97-EAP-740<br />
Mr. Moses N. Jaraysi<br />
200 Area Unit Supervisor<br />
Nuclear Waste Program<br />
State of Washington<br />
Department of Ecology<br />
1315 West Fourth Avenue<br />
Kennewick, Washington 99336-6018<br />
Dear Mr. Jaraysi<br />
Department of Energy 0048162 9760569<br />
Richland Operations Office<br />
P.O. Box 550<br />
Richland, Washington 99352<br />
OCT 31 1997<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND/OR POSTCLOSURE FOR HANFORD<br />
FACILITY TREATMENT, STORAGE. AND/OR DISPOSAL (TSD) UNITS<br />
Conditions II.H.1. and II.H.2. of the "<strong>Hanford</strong> Facility Resource Conservation<br />
and Recovery Act Permit (HF RCRA Permit)." Dangerous Waste Portion<br />
(DW Portion). require the annual reporting of projections of anticipated costs<br />
for closure and/or postclosure, including postclosure monitoring and<br />
maintenance. for TSD units incorporated into Part III. Part V, or Part VI of<br />
the DW Portion. The Annual Projections of Anticipated Closure and/or<br />
Postclosure Costs submitted with this letter addresses an additional five ISD<br />
units that were incorporated into the HF RCRA Permit. DW Portion. over Fiscal<br />
Year (FY) 1997 (October 1. 1996 through September 30. 1997;. The total number<br />
of TSD units incorporated into the HF RCRA Permit is now 18.<br />
The organization of the Annual Report is<br />
approved at the October 3. 1995. <strong>Hanford</strong><br />
Committee Meeting. and confirmed by a St<br />
Ecology (Ecology) memo dated January 12,<br />
projections of anticipated closure costs<br />
the HF RCRA Permit, DW Portion.<br />
14<br />
Y;.<br />
consistent with the approach that you<br />
Facility RCRA Permit Steering<br />
ate of Washington Department of<br />
1996. This approach reports the<br />
for the TSD units incorporated into<br />
The owner/operator and co-operator certification appears as the last page in<br />
the Annual Report enclosed with this letter. This certification approach is<br />
in accordance with a telephone discussion held with you on October 7. 1996.
Mr. Moses N. Jaraysi<br />
97-EAP-740<br />
Should you have any questions. please contact Ellen M. Mattlin,<br />
U.S. Department of Energy. Richland Operations Office, on (509) 376-<br />
Fred A. Ruck, III. Fluor Daniel <strong>Hanford</strong>. Inc., on (509) 376-9876:<br />
Harold T. Tilden II Pacific Northwest National Laboratory, on (509)<br />
or Roger J. Landon, BHI. on (509) 372-9209.<br />
EAP:EMM<br />
1' ti<br />
Enclosure:<br />
Projections of Anticipated Costs<br />
for Closure and Postclosure<br />
-2<br />
Sin<br />
mes Rasmu . Director<br />
' ^Envir nmental Assurance. Permits.<br />
j' an Policy Division<br />
DOE Richland Operations Office<br />
William D. Adair, Director<br />
Environmental Protection<br />
Responsible Party for<br />
Fluor Daniel <strong>Hanford</strong>. Inc.<br />
pCT 3`1 1997<br />
2385:<br />
Kenneth C. Brog. Director<br />
Environment. Safety, and Health<br />
Pacific Northwest,}atiowl Laboratory<br />
M. C. Hughes.UiCe^President<br />
Operations ^^<br />
Bechtel <strong>Hanford</strong>, Inc.<br />
cc w/encl: cc w/o encl:<br />
D. L. Duncan, EPA W. D. Adair, FDH<br />
S. J. Ingle, CHI R. H. Engelmann. WMH<br />
D. D. Jensen, WMH M. C. Hughes, BHI<br />
R. Jim, YIN L. M. Johnson, BHI<br />
R. J. Landon, BHI S. P. Luttrell. PNNL<br />
D. Powaukee. NPT P. J. Mackey, BHI<br />
S. M. Price, FDH G. W. McNair. PNNL<br />
D. R. Sherwood, EPA F. A. Ruck III. FDH<br />
H. T. Tilden II. PNNL M. T. Yasdick. WMH<br />
J. R. Wilkinson. CTUIR J. A. Winterhalder. WMH<br />
376-0499:
ENCLOSURES<br />
Table 1, Status of Treatment, Storage, and/or Disposal Units<br />
in the <strong>Hanford</strong> Facility Resource Conservation and Recovery Act Permit,<br />
Dangerous Waste Portion, Revision 3A<br />
and<br />
Projections of Anticipated Costs for Closure and/or Postclosure<br />
for Treatment, Storage, and/or Disposal Units included in the<br />
<strong>Hanford</strong> Facility Resource Conservation and Recovery Act Permit,<br />
Dangerous Waste Portion
Table 1: Status of Treatment, Storage, and/or Disposal Units (TSD)<br />
in the <strong>Hanford</strong> Facility Resource Conservation and Recovery Act<br />
(HF RCRA) Permit. Danaerous Waste Portion. Rev. 3A<br />
TSD Unit Name (Managing Previously New Adnini- Clean- Projections of<br />
Subcontractor and/or Provided; Estimate strative Closed . Anticipated<br />
Co-operator Name) Escalation Provided or Other (FY); No Closure and/or<br />
Factor (Combined Costs Estimate Postclosure<br />
Only Category) Remaining Needed Costs Based on<br />
FY 1997 dollars<br />
616 Nonradioactive Dangerous x $1,748,343.00<br />
Waste Storage Facility (WMH<br />
for FDH)<br />
305-8 Storage Facility (Pacific<br />
Northwest)<br />
X $1,770,197.00<br />
PURER storage Tunnels<br />
(B&W for FDH)1<br />
xi 1 $0.00<br />
183-H Solar Evaporation Basins X $2,402,221.00<br />
(BHI)<br />
300 Area solvent Evaporator x $0.00<br />
(FDH)<br />
(1995)<br />
2727-5 Storage facility (FDH) 2 x $0.00<br />
(1995)<br />
Simulated High-Level Waste x $0.00<br />
