19.06.2013 Views

OBEN GAS DEVELOPMENT PROJECT

OBEN GAS DEVELOPMENT PROJECT

OBEN GAS DEVELOPMENT PROJECT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter Two Project Justification<br />

Existing Facilities<br />

Agbara<br />

West West African African Gas Gas Pipeline Pipeline Project Project<br />

Figure 2.1: Map of the Western Domestic Gas Network showing Oben Location<br />

2.6.1 Wells/Flowlines<br />

To NEPA Lagos<br />

Agbara/Otta,<br />

& WAGP<br />

Ota<br />

Escravos Lagos<br />

Pipeline System (ELPS)<br />

Lagos Lagos<br />

ELPS<br />

Ikorodu Ajaokuta<br />

Escravos Escravos<br />

Benin<br />

Utorogu<br />

Aba<br />

Bonny Bonny<br />

Port Port Harcourt Harcourt<br />

Abuja Abuja<br />

There are three (3) existing wells and associated flowlines in Oben gas plant (Fig. 2.2). These flowlines<br />

are 6”, class 2500, carbon steel material. The flowlines lengths are as follows:<br />

Well 26 1.0km<br />

Well 27 1.0km<br />

Well 28 0.5km<br />

Oben<br />

Afam<br />

As part of normal flowline replacement strategy, accentuated by integrity from prolonged use without<br />

corrosion inhibition it is proposed to replace the flowlines using identical flowline specifications (6”,<br />

class 2500, carbon steel material). Each of these wells has existing 1” (carbon steel, class 2500)<br />

corrosion inhibitor lines to the wellheads, which will also be replaced.<br />

The proposed new NAG well on the D5 reservoir (Well 29) shall be drilled near the existing Well 28 slot<br />

and will be hooked up using the replaced Well 28 flowline - 0.5km, 6”, class 2500, carbon steel flowline.<br />

2.6.2 Process Flow Scheme for the Existing Oben Gas Plant<br />

Oben gas plant has two (2) LTS Gas Process Modules. Gas from the production header is routed to<br />

either of the LTS modules each rated for 45MMscf/d. Gas entering each module is stripped of entrained<br />

2-3<br />

To Ajaokuta<br />

& proposed<br />

Abuja IPP<br />

SAPELE<br />

Makaraba<br />

(Chevron)<br />

Jones<br />

Creek<br />

Sapele<br />

DELTA<br />

Kokori<br />

Okan<br />

(Chevron)<br />

Mefa<br />

Escravos<br />

Beach Odidi<br />

(Chevron)<br />

Forcados<br />

Warri<br />

Utorogu<br />

Ughelli<br />

UzereEast<br />

LEGEND:<br />

Chevron Line<br />

Existing NGC Lines<br />

SPDC Lines<br />

AgipLine (Eleme Petro. Chemical) Chemical)<br />

NLNG Lines<br />

OGGS<br />

Flowstations<br />

Industrial plant<br />

Power station<br />

AGG facility<br />

NGC compressor<br />

NAG plant<br />

CheveronGP<br />

Connection No Connection

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!