.96 69.56 79.66 90.40 100.05<br />

Secti<strong>on</strong> 6 24.22 28.21 37.54 51.13 59.40 69.97 80.19 90.49 99.95<br />

Secti<strong>on</strong> 7 23.84 28.37 37.84 50.91 59.67 69.57 79.61 90.56 99.94<br />

Secti<strong>on</strong> 8 24.14 28.65 37.61 50.87 59.82 69.35 78.96 90.51 99.96<br />

Secti<strong>on</strong> 9 23.79 28.63 37.75 50.84 59.73 69.85 79.38 90.45 100.02<br />

Average Value 24.07 28.52 37.71 50.99 59.57 69.59 79.56 90.44 100.04<br />

Uniformity 0.53 0.49 0.56 0.30 1.02 0.62 1.47 0.43 0.20<br />

S.D. 0.20 0.16 0.18 0.11 0.31 0.22 0.49 0.12 0.08<br />

Correcti<strong>on</strong> Value 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06<br />

Corrected Value 24.13 28.57 37.77 51.05 59.63 69.65 79.61 90.49 100.10<br />

Expanded uncertainty (k=2) 0.40 0.50 0.40 0.40 0.40 0.40 0.41 0.40 0.40<br />

Page 40 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 35 HRA A32517<br />

<strong>Hardness</strong> value, HRA 35.3 1242.9 35.3 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force,F o N 0.020 0.011 0.226 0.003<br />

Total test force, F N 0.588 0.340 -0.091 -0.031<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time,to s 0.5 0.289 0.049 0.014<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 -0.010 -0.002<br />

Total test force dwell time, t s 1 0.289 -0.106 -0.030<br />

Indenter angle, ° 0.1 0.058 0.180 0.010<br />

Indenter radius, r m 5 2.887 0.058 0.167<br />

Deformati<strong>on</strong> of frame,DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRA Combined uncertainty, uc 0.197<br />

Expanded uncertainty, U e HRA Expanded uncertainty, Ue 0.394<br />

Uncertainty budget of hardness measurement at 35 HRA A32517<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRA 35.3 0.197 1 0.197<br />

Readability,H res HRA 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRA 0 0.041 1 0.041<br />

Combined uncertainty, uc 0.201<br />

Measured hardness,H mh HRA 35.3 Expanded uncertainty, Ue 0.403<br />

Uncertainty budget of <strong>Hardness</strong> machine at 40 HRA A33781<br />

<strong>Hardness</strong> value, HRA 39.1 1528.9 39.1 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force,F o N 0.020 0.011 0.212 0.002<br />

Total test force, F N 0.588 0.340 -0.086 -0.029<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time,to s 0.5 0.289 0.044 0.013<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 -0.009 -0.002<br />

Total test force dwell time, t s 1 0.289 -0.099 -0.029<br />

Indenter angle, ° 0.1 0.058 0.180 0.010<br />

Indenter radius, r m 5 2.887 0.058 0.167<br />

Deformati<strong>on</strong> of frame,DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRA Combined uncertainty, uc 0.196<br />

Expanded uncertainty, U e HRA Expanded uncertainty, Ue 0.393<br />

Uncertainty budget of hardness measurement at 40 HRA A33781<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRA 39.1 0.196 1 0.196<br />

Readability,H res HRA 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRA 0 0.085 1 0.085<br />

Combined uncertainty, uc 0.214<br />

Measured hardness,H mh HRA 39.1 Expanded uncertainty, Ue 0.428<br />

Page 41 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 55 HRA 25568<br />

<strong>Hardness</strong> value, HRA 55.1 3030.9 55.1 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force,F o N 0.020 0.011 0.153 0.002<br />

Total test force, F N 0.588 0.340 -0.064 -0.022<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time,to s 0.5 0.289 0.027 0.008<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 -0.003 -0.001<br />

Total test force dwell time, t s 1 0.289 -0.074 -0.021<br />

Indenter angle, ° 0.1 0.058 0.180 0.010<br />

Indenter radius, r m 5 2.887 0.058 0.167<br />

Deformati<strong>on</strong> of frame,DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRA Combined uncertainty, uc 0.194<br />

Expanded uncertainty, U e HRA Expanded uncertainty, Ue 0.388<br />

Uncertainty budget of hardness measurement at 55 HRA 25568<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRA 55.1 0.194 1 0.194<br />

Readability,H res HRA 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRA 0 0.013 1 0.013<br />

Combined uncertainty, uc 0.195<br />

Measured hardness,H mh HRA 55.1 Expanded uncertainty, Ue 0.389<br />

Uncertainty budget of <strong>Hardness</strong> machine at 60 HRA B12037<br />

<strong>Hardness</strong> value, HRA 60.4 3653.1 60.4 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force,F o N 0.020 0.011 0.133 0.002<br />

Total test force, F N 0.588 0.340 -0.057 -0.019<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time,to s 0.5 0.289 0.021 0.006<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 -0.001 0.000<br />

Total test force dwell time, t s 1 0.289 -0.065 -0.019<br />

Indenter angle, ° 0.1 0.058 0.180 0.010<br />

Indenter radius, r m 5 2.887 0.058 0.167<br />

Deformati<strong>on</strong> of frame,DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRA Combined uncertainty, uc 0.194<br />

Expanded uncertainty, U e HRA Expanded uncertainty, Ue 0.387<br />

Uncertainty budget of hardness measurement at 60 HRA B12037<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRA 60.4 0.194 1 0.194<br />

Readability,H res HRA 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRA 0 0.011 1 0.011<br />

Combined uncertainty, uc 0.194<br />

Measured hardness,H mh HRA 60.4 Expanded uncertainty, Ue 0.388<br />

Page 42 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 70 HRA B15871<br />

<strong>Hardness</strong> value, HRA 70.6 4981.1 70.6 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force,F o N 0.020 0.011 0.095 0.001<br />

Total test force, F N 0.588 0.340 -0.043 -0.015<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time,to s 0.5 0.289 0.010 0.003<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.002 0.000<br />

Total test force dwell time, t s 1 0.289 -0.049 -0.014<br />

Indenter angle, ° 0.1 0.058 0.180 0.010<br />

Indenter radius, r m 5 2.887 0.058 0.167<br />

Deformati<strong>on</strong> of frame,DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRA Combined uncertainty, uc 0.193<br />

Expanded uncertainty, U e HRA Expanded uncertainty, Ue 0.385<br />

Uncertainty budget of hardness measurement at 70 HRA B15871<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRA 70.6 0.193 1 0.193<br />

Readability,H res HRA 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRA 0 0.014 1 0.014<br />

Combined uncertainty, uc 0.193<br />

Measured hardness,H mh HRA 70.6 Expanded uncertainty, Ue 0.386<br />

Uncertainty budget of <strong>Hardness</strong> machine at 80 HRA A27761<br />

<strong>Hardness</strong> value, HRA 81.3 6609.0 81.3 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force,F o N 0.020 0.011 0.055 0.001<br />