Slurry Treatment/Storage (1995)<br />
(Pacific Northwest)<br />
218-E-8 Borrow Pit Demolition X $0.00<br />
<strong>Site</strong> (FDH) (1996)<br />
200 West Area Ash Pit x 50.00<br />
Demolition <strong>Site</strong> (FDH) 2 (1996)<br />
2101-M Pond (FDH) 2 x $0.00<br />
(1996)<br />
216-8-3 Expansion Ponds (FDH) 2 X $0.00<br />
(1995)<br />
<strong>Hanford</strong> Patrol Academy 2 X $0.00<br />
Demolition <strong>Site</strong>s (FDH) (1996)<br />
105-DR Large Sodium Fir3 e x3 3 $0.00<br />
Facility (B&W for FOH)<br />
304 Cgncreti on Facility X $0.00<br />
(FDH) (1996)<br />
4843 Alkali Metal Storage x 50.00<br />
Facility (B&W for FDH) (1997)<br />
3718-F Alkali Metal Treatment x $600.00<br />
and Storage Area (S&W for FDH)<br />
303-K Storage Facility (B&W for X $240,771.00<br />
FDH)<br />
300 Area Process Trenches (BHI) % 1<br />
$3,977,704.00<br />
TOTAL I IF—$10,139,836.00<br />
1 For the Plutoni um Uranium Extraction (PURER) Storage Tunnels (Chapter 3, Part III, DW Portion), managed by<br />
e &W <strong>Hanford</strong> Co. (B&W) for co-operator Fluor Daniel <strong>Hanford</strong>, Inc. (FDH), essentially all of the closure costs<br />
remain. As agreed with Ecology, the PUREX Storage Tunnels estimate is deferred until a future date when a<br />
definitive closure strategy is devised. The estimate will be presented in a future annual report when it is<br />
available.<br />
2 These TSD units were clean closed by WHC.<br />
3 For the 105-DR Large Sodium Fire Facility (Chapter 10, Part V, DW Portion), managed by B&W for co-operator<br />
FDH during FY 1997, a portion of the TSD unit is clean closed. For the rest of the unit, essentially all of<br />
the closure costs remain. As agreed with Ecology, the remaining portion will be closed during the<br />
decommissioning and decontamination of the 105-DR Reactor. When costs for decommissioning and<br />
decontamination of this unit becomes available, they will be included in a future annual report.
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND/OR POSTCLOSURE.FOR-TREATMENT,<br />
STORAGE, AND/OR DISPOSAL UNITS INCLUDED IN THE HANFORD FACILITY RESOURCE<br />
CONSERVATION AND RECOVERY ACT PERMIT, DANGEROUS WASTE PORTION<br />
Development Description:<br />
Conditions II.H.1. and II.H.2. of the <strong>Hanford</strong> Facility Resource Conservation<br />
and Recovery Act Permit (HF RCRA Permit), Dangerous Waste Portion (DW<br />
Portion), require the annual reporting of projections of anticipated costs for<br />
closure and/or postclosure, including postclosure monitoring and maintenance,<br />
for treatment, storage, and/or disposal (TSD) units incorporated into Part III<br />
(Unit-Specific Conditions for Operating Units), Part V (Unit-Specific<br />
Conditions for Units Undergoing Closure), or Part VI (Unit-Specific Conditions<br />
for Units in Postclosure) of the HF RCRA Permit, DW Portion.<br />
Certification of the Projections of Anticipated Closure and/or Postclosure<br />
Costs for the TSD Units, in accordance with Condition I.F. of the HF RCRA<br />
Permit, DW Portion, is provided.<br />
A generic interpretative description also is provided with this Projection of<br />
Anticipated Closure and/or Postclosure Costs. A description of the general<br />
basis for the projected costs is presented in the "Closure and/or Postclosure<br />
Activities" section.<br />
For the following discussion, refer to Table 1 of this report.<br />
For ease of reference, the Permittees co-operating a TSD unit with the<br />
U.S. Department of Energy, Richland Operations Office as owner/operator appear<br />
in brackets following the name of the TSD unit for which they had<br />
responsibilities during FY 1997: Bechtel <strong>Hanford</strong>, Inc. (BHI), Fluor Daniel<br />
<strong>Hanford</strong>, Inc. (FDH), or Pacific Northwest National Laboratory (Pacific<br />
Northwest). Any major subcontractor company managing a TSD unit for<br />
co-operator FDH also appears in brackets following the name of the TSD unit<br />
for which they had responsibilities during FY 1997: B&W <strong>Hanford</strong> Co. (B&W), or<br />
Waste Management Federal Services of <strong>Hanford</strong>, Inc. (WMH). Actions performed<br />
by former co-operator and Permittee Westinghouse <strong>Hanford</strong> Company (WHC) are<br />
also indicated where appropriate. Information on each TSD unit can be found<br />
in this report in order of appearance below.<br />
Two "escalation only" projections are included in this report for the TSD<br />
units that have been incorporated into the HF RCRA Permit, DW Portion, for<br />
which the original strategy of pursuing closure has not been changed:<br />
616 Nonradioactive Dangerous Waste Storage Facility (616)<br />
[WMH for FDH]<br />
• 305-B Storage Facility (305-B) [Pacific Northwest].<br />
Complete cost estimates were submitted for these TSD units in the Projection<br />
of Anticipated Costs submitted on October 31, 1994, and October 27, 1995.<br />
These two units currently have no closing date identified, and the current<br />
update uses an escalation factor only.
