I: Summary<br />
Number/ Charge t R183HB Y120<br />
183-H<br />
POSTCLOSURE<br />
TIME LINE COSTS<br />
(SEE ATTACHED FOR DETAIL CALCULATIONS)<br />
1 ERC TEAM WAGE RATES PER, ERC l HMTC DIRECT LABOR WAGE RATES FY 147', DATED Y (BASED ON.' 97 ALL IN WAGE RATES FOR BHI, CH MHILL, IT, TS, HAMTC,<br />
BUILDING TRADES BY RESOURCE CODE-, TRACKING NO NOW)<br />
2 DD AND GAA (BURDEN( IS PER, s BT ALL IN WAGE RATES FOR BHI, QH MHIU- IT, THI, IAMTC. BUILDING TRADES BY RESOURCE CODE', TRACKING NO, NOW). BURDEN IS<br />
EXCLUDED FROM OCEAL DIRECTLY FUNDED WORK ACTIVITIES.<br />
3 ALL WAGE RATES INCLUDE 4% OVERTIME<br />
N MATERIAL SALES TAX. CURRENT RATE 8%, SALES TAX NOT MPLiED TO EQUIPMENT (OWNER OPERATOR). SALES TAX WOULD APPLY IF IT IS RENTAL EQUIPMENT.<br />
5 ALL COSTS ME AT 147 DO-ARS.<br />
4 PRIME SUBCONTRACTM WAGE RATES, PAYROLL ADDS MO FRINGES, PE0.'EUIIDING TRADES FY 147 PRIME SUBCONTRACTOR DIRECT LABOR WAGE RATES' REV. DATE<br />
VI 1/97 (BASED ON HSSA.<br />
PRIME CONTRACTOR MARKUP, PER PRIME CONTRACTOR (SUBCONTRACTOR TO ERIC TEAM) MARKUP TABLE FOR BUILDING TRADES', REV. DATE 11R1R5.<br />
3 PM COST USED THE LATEST DOEAL APPROVED RATES.<br />
4 SOURCES OF INFORMATION ME LISTED AS F0110M.<br />
ITEMS 16 2, HOURS MC COSTS PROVIDED BY FIELD BHI SITE INVESTIGATIONS DEPT.<br />
ITEM 31S BASED UPON ESTIMATOR EXPERIENCE.<br />
ITEM N, HO1RS SUPPLIED BY CHI REGULATORY SUPPORT DEPARTMENT.<br />
ITEM 5, M011RS AND COST PROVIDED BY PNM0. FIELD H DFtOLOGY CHEMISTRY DEPT-<br />
ITEM B IS BASED UPON PROJECT GUIDANCE (ASSUMED SIMILAR TO 340 AREA PROCESS TRENCH POST CLOSURE).<br />
ID SEE THE ESTIMATE PRESENTATION FOR ADDITIO41 INFORMATION ON SCOPE, QUALIFICATIONS t ASSUMPTIONS.<br />