Total test force, F N 0.588 0.340 -0.028 -0.010<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time,to s 0.5 0.289 -0.002 -0.001<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.006 0.001<br />

Total test force dwell time, t s 1 0.289 -0.032 -0.009<br />

Indenter angle, ° 0.1 0.058 0.180 0.010<br />

Indenter radius, r m 5 2.887 0.058 0.167<br />

Deformati<strong>on</strong> of frame,DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRA Combined uncertainty, uc 0.192<br />

Expanded uncertainty, U e HRA Expanded uncertainty, Ue 0.384<br />

Uncertainty budget of hardness measurement at 80 HRA A27761<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRA 81.3 0.192 1 0.192<br />

Readability,H res HRA 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRA 0 0.011 1 0.011<br />

Combined uncertainty, uc 0.192<br />

Measured hardness,H mh HRA 81.3 Expanded uncertainty, Ue 0.385<br />

Page 43 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 85 HRA A21048<br />

<strong>Hardness</strong> value, HRA 85.3 7279.9 85.3 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force,F o N 0.020 0.011 0.040 0.000<br />

Total test force, F N 0.588 0.340 -0.023 -0.008<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time,to s 0.5 0.289 -0.006 -0.002<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.007 0.001<br />

Total test force dwell time, t s 1 0.289 -0.025 -0.007<br />

Indenter angle, ° 0.1 0.058 0.180 0.010<br />

Indenter radius, r m 5 2.887 0.058 0.167<br />

Deformati<strong>on</strong> of frame,DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRA Combined uncertainty, uc 0.192<br />

Expanded uncertainty, U e HRA Expanded uncertainty, Ue 0.384<br />

Uncertainty budget of hardness measurement at 85 HRA A21048<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRA 85.3 0.192 1 0.192<br />

Readability,H res HRA 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRA 0 0.027 1 0.027<br />

Combined uncertainty, uc 0.194<br />

Measured hardness,H mh HRA 85.3 Expanded uncertainty, Ue 0.387<br />

Page 44 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 25 HRB 25<br />

<strong>Hardness</strong> value, HRB 24.1 579.4 24.1 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.180 0.002<br />

Total test force, F N 0.981 0.566 -0.117 -0.066<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 -0.069 -0.020<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.007 0.001<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 0.010 0.012<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.116<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.232<br />

Uncertainty budget of hardness measurement at 25 HRB<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 24.1 0.116 1 0.116<br />

Readability,H res HRB 0 0.003 1 0.003<br />

Repeatability of measurement, H rep HRB 0 0.072 1 0.072<br />

Combined uncertainty, uc 0.137<br />

Measured hardness,H mh HRB 24.1 Expanded uncertainty, Ue 0.273<br />

Uncertainty budget of <strong>Hardness</strong> machine at 30 HRB 30<br />

<strong>Hardness</strong> value, HRB 28.5 810.3 28.5 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.170 0.002<br />

Total test force, F N 0.981 0.566 -0.113 -0.064<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 -0.034 -0.010<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.006 0.001<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 0.008 0.009<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.113<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.227<br />

Uncertainty budget of hardness measurement at 30 HRB 30<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 28.5 0.113 1 0.113<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.059 1 0.059<br />

Combined uncertainty, uc 0.128<br />

Measured hardness,H mh HRB 28.5 Expanded uncertainty, Ue 0.257<br />

Page 45 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 40 HRB 40<br />

<strong>Hardness</strong> value, HRB 37.7 1422.4 37.7 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.150 0.002<br />

Total test force, F N 0.981 0.566 -0.104 -0.059<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 0.029 0.008<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.005 0.001<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 0.004 0.004<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.110<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.220<br />

Uncertainty budget of hardness measurement at 40 HRB 40<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 37.7 0.110 1 0.110<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.063 1 0.063<br />

Combined uncertainty, uc 0.128<br />

Measured hardness,H mh HRB 37.7 Expanded uncertainty, Ue 0.255<br />

Uncertainty budget of <strong>Hardness</strong> machine at 50 HRB 50<br />

<strong>Hardness</strong> value, HRB 51.0 2600.2 51.0 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.121 0.001<br />

Total test force, F N 0.981 0.566 -0.092 -0.052<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 0.093 0.027<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.003 0.001<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 -0.003 -0.003<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.110<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.219<br />

Uncertainty budget of hardness measurement at 50 HRB 50<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 51.0 0.110 1 0.110<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.039 1 0.039<br />

Combined uncertainty, uc 0.117<br />

Measured hardness,H mh HRB 51.0 Expanded uncertainty, Ue 0.234<br />

Page 46 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 60 HRB 60<br />

<strong>Hardness</strong> value, HRB 59.6 3549.1 59.6 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.102 0.001<br />

Total test force, F N 0.981 0.566 -0.084 -0.048<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 0.118 0.034<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.002 0.000<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 -0.007 -0.008<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.110<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.220<br />

Uncertainty budget of hardness measurement at 60 HRB 60<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 59.6 0.110 1 0.110<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.110 1 0.110<br />

Combined uncertainty, uc 0.156<br />

Measured hardness,H mh HRB 59.6 Expanded uncertainty, Ue 0.313<br />

Uncertainty budget of <strong>Hardness</strong> machine at 70 HRB 70<br />

<strong>Hardness</strong> value, HRB 69.6 4843.2 69.6 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.080 0.001<br />

Total test force, F N 0.981 0.566 -0.075 -0.042<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 0.130 0.037<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 0.000 0.000<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 -0.012 -0.014<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.109<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.219<br />

Uncertainty budget of hardness measurement at 70 HRB 70<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 69.6 0.109 1 0.109<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.078 1 0.078<br />

Combined uncertainty, uc 0.135<br />

Measured hardness,H mh HRB 69.6 Expanded uncertainty, Ue 0.270<br />

Page 47 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 80 HRB 80<br />

<strong>Hardness</strong> value, HRB 79.6 6329.4 79.6 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.058 0.001<br />

Total test force, F N 0.981 0.566 -0.066 -0.037<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 0.123 0.036<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 -0.001 0.000<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 -0.017 -0.020<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.108<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.215<br />

Uncertainty budget of hardness measurement at 80 HRB 80<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 79.6 0.108 1 0.108<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.176 1 0.176<br />

Combined uncertainty, uc 0.207<br />

Measured hardness,H mh HRB 79.6 Expanded uncertainty, Ue 0.414<br />

Uncertainty budget of <strong>Hardness</strong> machine at 90 HRB 90<br />

<strong>Hardness</strong> value, HRB 90.4 8178.6 90.4 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.034 0.000<br />

Total test force, F N 0.981 0.566 -0.056 -0.032<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 0.096 0.028<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 -0.002 0.000<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 -0.022 -0.026<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.105<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.210<br />

Uncertainty budget of hardness measurement at 90 HRB 90<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 90.4 0.105 1 0.105<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.044 1 0.044<br />