Three new projections of anticipated costs are included in this report:<br />
• 183-H Solar Evaporation Basins (183-H) [BHI]<br />
• 303-K Storage Facility (303-K) [B&W for FDH]<br />
• 300 Area Process Trenches (300 APT) [BHI].<br />
Postclosure costs have been included for one TSD unit (183-H) which previously<br />
was incorporated into the HF RCRA Permit, DW Portion. The other two TSD units<br />
(303-K and 300 ATP) were incorporated into the HF RCRA Permit, DW Portion,<br />
during Fiscal Year (FY) 1997.<br />
Three projections are included for TSD units that have been incorporated into<br />
the HF RCRA Permit, DW Portion, and which have administrative or other costs<br />
left to accomplish closure:<br />
• Plutonium Uranium Extraction (PUREX) Storage Tunnels (PUREX Tunnels)<br />
[B&W for FDH]<br />
• 105-DR Large Sodium Fire Facility (105-DR) [B&W for FDH]<br />
• 3718-F Alkali Metal Treatment and Storage Area (3718-F) [B&W for FDH].<br />
One of these three TSD units (PUREX Tunnels) has its entire estimate deferred<br />
until a future date when a definitive closure strategy will be devised. The<br />
second of these three TSD units (105-DR) has a portion clean closed in a<br />
previous year, with the rest of its portions tied to the decommissioning and<br />
decontamination of the nearby 105-DR nuclear reactor. The third of these<br />
three TSD units (3718-F) has a small amount of administrative costs remaining.<br />
When costs for the first two of these three TSD units become available, they<br />
will be included in a future annual report.<br />
In addition to the Projection of Anticipated Costs discussed in the previous<br />
paragraphs, the following ten TSD units currently are incorporated into the<br />
HF RCRA Permit and have been accepted in previous years by the Washington<br />
State Department of Ecology (Ecology) as clean closed:<br />
• 300 Area Solvent Evaporator [WHC]<br />
• 2727-S Storage Facility [WHC]<br />
• Simulated High-Level Waste Slurry Treatment and Storage [Pacific Northwest]<br />
• 218-E-8 Borrow Pit Demolition <strong>Site</strong> [WHC]<br />
• 200 West Area Ash Pit Demolition <strong>Site</strong> [WHC]<br />
• 2101-M Pond [WHC]<br />
• 216-8-3 Expansion Ponds [WHC]<br />
• <strong>Hanford</strong> Patrol Academy Demolition <strong>Site</strong>s [WHC]<br />
• 304 Concretion Facility [WHC]<br />
• 4843 Alkali Metal Storage Facility [B&W for FDH].<br />
No further costs are anticipated; therefore, none are presented in this<br />
report. Additionally, if the TSD unit was presented in a previous annual<br />
report with no further costs pending, the page on that individual TSD unit<br />
will no longer be provided in this annual report.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
Closure and/or Postclosure Activities:<br />
The Projections of Anticipated Closure and/or Postclosure Costs are developed<br />
using both <strong>Hanford</strong> Facility and offsite subcontractor expertise and costs.<br />
Where <strong>Hanford</strong> Facility costs were used it was assumed that similar costs would<br />
be incurred if the work was conducted by subcontractors. Projections of the<br />
Anticipated Closure and/or Postclosure Costs take into consideration, where<br />
appropriate, labor and equipment, contractors for excavation, treatment, and<br />
disposal of dangerous waste, TSD unit and equipment decontamination, equipment<br />
removal, sampling and analysis of concrete and soil, inspections and<br />
maintenance, groundwater monitoring, and oversight of all closure and/or<br />
postclosure activities by an independent registered professional engineer.<br />
These projections do not include costs that already have been incurred prior<br />
to September 30, 1997.<br />
Projections of Anticipated Closure and/or Postclosure Costs assume that<br />
workers have received appropriate training in dangerous waste cleanup in<br />
compliance with Occupational Safety and Health Administration Standards<br />
(29 Code of Federal Regulations [CFR] Part 1910.120[e]) and/or job-specific<br />
training for a particular task. Further, it is assumed that outside<br />
consultants (i.e., professional engineers) will possess the demonstrated<br />
experience in closure of TSD units and cleanup of dangerous waste sites.<br />
Cost Basis<br />
Projections of Anticipated Closure and/or Postclosure Costs were developed,<br />
wherever possible, using actual operations, closure, and experience on the<br />
<strong>Hanford</strong> <strong>Site</strong>. These costs were obtained from personal interviews, memoranda,<br />
and financial planning records. Other sources used include the "R.S. Means<br />
Estimating Guide 1995" and the "Kaiser Financial Information of Craft Labor<br />
Rates." No costs for salvage value of equipment nor nondangerous or dangerous<br />
waste have been incorporated into these projections.<br />
Inventory Elimination Costs:<br />
Projections of Anticipated Closure and/or Postclosure Costs for removing,<br />
treating, transporting, and onsite or offsite disposal of remaining inventory,<br />
