Chapter Two Project Justification<br />

with minimal environmental, social and health impacts shall be utilised in the execution of the proposed<br />

project. The proposed project will also ensure technical and operational integrity of the gas plant for a<br />

minimum of 25 years.<br />

2.3.3 Environmental Sustainability<br />

The Western Domestic Gas/WAGP Supply Project at Oben shall be environmentally sustainable<br />

because of the adoption of SPDC HSE and Environmental Assessment policies. Incorporating the<br />

findings and recommendations of this EIA and subsequent implementation of the Environmental<br />

Management Plan for various project phases will ensure the desired environmental sustainability.<br />

2.3.4 Social Sustainability<br />

The social sustainability of the Western Domestic Gas /WAGP Supply Project at Oben which will<br />

emanate from Stakeholders engagement, include the following: skills acquisition, empowerment,<br />

employment and business opportunities, provision of social infrastructure, etc.<br />

2.4 Project Objective<br />

The Project objectives are as follows:<br />

• To supply quality gas to WAGP by December 2006.<br />

• Generate revenue for the Joint Venture and the nation<br />

• To promote gas utilization and industrial development in the West Africa Sub-region<br />

• Opportunity to upgrade ageing facilities<br />

2.5 Project Alternatives<br />

(PE to complete using information from Concept Selection Report (CSR)<br />

a) Drop Low Temperature Separator (LTS) Pressure below 76 barg and re-compress gas using<br />

Booster compressor<br />

b) Install mechanical refrigeration plant<br />

c) Install new Twister gas processing module<br />

d) Construct new Turbo expander plant<br />

e) Treat gas in Lagos with mechanical refrigeration<br />

f) Run LTS at –20 o c and Rehabilitate the gas process modules<br />

2.6 Project Location<br />

The Oben Field is located some 78 km NE of Warri and situated in OML 4. It shares a common<br />

boundary with PAN OCEAN’s OML 98. The field was discovered in April 1972. The site lies between<br />

Eastings (5 52’ 3.718”E) and Northings (6 0’ 39.296”N) and is bounded by Oben, Iguelaba, Ikobi and<br />

Obozogbe-Nugu communities in Orhionmwon Local Government Area of Edo State. The field comprise<br />

a Flowstation, a Gas Plant and a Nigerian Gas Company (NGC) compressor station.<br />

2-2