Combined uncertainty, uc 0.115<br />

Measured hardness,H mh HRB 90.4 Expanded uncertainty, Ue 0.229<br />

Page 48 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget of <strong>Hardness</strong> machine at 100 HRB 100<br />

<strong>Hardness</strong> value, HRB 100.0 10008.0 100.0 1<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

error value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

Xi xi u(xi) ci ui(H) Preliminary test force, Fo N 0.020 0.011 0.013 0.000<br />

Total test force, F N 0.981 0.566 -0.047 -0.027<br />

Permanent depth of indentati<strong>on</strong>, h m 0.2 0.115 -0.500 -0.058<br />

Preliminary test force dwell time, to s 0.5 0.289 0.054 0.016<br />

Indentati<strong>on</strong> velocity, v mm/s -1<br />

0.3 0.173 -0.004 -0.001<br />

Total test force dwell time, t s 1 0.289 -0.017 -0.005<br />

Indenter ball diameter, d m 2 1.155 -0.027 -0.031<br />

Deformati<strong>on</strong> of frame, DF m 0.25 0.144 0.500 0.072<br />

Combined uncertainty, u c HRB Combined uncertainty, uc 0.102<br />

Expanded uncertainty, U e HRB Expanded uncertainty, Ue 0.205<br />

Uncertainty budget of hardness measurement at 100 HRB 100<br />

Quantity Unit Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i x i u(x i) c i u i(H)<br />

<strong>Hardness</strong> machine, H phm HRB 100.0 0.102 1 0.102<br />

Readability,H res HRB 0 0.014 1 0.014<br />

Repeatability of measurement, H rep HRB 0 0.027 1 0.027<br />

Combined uncertainty, uc 0.107<br />

Measured hardness,H mh HRB 100.0 Expanded uncertainty, Ue 0.214<br />

Page 49 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Measurement report of KRISS Laboratory<br />

Page 50 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Annex A Data report forms Page1/5<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale A)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine SHT-31<br />

Serial number of hardness primary machine 310037<br />

Manufacturer of hardness primary machine Akashi<br />

<strong>Hardness</strong> indicati<strong>on</strong> system Laser Hologauge<br />

Test force system Lever<br />

Relative error of preliminary test force -0.104%<br />

Relative uncertainty (2) of preliminary test force 0.099%<br />

Relative error of total test force -0.017%<br />

Relative uncertainty (2) of total test force 0.026%<br />

Uncertainty of depth measuring device 0.12 ㎛<br />

Serial number of the indenter 54160<br />

The tip radius of curvature of the indenter 202.3 ㎛<br />

The apex angle of c<strong>on</strong>e of the indenter 119.99°<br />

The calibrati<strong>on</strong> and measurement capability (CMC) 0.4 HRA<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface 25㎛/s ~ 37㎛/s<br />

Holding time of preliminary test force 3.0 sec<br />

Test force loading speed 5.0 sec<br />

Total test force durati<strong>on</strong> time 4.0 sec<br />

Time before reading permanent indentati<strong>on</strong> depth 1.0 sec<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Measurement place KRISS<br />

Measurement date Sep. 30, 2010<br />

Envir<strong>on</strong>ment 23 °C, 43% R.H.<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

Deformati<strong>on</strong> of frame (m)<br />

1 2 3<br />

-0.2 -0.2 -0.2<br />

Page 51 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Data report forms Page 2/5<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale B)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine SHT-31<br />

Serial number of hardness primary machine 310037<br />

Manufacturer of hardness primary machine Akashi<br />

<strong>Hardness</strong> indicati<strong>on</strong> system Laser Hologauge<br />

Test force system Lever<br />

Relative error of preliminary test force 0.166%<br />

Relative uncertainty (2) of preliminary test force 0.126%<br />

Relative error of total test force 0.025%<br />

Relative uncertainty (2) of total test force 0.030%<br />

Uncertainty of depth measuring device 0.12 ㎛<br />

The calibrati<strong>on</strong> and measurement capability (CMC) 0.6 HRBW<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface 25㎛/s ~ 37㎛/s<br />

Holding time of preliminary test force 3.0 sec<br />

Test force loading speed 5.0 sec<br />

Total test force durati<strong>on</strong> time 4.0 sec<br />

Time before reading permanent indentati<strong>on</strong> depth 1.0 sec<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Measurement place KRISS<br />

Measurement date Sep. 30, 2010<br />

Envir<strong>on</strong>ment 23 °C, 43% R.H.<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

Deformati<strong>on</strong> of frame (m)<br />

1 2 3<br />

-0.2 -0.2 -0.2<br />

Page 52 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form2 - Result of the Rockwell hardness scale A measurements (35 - 85 HRA)<br />

Laboratory: KRISS Measured Checked<br />

by: N.H. Tak by: G.W. Bahng<br />

Measured<br />

date: SEP 30 , 2010<br />

Page 3/5<br />

<strong>Hardness</strong> Block Number A32517 A33781 25568<br />

Measured value<br />

B12037 B15871 A27761 A21048<br />

Nominal Value (HRA) 35 40 55 60 70 80 85<br />

Secti<strong>on</strong> 1 36.4 40.0 54.7 60.2 70.7 81.2 85.5<br />

Secti<strong>on</strong> 2 35.4 39.2 54.9 60.2 70.8 81.4 85.5<br />

Secti<strong>on</strong> 3 35.6 39.9 55.0 60.4 70.8 81.4 85.5<br />

Secti<strong>on</strong> 4 35.6 39.3 55.0 60.4 70.7 81.3 85.4<br />

Secti<strong>on</strong> 5 35.4 39.7 54.9 60.3 70.7 81.4 85.5<br />

Secti<strong>on</strong> 6 35.6 39.3 55.0 60.4 70.6 81.4 85.3<br />

Secti<strong>on</strong> 7 35.3 39.3 54.8 60.3 70.8 81.4 85.5<br />

Secti<strong>on</strong> 8 35.4 39.0 54.9 60.3 70.7 81.4 85.4<br />

Secti<strong>on</strong> 9 35.5 39.1 54.9 60.2 70.6 81.4 85.3<br />

Average Value 35.58 39.42 54.90 60.30 70.71 81.36 85.43<br />

Uniformity 1.1 1.0 0.3 0.2 0.2 0.2 0.2<br />

Repeatability 0.12 0.13 0.04 0.03 0.03 0.02 0.03<br />

Correcti<strong>on</strong> Value -0.03 -0.03 -0.03 -0.04 -0.04 -0.04 -0.04<br />

Corrected Value 35.55 39.39 54.87 60.26 70.67 81.32 85.39<br />

Expanded uncertainty (k=2) 0 .46 0.47 0.40 0.40 0.40 0 .40 0.40<br />

Remark: In case of the participant made an incorrect indentati<strong>on</strong> or is unsure about the measurement value, please report to the pilot institute.<br />

Page 53 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form3 - Result of the Rockwell hardness scale B measurements (25-100 HRB )<br />