after waste is no longer accepted at the TSD unit, are based on the maximum<br />
waste inventory for that specific TSD unit.<br />
Updating of Projections of Anticipated Closure and/or Postclosure Costs:<br />
Projections of Anticipated Closure and/or Postclosure Costs are based on<br />
previously submitted cost estimates and the latest revision of the closure<br />
and/or postclosure plans, adjusted for inflation for FY 1997. Projections of<br />
Anticipated Closure and/or Postclosure Costs also will be updated if a change<br />
to the closure and/or postclosure plan increases the cost of closing the unit.<br />
These projections will be updated annually to reflect the current status of<br />
the TSD unit in terms of closure and/or postclosure plan documentation or<br />
actual closure and/or postclosure activities.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
616 NONRADIOACTIVE DANGEROUS WASTE STORAGE FACILITY<br />
The closure strategy/approach has not changed for this TSD unit. The costs<br />
for this TSD unit have been further adjusted by an inflation factor of<br />
2.8 percent for FY 1997 over the inflation factor of 2.8 percent for FY 1996<br />
from the estimate submitted in FY 1995. This factor would not take into<br />
account changes in specific cost elements included in the October 31, 1994,<br />
estimate. The total estimated costs for closure are now $1,748,343.00.<br />
This TSD unit is not scheduled for closure within the next five years.<br />
Complete updated estimates will be included in future reports if the closure<br />
strategy/approach should significantly change, or if a closure date is<br />
established.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
305—B STORAGE FACILITY<br />
The closure strategy/approach has not changed for this TSD unit. The costs<br />
for this TSD unit have been further adjusted by an inflation factor of<br />
2.8 percent for FY 1997 over the inflation factor of 2.8 percent for FY 1996<br />
from the estimate submitted in FY 1995. This factor would not take into<br />
account changes in specific cost elements included in the October 31, 1994,<br />
estimate. The total estimated costs for closure are now $1,770,197.00.<br />
This TSD unit is not scheduled for closure within the next five years.<br />
Complete updated estimates will be included in future reports if the closure<br />
strategy/approach should change significantly or if a closure date is<br />
established.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
PUREX STORAGE TUNNELS<br />
Closure of this TSD unit is expected to occur during decommissioning and<br />
decontamination of the PUREX Plant. The closure strategy for the TSD unit has<br />
not been finalized. When these costs become available, they will be included<br />
in a future annual report.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
183-H SOLAR EVAPORATION BASINS<br />
183-H Solar Evaporation Basins (183-H) postclosure and groundwater monitoring<br />
plans were approved and incorporated into the HF RCRA Permit in FY 1997. The<br />
plans call for a 30-year controlled period during which postclosure activities<br />
will be performed. Beginning in FY 1998, postclosure activities will include<br />
inspections, groundwater monitoring, and well maintenance, as well as<br />
administrative permit compliance activities such as cost estimating and<br />
reporting. Postclosure activities are scheduled to be completed in fiscal<br />
year 2027 and will culminate in postclosure certification. Estimates<br />
incorporate necessary materials, subcontracts, and equipment. Based on<br />
information from site investigations and project expertise, the total cost of<br />
postclosure activities is estimated at $2.4 million (1997 dollars). A<br />
schedule and cost estimate package on the following pages includes a time line<br />
for costs and hours as well as a single year detail of equipment and labor.<br />
The estimate consists of costs for groundwater monitoring, well maintenance<br />
and inspections, and permit compliance activities. Groundwater monitoring<br />
includes quarterly reviews, annual reports, data management, sample and well<br />
measurement collection and analysis, and potential revision of the groundwater<br />
monitoring plan. The well maintenance component includes estimates for well<br />
and surface inspections. Well maintenance is based on a rate of two<br />
maintenance tasks per year and routine maintenance on a rolling five year<br />
cycle. It should be noted that, during the first five years of well<br />
maintenance, a modified groundwater monitoring program has been accepted<br />
because groundwater beneath 183-H is within the hydraulic influence of a pumpand-treat<br />
operation. For the remainder of the estimating period, it is<br />
assumed that the monitoring network originally proposed for the unit will be<br />
re-established. Estimates for permit compliance include preparation, review,<br />
and issuance of applicable reports and plans, and maintenance of the operating<br />
record.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
BECHTEL HANFORD Inc.<br />