Laboratory: KRISS Measured Checked Measured<br />

by: N.H. Tak by: G.W. Bahng<br />

Page 4/5<br />

date: SEP 30, 2010<br />

measured value<br />

<strong>Hardness</strong> Block Number E1620 B30120 A31382 A32411 A33748 A34522 A35542 25566 30836<br />

Nominal Value (HRBW) 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong> 1 22.7 29.6 38.7 52.1 59.6 70.5 79.8 90.7 100.0<br />

Secti<strong>on</strong> 2 22.8 29.4 38.7 50.9 59.8 70.0 79.2 90.3 100.2<br />

Secti<strong>on</strong> 3 23.1 29.2 38.4 51.0 59.4 70.0 80.2 90.3 100.1<br />

Secti<strong>on</strong> 4 23.8 29.5 38.6 50.9 59.7 70.0 79.8 90.3 100.1<br />

Secti<strong>on</strong> 5 24.3 29.6 38.8 51.0 59.8 70.3 79.7 90.3 100.2<br />

Secti<strong>on</strong> 6 23.9 29.6 38.4 51.0 59.9 70.9 80.5 90.4 100.1<br />

Secti<strong>on</strong> 7 24.1 29.6 38.8 50.8 60.0 69.9 79.3 90.4 100.1<br />

Secti<strong>on</strong> 8 23.7 29.4 38.4 50.7 60.2 70.0 80.5 90.3 100.1<br />

Secti<strong>on</strong> 9 23.9 29.2 38.5 50.6 59.7 69.9 79.7 90.3 100.0<br />

Average Value 23.59 29.46 38.59 51.00 59.79 70.17 79.86 90.37 100.10<br />

Uniformity 1.6 0.4 0.4 1.5 0.8 1.0 1.3 0.4 0.2<br />

R epeatability 0.21 0.06 0.06 0.16 0.08 0.12 0.17 0.05 0.03<br />

Correcti<strong>on</strong> Value<br />

Corrected Value 23.59 29 .46 38 .59 51.00 59 .79 70.17 79 .86 90.37 100.10<br />

Expanded uncertainty (k=2) 0.75 0.75 0.75 0.75 0.60 0.60 0.60 0.60 0.60<br />

Remark: In case of the participant made an incorrect indentati<strong>on</strong> or is unsure about the measurement value, please report to the pilot institute.<br />

Page 54 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 4 Uncertainty budget of measurement Page 5/5<br />

Uncertainty budget for<br />

35 HRA<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i x i ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.09 N 0.05 0.2272 0.0121<br />

2 Total test force 0.16 N 0.09 -0.09165 -0.0085<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0489 0.0141<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 -0.01015 -0.0352<br />

6 Total test force dwell time 0.5 s 0.29 -0.106 -0.0306<br />

7 indenter angle 0.04 ° 0.02 0.18 0.0042<br />

8 Indenter radius 3.1 ㎛ 1.79 0.058 0.1038<br />

9 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

10<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.24 HRA 0.14 1<br />

0.1386<br />

11 Combined uncertainty(HRA) 0.198<br />

12 Expanded uncertainty(HRA), k=2 0.40<br />

Uncertainty budget for<br />

40 HRA<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.09 N 0.05 0.2086 0.0111<br />

2 Total test force 0.16 N 0.09 -0.0848 -0.0078<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0434 0.0125<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 -0.0084 -0.0291<br />

6 Total test force dwell time 0.5 s 0.29 -0.098 -0.0283<br />

7 indenter angle 0.04 ° 0.02 0.18 0.0042<br />

8 Indenter radius 3.1 ㎛ 1.79 0.058 0.1038<br />

9 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

10<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.24 HRA 0.14 1<br />

0.1386<br />

11 Combined uncertainty(HRA) 0.197<br />

12 Expanded uncertainty(HRA), k=2 0.39<br />

Uncertainty budget for<br />

55 HRA<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.09 N 0.05 0.1528 0.0081<br />

2 Total test force 0.16 N 0.09 -0.06425 -0.0059<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0269 0.0078<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 -0.00315 -0.0109<br />

6 Total test force dwell time 0.5 s 0.29 -0.074 -0.0214<br />

7 indenter angle 0.04 ° 0.02 0.18 0.0042<br />

8 Indenter radius 3.1 ㎛ 1.79 0.058 0.1038<br />

9 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

10<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.24 HRA 0.14 1<br />

0.1386<br />

11 Combined uncertainty(HRA) 0.193<br />

12 Expanded uncertainty(HRA), k=2 0.39<br />

i<br />

i<br />

i<br />

x<br />

3<br />

3<br />

3<br />

Page 55 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for<br />

60 HRA<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.09 N 0.05 0.1342 0.0071<br />

2 Total test force 0.16 N 0.09 -0.0574 -0.0053<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0214 0.0062<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 -0.0014 -0.0048<br />

6 Total test force dwell time 0.5 s 0.29 -0.066 -0.0191<br />

7 indenter angle 0.04 ° 0.02 0.18 0.0042<br />

8 Indenter radius 3.1 ㎛ 1.79 0.058 0.1038<br />

9 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

10<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.23 HRA 0.13 1<br />

0.1328<br />

11 Combined uncertainty(HRA) 0.189<br />

12 Expanded uncertainty(HRA), k=2 0.38<br />

Uncertainty budget for<br />

70 HRA<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.09 N 0.05 0.097 0.0052<br />

2 Total test force 0.16 N 0.09 -0.0437 -0.0040<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0104 0.0030<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.0021 0.0073<br />

6 Total test force dwell time 0.5 s 0.29 -0.05 -0.0144<br />

7 indenter angle 0.04 ° 0.02 0.18 0.0042<br />

8 Indenter radius 3.1 ㎛ 1.79 0.058 0.1038<br />

9 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

10<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.23 HRA 0.13 1<br />

0.1328<br />

11 Combined uncertainty(HRA) 0.188<br />

12 Expanded uncertainty(HRA), k=2 0.38<br />

Uncertainty budget for<br />

80 HRA<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.09 N 0.05 0.0598 0.0032<br />

2 Total test force 0.16 N 0.09 -0.03 -0.0028<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 -0.0006 -0.0002<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.0056 0.0194<br />

6 Total test force dwell time 0.5 s 0.29 -0.034 -0.0098<br />

7 indenter angle 0.04 ° 0.02 0.18 0.0042<br />

8 Indenter radius 3.1 ㎛ 1.79 0.058 0.1038<br />

9 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

10<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.20 HRA 0.12 1<br />

0.1155<br />

11 Combined uncertainty(HRA) 0.177<br />

12 Expanded uncertainty(HRA), k=2 0.35<br />

i<br />

i<br />

i<br />

3<br />

3<br />

3<br />

Page 56 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for<br />

85 HRA<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.09 N 0.05 0.0412 0.0022<br />

2 Total test force 0.16 N 0.09 -0.02315 -0.0021<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 -0.0061 -0.0018<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.00735 0.0255<br />

6 Total test force dwell time 0.5 s 0.29 -0.026 -0.0075<br />

7 indenter angle 0.04 ° 0.02 0.18 0.0042<br />

8 Indenter radius 3.1 ㎛ 1.79 0.058 0.1038<br />

9 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

10<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.20 HRA 0.12 1<br />

0.1155<br />

11 Combined uncertainty(HRA) 0.178<br />

12 Expanded uncertainty(HRA), k=2 0.36<br />

i<br />

3<br />

Page 57 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 4 Uncertainty budget of measurement Page 5/5<br />

Uncertainty budget for<br />

No Quantity<br />

Estimated<br />

valus<br />

xi<br />

25 HRBW<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

xi<br />

X i x i ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.178 0.0103<br />

2 Total test force 0.26 N 0.15 -0.116 -0.0174<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 -0.06165 -0.0178<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.0067 0.0232<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 0.00975 0.0113<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.45 HRBW 0.26 1<br />

0.2598<br />

10 Comdined uncertainty(HRBW) 0.275<br />

11 Expanded uncertainty(HRBW), k=2 0.55<br />

Uncertainty budget for<br />

30 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.167 0.0096<br />

2 Total test force 0.26 N 0.15 -0.1114 -0.0167<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 -0.0224 -0.0065<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.006 0.0208<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 0.0073 0.0084<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.45 HRBW 0.26 1<br />

0.2598<br />

10 Comdined uncertainty(HRBW) 0.274<br />

11 Expanded uncertainty(HRBW), k=2 0.55<br />

Uncertainty budget for<br />

40 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.145 0.0084<br />

2 Total test force 0.26 N 0.15 -0.1022 -0.0153<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0426 0.0123<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.0046 0.0159<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 0.0024 0.0028<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.43 HRBW 0.25 1<br />

0.2483<br />

10 Comdined uncertainty(HRBW) 0.263<br />

11 Expanded uncertainty(HRBW), k=2 0.53<br />

i<br />

i<br />

i<br />

3<br />

3<br />

3<br />

Page 58 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for<br />

50 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.123 0.0071<br />

2 Total test force 0.26 N 0.15 -0.093 -0.0140<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0896 0.0259<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.0032 0.0111<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 -0.0025 -0.0029<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.43 HRBW 0.25 1<br />

0.2483<br />

10 Comdined uncertainty(HRBW) 0.263<br />

11 Expanded uncertainty(HRBW), k=2 0.53<br />

Uncertainty budget for<br />

60 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.101 0.0058<br />

2 Total test force 0.26 N 0.15 -0.0838 -0.0126<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.1186 0.0342<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.0018 0.0062<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 -0.0074 -0.0085<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.35 HRBW 0.20 1<br />

0.2021<br />

10 Comdined uncertainty(HRBW) 0.221<br />

11 Expanded uncertainty(HRBW), k=2 0.44<br />

Uncertainty budget for<br />

70 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.079 0.0046<br />

2 Total test force 0.26 N 0.15 -0.0746 -0.0112<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.1296 0.0374<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 0.0004 0.0014<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 -0.0123 -0.0142<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.35 HRBW 0.20 1<br />

0.2021<br />

10 Comdined uncertainty(HRBW) 0.222<br />

11 Expanded uncertainty(HRBW), k=2 0.44<br />

i<br />

i<br />

i<br />

3<br />

3<br />

3<br />

Page 59 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for<br />

80 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.057 0.0033<br />

2 Total test force 0.26 N 0.15 -0.0654 -0.0098<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.1226 0.0354<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 -0.001 -0.0035<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 -0.0172 -0.0199<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.35 HRBW 0.20 1<br />

0.2021<br />

10 Comdined uncertainty(HRBW) 0.222<br />

11 Expanded uncertainty(HRBW), k=2 0.44<br />

Uncertainty budget for<br />

90 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.035 0.0020<br />

2 Total test force 0.26 N 0.15 -0.0562 -0.0084<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0976 0.0282<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 -0.0024 -0.0083<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 -0.0221 -0.0255<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.34 HRBW 0.20 1<br />

0.1963<br />

10 Comdined uncertainty(HRBW) 0.216<br />

11 Expanded uncertainty(HRBW), k=2 0.43<br />

Uncertainty budget for<br />

100 HRBW<br />

No Quantity<br />

Estimated<br />

valus<br />

Unit<br />

Stadard<br />

uncertatinty<br />

Sensitivity<br />

coefficient<br />

Uncertainty<br />

c<strong>on</strong>tributi<strong>on</strong><br />

X i x i<br />

xi<br />

ux<br />

<br />

C i u i (H )<br />

1 Preliminary test force 0.10 N 0.06 0.013 0.0008<br />

2 Total test force 0.26 N 0.15 -0.047 -0.0071<br />

3 Permanent depth of indentati<strong>on</strong> 0.2 ㎛ 0.12 -0.5 -0.0577<br />

4 Preliminary test force dwell time 0.5 s 0.29 0.0546 0.0158<br />

5 Indentati<strong>on</strong> velocity 6 ㎛/s 3.46 -0.0038 -0.0132<br />

6 Total test force dwell time 0.5 s 0.29 -0.017 -0.0049<br />

7 indenter ball diameter 2.0 ㎛ 1.15 -0.027 -0.0312<br />

8 Deformati<strong>on</strong> of frame 0.2 ㎛ 0.12 0.5 0.0577<br />

9<br />

L<strong>on</strong>g-term stability of primary<br />

hardness testing machine<br />

0.34 HRBW 0.20 1<br />

0.1963<br />

10 Comdined uncertainty(HRBW) 0.216<br />

11 Expanded uncertainty(HRBW), k=2 0.43<br />

i<br />

i<br />

i<br />

3<br />

3<br />

3<br />

Page 60 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Measurement report of NPLI Laboratory<br />

Page 61 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Annex A Data report forms Page1/5<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale A)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine<br />

Serial number of hardness primary machine<br />

Manufacturer of hardness primary machine<br />

<strong>Hardness</strong> indicati<strong>on</strong> system<br />

Test force system<br />

Relative error of preliminary test force<br />

Relative uncertainty (2) of preliminary test force<br />

Relative error of total test force<br />

Relative uncertainty (2) of total test force<br />

Uncertainty of depth measuring device<br />

Serial number of the indenter<br />

The tip radius of curvature of the indenter<br />

The apex angle of c<strong>on</strong>e of the indenter<br />

The calibrati<strong>on</strong> and measurement capability (CMC)<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface<br />

Holding time of preliminary test force<br />

Test force loading speed<br />

Total test force durati<strong>on</strong> time<br />

Time before reading permanent indentati<strong>on</strong> depth<br />

Measurement place<br />

Measurement date<br />

Envir<strong>on</strong>ment<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Deformati<strong>on</strong> of frame (m)<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