Title: Summary<br />
Job Number/ Charge # R183HB Y120<br />
183-H<br />
POST CLOSURE<br />
TIME LINE COSTS<br />
(in 1997 Dollars)<br />
Fik E19odW1'aSTIMAT FU` q gomm`1)n1 CLOSURF R 116ITIME I,INF CASTS<br />
Description FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY<br />
ITEM 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2071 2012 2013 2014<br />
1 INSPECTION OF SURFACE WELL CONDITIONS $ 2981 3 2,981 $ 2981 S 1981 $ 2.981 3 3,842 S 3842 $ 3842 S 3.842 S 3.012 f 3.542 S 3,612 S 3.84 S 3.812 $ 3,842 S ].012 S J,"2<br />
(4 WELLS PER YR FY 98-FY02 AND WELLS PER YR FYO3FY27)<br />
2 GROUNDWATER WELL SUBSURFACE MAINTENANCE<br />
(2 WELLS PER YR FOR FY01, X. 11, 16, 21,16 AND 3 WELLS PER YR<br />
FOR FYN, 02, 05, 57, 10, 12. 15, 17, 20. 22, 25, 27)<br />
3 COST ESTIMATE FOR PORT ,CLOSURE MONITORING 6<br />
MAINTENANCE<br />
4 PERMIT COMPLIANCE<br />
(ADDITIONAL COST IN FY03 FOR CLASS 3 MODIFCATION TO THE<br />
PERMIT TO ADDRESS A FINAL ROD AND REVISED GROUNDWATER<br />
MONITORING PUN (AT PUMP 6 TREAT COMPLETION)<br />
S 10785 E 12,525 S 10,785 3 18.755 $ 12,525 3 18,785 $ 18,785 E 11.525 S 16.755<br />
1 1536 1 1536 1 1536 E 1,536 E 1,536 $ 15M E 1.536 $ 1,536 S 1536 S 1,536 S 1.5M 3 1,536 $ 1,50 $ 1,536 $ 1 536 $ 1538 S 1,538<br />
S 13,727 S 13727 1 13,727 S 13,727 3 13,727 S 27,454 E 13,727 S 13,727 S 13,127 S 13,727 3 13.727 $ 13727 S 13,727 $ 13.727 3 13,727 $ 13,727 S 13.727<br />
3 GROUNDWATER MONITORING<br />
S 24445 S 24445 E 24,445 $ 24445 $ 24.445 S 51, Irk S 51,294 S 54.294 S 54.294 $ 51,294 3 54294 $ 54,294 $ 51,294 $ 54.294 S 51,294 S 8291 $ "291<br />
(4 WELLS PER YEAR FOR FY98,FY02, 4 WELLS PER YR PLUS<br />
GROUNDWATER MONITORING PLAIN REVISIONS FOR FY03 AND 8<br />
WELLS PER YEAR FOR FYN FY27)<br />
-<br />
6 POST CLOSURE CERTIFICATION<br />
TOTAL(in1997 DMMO) S 42689 1 S 42609 S 61471 E 552M S 61
183-H<br />
POSTCLOSURE<br />
TIME LINE COSTS<br />
(in 1997 Dollars)<br />
BECHTEL HANFORD Inc. Date: W14M7<br />
Title: .Summary By: JA LAPIERRE<br />
Job Number/Charge# R183HBY120 Chk'd D. LEONH,wor<br />
I." F. IRcad%k It ESTIMATPJ411 CImme t I OWRE R I N,1TII,IE I IF[ COST Lead Estimator Appv1.: JA LAPIERRE FOR J. CHAPMAN Rev.: 9<br />
Description FY FY FY FY I FY I FY I FY FY I FY FY FY FY FY FY FY TOTAL<br />
ITEM<br />
1 INSPECTION Of SURFACE - CONDITIONS<br />
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029<br />
WELL<br />
(4 WELLS PER YR FY 98-FY02 AND 8 WELLS PER YR FY03 FY27)<br />
$ 3.842 $ 3842 S 3,842 3 3842 $ 3842 $ 3.012 $ 3.0,12 S 3,542 3 3.842 S 3,842 S 3.842 f 3,542 f 3.842 f 110,955<br />
2 GROUNDWATER WELL SUBSURFACE MAINTENANCE<br />
(2 WELLS PER YR FOR FY01, 06, 11, 16, 21, 26 AND 3 WELLS PER YR<br />
FOR FYN. 02.05, 07,10, 12, 15,17, 20, 22, 25, 27)<br />
3 COSTESTIMATE FOR POST -0LOSURE MONITORING B<br />
MAINTENANCE<br />
4 PERMIT COMPLIANCE<br />
(ADDITIONAL COST IN FY03 FOR CUSS 3 MODIFICATION TO THE<br />
PERMIT TO ADDRESS A FINAL ROD AND REVISED GROUNDWATER<br />
MONITORING PLAN (AT PUMP 6 TREAT COMPLETION)<br />
5 GROUNDWATER MONITORING<br />
(4 WELLS PER YEAR FOR FY98-FY02, 4 WELLS PER YR PLUS<br />
GROUNDWATER MONITORING PLAN REVISIONS FOR FY03 AND 8<br />
WELLS PER YEAR FOR FY04-FYI7)<br />
6 POST CLOSURE CERTIFICATION<br />
$ 18.785 3 12525 S 15.785 5 18,785 $ 12,525 S 18785 S 18.785 S 12,525 f 18,785 S 300570<br />
S 1536 S ISM S 1530 $ 1536 $ 1536 1 1536 S 1,536 $ 15M S 1,536 S 1,536 $ 1.536 $ 1,536 S ISM f 40.050<br />
f 13727 3 13,727 $ 13727 $ 13727 3 13727 $ 13,727 S 13,727 $ 13727 3 13,727 S 13,727 f 13,727 $ 13.727 S 13,727 S 425,537<br />
S 54,294 3 54394 3 54294 $ 54294 3 54394 S 54.294 S 54394 S 54294 $ 54294 3 54,294 S 54394 S 5,1194 $ 54,294 3 1476.447<br />
3 42.632 f 42.832<br />
TOTAL rm 1997 D91b.L) 3 92.151 S 85924 $ 92.184 1 f 7]359 $ 73.399 S 92,184 1 S 85.924 1 S 92.184 1 3 73399 S I?399 1 82,104 f 85924 S 121816 S S 1 1402,321<br />
Page 2 of 3<br />
CHECK S 2402,221
I: Summary<br />
Number/ Charge t R183HB Y120<br />
183-H<br />
POSTCLOSURE<br />
TIME LINE COSTS<br />
(SEE ATTACHED FOR DETAIL CALCULATIONS)<br />
1 ERC TEAM WAGE RATES PER, ERC l HMTC DIRECT LABOR WAGE RATES FY 147', DATED Y (BASED ON.' 97 ALL IN WAGE RATES FOR BHI, CH MHILL, IT, TS, HAMTC,<br />
BUILDING TRADES BY RESOURCE CODE-, TRACKING NO NOW)<br />
2 DD AND GAA (BURDEN( IS PER, s BT ALL IN WAGE RATES FOR BHI, QH MHIU- IT, THI, IAMTC. BUILDING TRADES BY RESOURCE CODE', TRACKING NO, NOW). BURDEN IS<br />
EXCLUDED FROM OCEAL DIRECTLY FUNDED WORK ACTIVITIES.<br />
3 ALL WAGE RATES INCLUDE 4% OVERTIME<br />
N MATERIAL SALES TAX. CURRENT RATE 8%, SALES TAX NOT MPLiED TO EQUIPMENT (OWNER OPERATOR). SALES TAX WOULD APPLY IF IT IS RENTAL EQUIPMENT.<br />
5 ALL COSTS ME AT 147 DO-ARS.<br />
4 PRIME SUBCONTRACTM WAGE RATES, PAYROLL ADDS MO FRINGES, PE0.'EUIIDING TRADES FY 147 PRIME SUBCONTRACTOR DIRECT LABOR WAGE RATES' REV. DATE<br />
VI 1/97 (BASED ON HSSA.<br />
PRIME CONTRACTOR MARKUP, PER PRIME CONTRACTOR (SUBCONTRACTOR TO ERIC TEAM) MARKUP TABLE FOR BUILDING TRADES', REV. DATE 11R1R5.<br />
3 PM COST USED THE LATEST DOEAL APPROVED RATES.<br />
4 SOURCES OF INFORMATION ME LISTED AS F0110M.<br />