HSM HR/HV 2007-07<br />

2007/07<br />

LTF, Italy<br />

Laser Interferometer system<br />

Dead Weight System-Operated by<br />

c<strong>on</strong>trolled speed Servomoter<br />

0.0001<br />

0.0002<br />

0.0001<br />

0.0002<br />

20ppm<br />

4865<br />

197.3 µm<br />

119.96 o<br />

0.3 HRA<br />

0.1mm/s<br />

2s<br />

30µm/s<br />

4s<br />

3s<br />

NPL, New Delhi<br />

25-10-10<br />

Temp. (23±1) o C, Humidity (50±10)%<br />

1 2 3<br />

0.2 0.2 0.2<br />

Page 62 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Data report forms Page 2/5<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale B)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine<br />

Serial number of hardness primary machine<br />

Manufacturer of hardness primary machine<br />

<strong>Hardness</strong> indicati<strong>on</strong> system<br />

Test force system<br />

Relative error of preliminary test force<br />

Relative uncertainty (2) of preliminary test force<br />

Relative error of total test force<br />

Relative uncertainty (2) of total test force<br />

Uncertainty of depth measuring device<br />

The calibrati<strong>on</strong> and measurement capability (CMC)<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

Velocity of the indenter when reaching the surface<br />

Holding time of preliminary test force<br />

Test force loading speed<br />

Total test force durati<strong>on</strong> time<br />

Time before reading permanent indentati<strong>on</strong> depth<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

Measurement place<br />

Measurement date<br />

Envir<strong>on</strong>ment<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

Deformati<strong>on</strong> of frame (m)<br />

HSM HR/HV 2007-07<br />

2007/07<br />

LTF, Italy<br />

Laser Interferometer system<br />

Dead Weight System-Operated by c<strong>on</strong>trolled<br />

speed Servomoter<br />

0.0001<br />

0.0002<br />

0.0001<br />

0.0002<br />

20ppm<br />

0.6 HRBW for nominal not more than 60 HRB<br />

0.5 HRBW for nominal more than 60 HRB<br />

0.1mm/s<br />

2s<br />

30µm/s<br />

4s<br />

3s<br />

NPL, New Delhi<br />

29-10-10<br />

Temp. (23±1) o C, Humidity (50±10)%<br />

1 2 3<br />

0.3 0.3 0.3<br />

Page 63 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form2 - Result of the Rockwell hardness scale A measurements (35 - 85 HRA)<br />

Laboratory: Measured Checked<br />

Nati<strong>on</strong>al Physical Laboratory by: Dr.S.S.K.Titus by: Dr.S.K.Jain<br />

Measured<br />

date: 25-10-2010<br />

Page 3/5<br />

<strong>Hardness</strong> Block Number A32517 A33781 25568<br />

Measured value<br />

B12037 B15871 A27761 A21048<br />

Nominal Value (HRA) 35 40 55 60 70 80 85<br />

Secti<strong>on</strong> 1 35.48 38.49 55.46 60.74 70.66 81.54 85.91<br />

Secti<strong>on</strong> 2 35.47 38.42 55.31 60.77 70.79 81.55 85.94<br />

Secti<strong>on</strong> 3 35.31 39.34 55.14 60.46 70.88 81.57 85.87<br />

Secti<strong>on</strong> 4 35.16 39.26 55.29 60.45 70.88 81.55 85.68<br />

Secti<strong>on</strong> 5 35.12 39.51 55.33 60.53 70.91 81.55 85.80<br />

Secti<strong>on</strong> 6 35.28 39.36 55.19 60.56 70.90 81.56 85.78<br />

Secti<strong>on</strong> 7 35.34 39.41 55.09 60.63 70.80 81.57 85.72<br />

Secti<strong>on</strong> 8 35.20 39.46 54.98 60.55 70.85 81.49 85.67<br />

Secti<strong>on</strong> 9 35.40 39.19 55.13 60.63 70.94 81.68 85.81<br />

Average Value 35.31 39.16 55.21 60.59 70.85 81.56 85.80<br />

Uniformity 0.36 1.09 0.48 0.32 0.28 0.19 0.27<br />

Correcti<strong>on</strong> Value Nil Nil Nil Nil Nil Nil Nil<br />

Corrected Value 35.31 39.16 55.21 60.59 70.85 81.56 85.80<br />

Expanded uncertainty (k=2) 0.31 0.42 0.32 0.31 0.31 0.30 0.31<br />

Remark: In case of the participant made an incorrect indentati<strong>on</strong> or is unsure about the measurement value, please report to the pilot institute.<br />

Page 64 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 3 - Result of the Rockwell hardness scale B measurements ( 25- 100 HRB)<br />

Laboratory: Measured Checked<br />

Nati<strong>on</strong>al Physical Laboratory by: Dr.S.S.K.Titus by: Dr.S.K.Jain<br />

measured value<br />

Measured<br />

date: 29-10-2010<br />

<strong>Hardness</strong> Block Number E1620 B30120 A31382 A 32411 A33748 A28422 A35542 25566 30836<br />

Nominal Value (HRB) 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong> 1 23 . 14 29.67 37.14 51. 41 59.32 69.76 79. 09 90. 12 99.96<br />

Secti<strong>on</strong> 2 23 . 56 29.45 37.38 51. 11 59.13 70.23 78. 89 90. 05 99.87<br />

Secti<strong>on</strong> 3 23 . 59 29.43 36.90 51. 50 59.19 69.97 79. 80 90. 09 100 .08<br />

Secti<strong>on</strong> 4 24 . 21 29.53 37.70 51. 33 58.83 69.64 79. 41 90. 14 99.87<br />

Secti<strong>on</strong> 5 24 . 77 29.74 37.82 51. 49 58.88 69.93 79. 66 90. 03 99.80<br />

Secti<strong>on</strong> 6 24 . 83 29.58 37.67 51. 21 58.71 69.82 79. 85 90. 06 99.84<br />

Secti<strong>on</strong> 7 24 . 70 29.26 37.87 51. 24 59.35 69.73 79. 32 90. 38 99.85<br />

Secti<strong>on</strong> 8 24 . 89 29.47 38.10 51. 23 58.84 69.91 79. 33 90. 16 99.76<br />

Secti<strong>on</strong> 9 24 . 86 29.52 38.24 50. 80 59.28 69.50 78. 85 90. 18 99.76<br />

Average Value 24 . 28 29. 52 37.65 51. 26 59. 06 69.83 79. 36 90. 13 99.87<br />

Uniformity 1.75 0.48 1.34 0.70 0.64 0.73 1.00 0.35 0.32<br />

Correcti<strong>on</strong> Value Nil Nil Nil Nil Nil Nil Nil Nil Nil<br />

Corrected Value 24 . 28 29. 52 37.65 51. 26 59. 06 69.83 79. 36 90. 13 99.87<br />

Expanded uncertainty (k=2) 0 . 70 0.60 0.60 0 . 60 0. 60 0.52 0.56 0. 51 0. 51<br />

Page 4/5<br />

Page 65 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 4 Uncertainty budget of measurement Page 5/5<br />

Uncertainty budget for ___ HRA 35 55<br />

Quantity Estimated<br />

Standard Sensitivity Uncertainty<br />

value<br />

uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i<br />

Primary <strong>Hardness</strong> machine<br />

Dx i<br />

xi<br />

uxi<br />

<br />

3<br />

C i u i (H )<br />

Hphs Res. Of Primary <strong>Hardness</strong><br />

0.3 0.15 0.15 1 0.150<br />

machine Hres 0.01 0.005 0.003 1 0.003<br />

Repeatability of<br />

measurement H rep 0.09 0.045 0.045 1 0.045<br />

Combined uncertainty, u c<br />

Expanded uncertainty, Ue k=2 0.31<br />

0.157<br />

Uncertainty budget for ___ HRA 85 55<br />

Quantity Estimated<br />

Standard Sensitivity Uncertainty<br />

value<br />

uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i Dx i<br />

<br />

<br />

x i<br />

u u<br />

x i <br />

<br />

<br />

<br />

<br />

3 C i u i (H )<br />

Primary <strong>Hardness</strong> machine<br />

Hphs<br />

Res. Of Primary <strong>Hardness</strong><br />

0.3 0.15 0.15 1 0.150<br />

machine Hres Repeatability of<br />

0.01 0.005 0.003 1 0.003<br />

measurement Hrep 0.07 0.035 0.035 1 0.035<br />

Combined uncertainty, u c<br />

0.154<br />

Expanded uncertainty, Ue k=2 0.31<br />

Page 66 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for ___ HRB 25 55<br />

Quantity Estimated<br />

Standard Sensitivity Uncertainty<br />

value<br />

uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i<br />

Primary <strong>Hardness</strong> machine<br />

Dx i<br />

xi<br />

uxi<br />

<br />

3<br />

C i u i (H )<br />

Hphs 0.5 0.25 0.25 1 0.250<br />

Res. Of Primary <strong>Hardness</strong><br />

machine Hres 0.01 0.005 0.003 1 0.003<br />

Repeatability of<br />

measurement Hrep 0.16 0.08 0.08 1 0.080<br />

Combined uncertainty, u c<br />

0.263<br />

Expanded uncertainty, Ue k=2 0.53<br />

Uncertainty budget for ___ HRB 100 55<br />

Quantity Estimated<br />

Standard Sensitivity Uncertainty<br />

value<br />

uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

X i<br />

Primary <strong>Hardness</strong> machine<br />

Dx i<br />

xi<br />

uxi<br />

<br />

3<br />

C i u i (H )<br />

Hphs 0.5 0.25 0.25 1 0.250<br />

Res. Of Primary <strong>Hardness</strong><br />

machine Hres 0.01 0.005 0.003 1 0.003<br />

Repeatability of<br />

measurement Hrep 0.07 0.035 0.035 1 0.035<br />

Combined uncertainty, u c<br />

0.252<br />

Expanded uncertainty, Ue k=2 0.50<br />

Page 67 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty Budget, HRA A32517 A33781 25568 B12037 B15871 A27761 A21048<br />

35 40 55 60 70 80 85<br />

Primary <strong>Hardness</strong> machine H phs 0.15 0.15 0.15 0.15 0.15 0.15 0.15<br />

Res. of Primary <strong>Hardness</strong> machine H res 0.01 0.01 0.01 0.01 0.01 0.01 0.01<br />

Repeatability of measurement H rep 0.05 0.15 0.05 0.04 0.03 0.02 0.03<br />

Calculated_Ue 0.31 0.42 0.32 0.31 0.31 0.30 0.31<br />

CMC 0.30 0.30 0.30 0.30 0.30 0.30 0.30<br />

Expanded uncertainty, Ue 0.31 0.42 0.32 0.31 0.31 0.30 0.31<br />

Uncertainty Budget, HRB E1620 B30120 A31382 A32411 A33748 A28422 A35542 25566 30836<br />

25 30 40 50 60 70 80 90 100<br />

Primary <strong>Hardness</strong> machine H phs 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25<br />

Res. of Primary <strong>Hardness</strong> machine H res 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01<br />

Repeatability of measurement H rep 0.24 0.05 0.16 0.08 0.09 0.07 0.13 0.04 0.04<br />

Calculated_Ue 0.70 0.51 0.59 0.52 0.53 0.52 0.56 0.51 0.51<br />

CMC 0.60 0.60 0.60 0.60 0.60 0.50 0.50 0.50 0.50<br />

Expanded uncertainty, Ue 0.70 0.60 0.60 0.60 0.60 0.52 0.56 0.51 0.51<br />

Page 68 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Measurement report of SCL Laboratory<br />

Page 69 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Data report forms<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 1 (For Rockwell hardness scale B)<br />

Metrology informati<strong>on</strong><br />

Model of hardness primary machine 8150TK (Note 1)<br />

Serial number of hardness primary machine 093925 (Note 1)<br />

Manufacturer of hardness primary machine Indentec (Note 1)<br />

<strong>Hardness</strong> indicati<strong>on</strong> system Length transducer<br />

Test force system Deadweight<br />

Relative error of preliminary test force 0.0 %<br />

Relative uncertainty (2s) of preliminary test force 1.0 %<br />

Relative error of total test force 0.0 %<br />

Relative uncertainty (2s) of total test force 0.1 %<br />

Uncertainty of depth measuring device 3 um<br />

The calibrati<strong>on</strong> and measurement capability (CMC) 1.5 HRBS (Note 2)<br />

Note 1: The machine is not a primary hardness machine, but a commercial hardness machine.<br />

Note 2: This CMC has not been submitted to <str<strong>on</strong>g>APMP</str<strong>on</strong>g> TCM for approval yet.<br />

Velocity of the indenter when reaching the surface NA*<br />

Holding time of preliminary test force 6.4 s<br />

Test force loading speed 88 um/s<br />

Total test force durati<strong>on</strong> time 4.7 s<br />

Time before reading permanent indentati<strong>on</strong> depth NA*<br />

Measurement place SCL H<strong>on</strong>g K<strong>on</strong>g<br />

Measurement date 3 August 2010<br />

Deformati<strong>on</strong> of frame (um)<br />

Testing c<strong>on</strong>diti<strong>on</strong><br />

* SCL hardness machine equips with a n<strong>on</strong>-motorised leadscrew loading system with upward moti<strong>on</strong> driven manually.<br />

Envir<strong>on</strong>ment<br />

Envir<strong>on</strong>ment of comparis<strong>on</strong> measurement<br />

(20 ± 1) o C<br />

(50 ± 8) %RH<br />

(991 ± 3) hPa<br />

Deformati<strong>on</strong> of frame verificati<strong>on</strong><br />

1 2 3<br />

0.7 0.9 0.8<br />

Page 70 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 3 - Result of the Rockwell hardness scale B measurements (25-100 HRB)<br />