ITEMS 16 2, HOURS MC COSTS PROVIDED BY FIELD BHI SITE INVESTIGATIONS DEPT.<br />
ITEM 31S BASED UPON ESTIMATOR EXPERIENCE.<br />
ITEM N, HO1RS SUPPLIED BY CHI REGULATORY SUPPORT DEPARTMENT.<br />
ITEM 5, M011RS AND COST PROVIDED BY PNM0. FIELD H DFtOLOGY CHEMISTRY DEPT-<br />
ITEM B IS BASED UPON PROJECT GUIDANCE (ASSUMED SIMILAR TO 340 AREA PROCESS TRENCH POST CLOSURE).<br />
ID SEE THE ESTIMATE PRESENTATION FOR ADDITIO41 INFORMATION ON SCOPE, QUALIFICATIONS t ASSUMPTIONS.<br />
Page 3 of 3
BECHTEL HANFORD Inc.<br />
Title: Summary<br />
Job Number/ Charge A R183HB Y120<br />
183-H<br />
POST CLOSURE<br />
TIME LINE HOURS<br />
(excludes subcontractor hours)<br />
fll[ rNI-TRAINESTIMATE111N 0-11-4 V11(HI S I IRE R), I, If1AIF 1. INE 14011 R{<br />
ITEM<br />
Description FY<br />
1998<br />
FY<br />
1999<br />
FY<br />
2000<br />
FY<br />
2001<br />
FY<br />
2002<br />
FY<br />
2003<br />
FY<br />
2004<br />
FY<br />
2005<br />
FY<br />
2006<br />
FY<br />
2007<br />
FY<br />
2008<br />
FY<br />
1 2009 1<br />
FY<br />
2010 1<br />
FY<br />
2011 1<br />
FY<br />
2012<br />
FY<br />
2013 1<br />
FY<br />
2014<br />
1 INSPECTION OF SURFACE WELL CONDITIONS<br />
(A WELLS PER YR FY 06FY02 M08 WELLS PER YR FYG .FY27I<br />
90 90 90 90 90 10.0 100 100 10.0 100 10.0 100 100 10.0 10.0 10.0 100<br />
2 GROUNDWATER WELL SUBSURFACE MAINTENANCE<br />
(2 WELLS PER YR FOR FY01, IRS 11. 16, 21. M AND 3 WELLS PER YR<br />
FOR FYOU, To. 05, 01. 10. 12, 15. 17, 20, 22. 25, 27)<br />
3 COST ESTIMATE FOR POST{LOSURE MONITORING I<br />
MAINTENANCE<br />
4 PERMIT COMPLIANCE<br />
IAllOIiIONAL COST IN FY03 FOR CLASS 3 MODIFICATION TO THE<br />
PERMIT TO ADDRESS A FINAL ROD AND REVISED GROUNDWATER<br />
MONITORING PLAN (AT PUMP 6 TREAT COMPLETION)<br />
5 GROUNDWATER MONITORING<br />
(4 WELLS PER YEAR FOR FYRS FY02, 4 WELLS PER YR PLUS<br />
GROUNDWATER MONITORING PLAN REVISIONS FOR fY03 AND 8<br />
WELLS PER YEAR FOR FY04.FY27)<br />
6 POST CLOSURE CERTIFICATION<br />
210 140 210 210 u0 210 210 140 210<br />
240 240 240 240 24G 240 240 240 240 240 240 240 240 240 240 210 2A0<br />
2080 2080 2000 2080 20S 4160 2080 2060 2080 2080 2080 2080 2060 2090 2060 2000 2060<br />
17 20 1120 17 20 17 20 1720 3220 2 74 0 2710 2740 2740 27,10 2740 2740 2740 2740 2740 2740<br />
TOTAL 4110 AIJO 4M0 4270 1 4310 0220 5160 5370 530.0 5370 1 5160 5160 537.0 5300 5370 516.0 5160<br />
Page 1 of 2
183-H<br />
POSTCLOSURE<br />
TIME LINE HOURS<br />
(excludes subcontractor hours(<br />
BECHTEL HANFORD Inc. Date: W14797<br />
Title: Summa ry By: JALAPIERRE<br />
Job Number/ Charge # R183HB Y120 Chk'd o. LtoNNAROr<br />
-^k I:\R—IWun4SHMATEIIII1C--II11111'10111R1: NI Mk IIIIUR5 Lead Estimator A VI.. JA LAPIERRE FOR J. CHAPMAN Rev.: 0<br />
Description FY FY FY FY FY FY FY I FY I FY FY FY FY FY FY FY TOTAL<br />
TLM 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029<br />
I INSPECTION OF SURFACE WELL CONDITIONS 100 100 100 100 100 100 10.0 100 100 100 100 To.0 10.0 2950<br />
M WELLS PER YR FY 98 FY02 AND 8 WELLS PER YR FYOlFY27 1<br />
2 GROUNDWATER WELL SUBSURFACE MAINTENANCE<br />
D WELLS PER YR FOR FY01, W. 11, 16. 21, 26 AND J WE LL S PER YR<br />
FOR FY00 02. 05. 0 7 , 10, 12. 15. 17 20. 22, 25,17)<br />
3 COST ESTIMATE FOR POST-CLOSURE MONITORING B<br />
MAINTENANCE<br />
1 PERMIT COMPLIANCE<br />
V,DUITIONAL COST IN FY03 FOR CLASS 3 MODIFICATION TO THE<br />
PERMIT TO ADDRESS A FINAL ROD AND REVISED GROUNDWATER<br />
MONITORING PLAN 1AT PUMP 6 TREAT COMPLETION)<br />
! GROUNOWA]Efl MON1TORING<br />
11 WELLS PER YEAR FOR rY98 , FY 02, 4 WELLS PER YR PLUS<br />
GROUNDWATER MONITORING PLAN REVISIONS FOR F Y03 AND 8<br />
WELLS PER YE AR FOR FYGI7)<br />
6 P08i ClO5URE CERnfICATION<br />
21 0 11 0 21 0 21 0 14 0 21.0 21 0 N 0 21 0 3J6.0<br />
210 210 210 240 250 210 280 210 240 240 210 210 240 720D<br />
2090 2080 2000 2080 2080 2080 2000 2080 2080 2080 2000 208.0 2080 01180<br />
2]10 ZN0 P10 2]10 2710 2710 3710 2710 2710 1]10 2]10 2]10 2740 7.808.0<br />
- -<br />
TOTAL 5])0 900 5370 5180 5190 5370 1 5300 537 0 5160 5160 5370 5300 1 5370 1580]0<br />
Page 2 of 2<br />
CHECK 15,60].0
Oescription<br />
FYW ADDER C<br />
mi -<br />
MEN<br />
®<br />
POST CLOSURE - ONE YEAR E<br />
WE mNIImm<br />
MMEMM INE mIIImmm<br />
MEN<br />
MIN MMM<br />
CERTWCAT^$^C^TRACT IN<br />
lMIIIIIM<br />
POST CLOSURE - ONE YEAR $ Page 2 of 2<br />
MEMO<br />
MEM.<br />
MEMO
218—E-8 BORROW PIT DEMOLITION SITE<br />
This TSD unit was clean closed during FY 1996. There are no anticipated costs<br />
remaining for closure.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
200 WEST AREA ASH PIT DEMOLITION SITE<br />
This TSD unit was clean closed during FY 1996. There are no anticipated costs<br />
remaining for closure.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
2101—M POND<br />
This TSD unit was clean closed during FY 1996. There are no anticipated costs<br />
remaining for closure.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
HANFORD PATROL ACADEMY DEMOLITION SITES<br />
This TSD unit was clean closed during FY 1996. There are no anticipated costs<br />
remaining for closure.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
105-DR LARGE SODIUM FIRE FACILITY ^.<br />
In 1996, Ecology (Letter, M. W. Wilson, Ecology to J. E. Rasmussen,<br />
U.S. Department of Energy, Richland Operations Office, and E. F. Loika,<br />
Westinghouse <strong>Hanford</strong> Company, dated July 16, 1996) accepted clean closure of<br />
Areas 1, 3, and 7 and released these areas from the requirements of Washington<br />
Administrative Code (WAC) 173-303. Also, the letter identified that Area 6,<br />
as defined by Part V, Chapter 10 of the <strong>Hanford</strong> Facility RCRA Permit, DW<br />
Portion, is believed not to have received dangerous waste and is considered<br />
closed for the purposes of WAC 173-303. Areas 2, 4, and 5, as defined by Part<br />
V, Chapter 10 of the HF RCRA Permit, DW Portion, remain regulated. Closure of<br />
these areas is expected to occur during decommissioning and decontamination of<br />
the 105-DR Reactor. Decommissioning and decontamination costs for these areas<br />
have not been formulated. When these costs become available, the costs will<br />
be included in a future annual report.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
304 CONCRETION FACILITY<br />
This TSD unit was clean closed during FY 1996. There are no anticipated costs<br />
remaining for closure.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
4843 ALKALI METAL STORAGE FACILITY<br />
This TSD unit was clean closed during FY 1997. There are no anticipated costs<br />
remaining for closure.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
3718—F ALKALI METAL TREATMENT AND STORAGE AREA -°<br />
The only remaining costs associated with closure for this TSD unit are<br />
administrative costs, supporting the submittal of the closure certifications<br />
and the revised Part A, Form 3 for the unit. The estimated remaining closure<br />
cost is approximately $600.00.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
303-K STORAGE FACILITY<br />
This projection of anticipated closure cost was developed using DOE/RL-90-04,<br />
REV, 2A, "303-K Storage Facility Closure Plan," and the results of the Data<br />
Quality Objectives Process that was conducted in 1997 for this unit.<br />
The cost and schedule information provided is based on input to NNF-SP-1234,<br />
Rev. 0, Facility Stabilization Project Fiscal 1998 Multi-Year Work Plan (MYWP)<br />
for WBS 1.4. This cost and schedule covers the following:<br />
Building preparation for sampling,<br />
Obtaining 18 soil samples form the exterior of the building,<br />
Obtaining three concrete samples from the interior of the building,<br />
Analytical testing of the samples,<br />
Data validation of the analytical testing,<br />
Evaluation of the sample results,<br />
Preparation of a Final Report.<br />
Most of the above work is anticipated to be completed in FY 1998, with only<br />
some administrative costs remaining in FY 1999.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
303-K STORAGE FACILITY CLOSURE COSTS FOR FY'98 _-<br />
ACTIVITY COST ESTIMATED WORK ACTIVITY<br />
BUILDING PREP AND WASTE DISPOSAL $34,866 10-01-97 TO 4-26-98<br />
SAMPLING (18 SOIL SAMPLES AND 24,046 10-20-97 TO 11-30-97<br />
3 CONCRETE SAMPLES)<br />
ANALYTICAL TESTING 75,520 11-01-97 TO 01-15-98<br />
DATA VALIDATION 28,320 01-15-98 TO 04-30-98<br />
PROJECT CO-ORDINATION 46,454 10-01-97 TO 09-30-98<br />
(INCLUDING SAMPLE EVALUATION<br />
AND FINAL REPORT PREPARATION)<br />
PROFESSIONAL ENGINEER 31,565 10-01-97 TO 09-30-98<br />
TOTAL COST $240,771<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT'D)
Labor and Non-Labor Usage Report<br />
by Fiscal Year 97-99-99-2000-2001<br />
Activity<br />
Cost Function<br />
Resource<br />
IK3AD205010A Prepare/Conduct DQO process<br />
Run Date 29Sep97 09:00 Page 1 of 7<br />
------------------------<br />
010tt96 Oloct97 010ct9s 01OCt99<br />
Unit 30Sep97 30Sep98 30$ep99 30Sep00<br />
Labor use 5yrs<br />
E040-19120 - ELECTRICAL ENGINEERS Wn 60 0 0 0<br />
E050-31210 - ENVIRONMENTAL ENGINEERS lin 176 0 0 0<br />
E300-33220 - PLANT ENGINEERS WT 150 0 0 0<br />
5090-31100 - OTHER SCIENTISTS - EXEMPT Wn 33 0 0 0<br />
Labor use 5yrs Total v4, 419 0 0 0<br />
030ct00<br />
3CSep0I Tccal<br />
0 60<br />
C 136<br />
0 150<br />
0 33<br />
Non labor u 5yrs<br />
9300-03E00 - RUST NW LABOR 1,<br />
-<br />
--------------------------- --- ------------- ---_______ C<br />
1"<br />
Non labor u 5yrs Total It - 1,472 0 0 0 0 1, 47,<br />
Total costs 5yrs<br />
9300-03E00 - RUST NW LABOR 5 1,713 0 0 0 0 1,713<br />
E040-19120 - ELECTRICAL ENGINEERS 5 3,:15 0 0 0 0 3,415<br />
E050-31210 - ENVIRONMENTAL ENGINEERS 5 10,734 0 0 0 C 10,734<br />
E100-33220 - PLANT ENGINEERS 5 8,875 0 0 0 0 6,373<br />
5090-31100 - OTHER SCIENTISTS - EXEMPT 5 1,965 0 0 0 0 1,565<br />
Total cos cs 5yrs Total S 26,705 0 0 0 0 26,125<br />
:03 02C601GE Prepare/Issue 303K Sampling plan (S0)<br />
Labor e 5yrs<br />
E04J-19120 - ELECTRICAL ENGINEERS Wn Sc 0 0 0 c-<br />
E050-31210 - ENVIRONMENTAL ENGINEERS Wn 2a4 0 0 " u C84<br />
G040-31210 - SECRETARIES b.T 20 0 0 0 0 2C<br />
------------------------------------------<br />
Labor use 5yrs Total Wp 360<br />