Laboratory: Standards and Calibrati<strong>on</strong> Laboratory Measured Checked Measured<br />

by:<br />

by:<br />

date:<br />

K.H.Chan<br />

T.K.Chan<br />

3 Aug 2010<br />

Measured Value<br />

<strong>Hardness</strong> Block Number E1620 B30120 A31382 A32411 A33748 A34522 A35542 25566 30836<br />

Nominal Value (HRB) 25 30 40 50 60 70 80 90 100<br />

Secti<strong>on</strong> 1 26.75 31.30 40.25 53.30 61.95 71.60 81.05 91.55 100.95<br />

Secti<strong>on</strong> 2 26.65 31.45 40.05 53.20 61.60 71.35 80.90 91.55 100.95<br />

Secti<strong>on</strong> 3 27.00 30.95 40.45 52.95 61.60 71.50 81.55 91.40 101.00<br />

Secti<strong>on</strong> 4 26.60 30.70 40.10 52.90 61.15 71.50 80.30 91.45 100.90<br />

Secti<strong>on</strong> 5 25.95 30.50 39.50 52.60 61.15 71.20 80.35 91.50 100.85<br />

Secti<strong>on</strong> 6 26.70 30.15 39.75 52.80 61.35 71.20 81.20 91.50 100.85<br />

Secti<strong>on</strong> 7 25.85 29.05 40.00 53.00 61.75 71.20 80.50 91.50 100.85<br />

Secti<strong>on</strong> 8 26.60 30.75 40.30 53.05 61.90 71.50 80.90 91.60 100.90<br />

Secti<strong>on</strong> 9 25.60 30.70 39.50 53.10 61.30 71.40 80.35 91.45 100.80<br />

Average Value 26.41 30.62 39.99 52.99 61.53 71.38 80.79 91.50 100.89<br />

Uniformity 1.40 2.40 0.95 0.70 0.80 0.40 1.25 0.20 0.20<br />

Correcti<strong>on</strong> Value -0.50 -0.50 -0.50 -0.50 -0.50 -0.50 -0.50 -0.50 -0.50<br />

# Corrected Value (HRBW) 25.91 30.12 39.49 52.49 61.03 70.88 80.29 91.00 100.39<br />

Expanded uncertainty (k=2) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00<br />

Remark: In case of the participant made an incorrect indentati<strong>on</strong> or is unsure about the measurement value, please report to the pilot institute.<br />

# Using 1/16" carbide indenter ball and depth measurement probe.<br />

Page 71 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g> Form 4 Uncertainty budget of measurement<br />

Uncertainty budget for 25 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.178 0.103<br />

Total test force, F 1.0 N 0.58 -0.1160 -0.067<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 -0.0617 -0.018<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 0.0067 0.012<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 0.0098 0.010<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.913<br />

Expanded uncertainty, Ue 1.9<br />

Uncertainty budget for 30 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.167 0.096<br />

Total test force, F 1.0 N 0.58 -0.1114 -0.064<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 -0.0224 -0.006<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 0.0060 0.010<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 0.0073 0.007<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.912<br />

Expanded uncertainty, Ue 1.8<br />

x<br />

3<br />

x<br />

3<br />

Page 72 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for 40 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.145 0.084<br />

Total test force, F 1.0 N 0.58 -0.1022 -0.059<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 0.0426 0.012<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 0.0046 0.008<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 0.0024 0.002<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.910<br />

Expanded uncertainty, Ue 1.8<br />

Uncertainty budget for 50 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.123 0.071<br />

Total test force, F 1.0 N 0.58 -0.0930 -0.054<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 0.0896 0.026<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 0.0032 0.006<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 -0.0025 -0.002<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.909<br />

Expanded uncertainty, Ue 1.8<br />

x<br />

3<br />

x<br />

3<br />

Page 73 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for 60 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.101 0.058<br />

Total test force, F 1.0 N 0.58 -0.0838 -0.048<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 0.1186 0.034<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 0.0018 0.003<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 -0.0074 -0.007<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.908<br />

Expanded uncertainty, Ue 1.8<br />

Uncertainty budget for 70 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.079 0.046<br />

Total test force, F 1.0 N 0.58 -0.0746 -0.043<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 0.1296 0.037<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 0.0004 0.001<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 -0.0123 -0.012<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.907<br />

Expanded uncertainty, Ue 1.8<br />

x<br />

3<br />

x<br />

3<br />

Page 74 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for 80 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.057 0.033<br />

Total test force, F 1.0 N 0.58 -0.0654 -0.038<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 0.1226 0.035<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 -0.0010 -0.002<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 -0.0172 -0.017<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.906<br />

Expanded uncertainty, Ue 1.8<br />

Uncertainty budget for 90 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.035 0.020<br />

Total test force, F 1.0 N 0.58 -0.0562 -0.032<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 0.0976 0.028<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 -0.0024 -0.004<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 -0.0221 -0.022<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.906<br />

Expanded uncertainty, Ue 1.8<br />

x<br />

3<br />

x<br />

3<br />

Page 75 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

Uncertainty budget for 100 HRB 55<br />

Quantity Estimated Standard Sensitivity Uncertainty<br />

value uncertainty coefficient c<strong>on</strong>tributi<strong>on</strong><br />

i<br />

X i Dx u x i <br />

i<br />

C i u i (H )<br />

Preliminary test force, Fo 1.0 N 0.58 0.013 0.008<br />

Total test force, F 1.0 N 0.58 -0.0470 -0.027<br />

Permanent depth of<br />

indentati<strong>on</strong>, h<br />

3.0 um 1.73 -0.5 -0.866<br />

Preliminary test force<br />

0.5 s 0.29 0.0546 0.016<br />

dwell time, t o<br />

Indentati<strong>on</strong> velocity, v 3.0 um/s 1.73 -0.0038 -0.007<br />

Total test force dwell time, t 0.5 s 0.29 -0.017 -0.005<br />

Indenter ball diameter, d 1.7 um 0.98 -0.0270 -0.027<br />

Deformati<strong>on</strong> of frame, DF 0.9 um 0.52 -0.5 -0.260<br />

Combined uncertainty, u c k=2 0.905<br />

Expanded uncertainty, Ue 1.8<br />

x<br />

3<br />

Page 76 of 77


Revisi<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Date: May 25, 2012<br />

12. References<br />

[1] ISO 6508-3: Metallic materials-Rockwell hardness test-Part 3: Calibrati<strong>on</strong> of<br />

reference blocks (scales A, B, C, D, E, F, G, H, K, N, T)<br />

[2] Technical Proposal of <str<strong>on</strong>g>APMP</str<strong>on</strong>g> <str<strong>on</strong>g>Comparis<strong>on</strong></str<strong>on</strong>g> in HRA and HRB, piloted by Nati<strong>on</strong>al<br />

Institute of Metrology (Thailand).<br />

Page 77 of 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!