0 0<br />
-------------<br />
0<br />
0<br />
---------- -----"_<br />
C<br />
360<br />
Non labor a 5yrs<br />
6 P00-19120 - MULTIMEDIA SERVICES It 7,000 0 0 0 Coo<br />
Non_labor_u 5yrs Total<br />
----------------------------------------- ---- -------- "-------_-- __-----<br />
I[ 7,000<br />
0 C<br />
0<br />
-, 03t<br />
total costs 5yrs<br />
6PCI-19:20 - MULTIMEDIA SERVICES 5 3,165 0C 0<br />
E24G-15120 - ELECTRICAL ENGINEERS $0 C<br />
E050-31210 - ENVIRONMENTAL ENGINEERS 5 17,2:1 0 C 0<br />
G040-31210 - SECRETARIES 5 -o- „I ,<br />
-------------------------------------------"---"----"<br />
.Deal .osts_Syrs Total 5<br />
:K3A0^GFOi 0 M M/S-O, SAMPLE PLAN SU = ^':?-EJ _aC ].<br />
_abc[ - 5yrs<br />
_<br />
Labor e Sy[s Total<br />
Non labor a 5yrs<br />
.. n- later u 5yrs Total<br />
:c tat cosh 5'/[s<br />
_<br />
. Y3+C'080.uA .ciliate GCs WP, perftrm 0.r. __rvei<br />
Lobo! ua2 5yrs<br />
E100-:5120 - PLANT ENGINEERS 4Ri<br />
.95G-4T3A0 - HEALTH PHYSICS TECHI q CIAN R.i<br />
-----------------------------------"----------------"<br />
---------------------------'<br />
----------------------------------------------------"<br />
Larc:ysa_ 5 yrs Total u.°. --------------------------------------<br />
. "_labor_u_Syrs<br />
No:_labor_u_Syrs Total<br />
------ -----"--<br />
C<br />
---_--"-------<br />
:9,1-2
Labor and Non-Labor Usage Report<br />
by Fiscal Year 97-98-99-2000-2001<br />
Run Date 295--97 09:00 Pace 2 of t<br />
Activity<br />
Cost Function 0100[96 0IOCt97 010.t9e OICCt99 0 1 0Ct00 .--<br />
Resource<br />
Unit 305ep97 305ep98 305ep99 30Sep00 305ep01 Total<br />
-------------------------- -----------------------------------------------------------------------<br />
Total costs 5yrs<br />
EIDO-19120 - PLANT ENGINEERS 5 0 119 0 0 0 119<br />
T050-4T3AD - HEALTH PHYSICS TECHNICIAN 5 0 2,679<br />
0<br />
0 0 2,679<br />
____________ ___________________ ____<br />
Total costs 5yrs Total 5 0 2,799 0 0 0 2,199<br />
lK 3A0208020B WP planning, USQ ove rv iew, RWP, ECN approval<br />
Labor use 5yrs<br />
EIOC-19120 - PLANT ENGINEERS N'l 0 65 0 0 0 i.5<br />
E120-19100 - SAFETY ENGINEER V.n 0<br />
56 0 0<br />
s<br />
a<br />
_________________________________________ _______________ "______ "_"_-____<br />
Labor use 5yrs Total Wh 0 121 0 0 0 ....<br />
Non labor u 5yrs<br />
Non labor u 5yrs Total<br />
Toral costs_5yrs<br />
EIGO-19120 - PLANT ENGINEERS 5 0 3,876 0 0 0 3, 876<br />
E120-19100 - SAFET Y ENGINEER 5 u 3,339 0 0 D<br />
Total costs 5yrs Total 5 0 7,215 0 0 0 7,:.15<br />
IK3A0206020C Pte-Job - WP apr'+1, order ,at':, s,h,d res<br />
Labor use 5yrs<br />
C070-4T360 - PAINTERS Wn 1 0 0 0<br />
C120-4T360 - OTHER CRAFTS W^ - 3 C 0 C ^<br />
KIOG-19120 - PLANT ENGINEERS Wh 10 D C 0 lO<br />
MOIO-52 9 20 - FIRST LINE SUFER'ISCRS W^ !. 0 0 C<br />
P0ID-19120 - PLANNER/SCHEDULER/EST IYATOW" C 6 0 1 0<br />
8050-4T20D - NUCLEAR WASTE FRCCESS CPE0.Wn 0 4 0 0 a 4<br />
]'050 -4T3A0 - HEALTH PHYSICS CS TE 2 F..': u; 1::N Wn _ 0 0 ..<br />
_________________________________________ _______________________________<br />
Labor use 5yrs Total Wn ..<br />
3 3 0 0<br />
.. n laocr u 5yrs<br />
, 1000-19120-- MATERTAL 6 E[L!: ?:!E!:T It 2,000 0 21 0 2,-CD<br />
4000-19120 - P:PR IC _ 1 41 0 C C I40<br />
_________________________________________ _______________________________<br />
Non laSot a 5yrs Tctal It 0<br />
],14'_ 0 -<br />
C<br />
0 _,i4.<br />
Total costs_5yrs<br />
1000-19120 - MATER_'AL EQu:PM E::: G C 0<br />
4000-19120 - MPR 5 0 0 0<br />
0070-44360 - PAINTE PS 5 0 0 0 -<br />
- 30-4T Sd0 - =REF C ':5<br />
_ 20_191°0 - PLA1. E^3::. --<br />
F10 - 30 - FIPS7 LI;. E SV 5 '--<br />
PP_ _ P<br />
_ C -<br />
LAN NGR/5 _ Z._GS- RI 5 E-4:;00 - NUCLEA.R }:5S` 'R.=CE°S r : "'.<br />
TDSC- 47 - .. _r_T^ e.vrsl csT^c._.-_:._^^s<br />
__- 9 C 9 ."-<br />
_<br />
_________________________________________ _______________________________<br />
:o[al_ms[s 5yrs Te'ai 5 C<br />
4 ,3_E 0 0<br />
C 4,"d6<br />
11:3A0_JoJ"_CD ,._-On I l orth e, .c b:c], __.. y p<br />
_a i'Or use 5'j rs<br />
EluO-13120 - PLANT ENGINEERS .. - p 0<br />
R350-4T200 - NUCLEAR WaS71 r ., EE55 G?ERNO.<br />
TO50-4T3AO - HEALTH PHYSICS TECH,N - -IAN KT. f<br />
-<br />
4'<br />
0 n 0<br />
0<br />
__________________ _________"___________________<br />
Labor a -_Syrs Total Wh _ ,-[<br />
u t<br />
0 ._-<br />
!^ n labor u Syrs<br />
Gov lamr u 5yrs Tc:a!<br />
`. o[al costs Syr<br />
-------------------------------------------------------- ________________<br />
E100-19120 - PLANT ENGINEERS S - ,. D 3 1,3 l _-<br />
RC50-4T200 - NUCLEAR WASTE PFDC:, S J?ER5 =,SSE 0 _, 9>c<br />
TJ50 -ST3A0 - HEALTH PHYSICS 5 ., _,_ C ]<br />
J<br />
2, Ei5<br />
__________________________________________ _______"__________- ___.- _______
Labor and Non-Labor Usage Repo rt<br />
by Fiscal Year 97-98-99-2000-2001<br />
---------------------------------<br />
Activity<br />
Cost Function<br />
OlOCt96<br />
Resource Unit 305ep97<br />
-----------------------------------------------------------<br />
Total costs Syrs Total 5 0<br />
1K 3A020P020F Post vrk survey, rev/close WP, Field Log<br />
Labor u e_5yrs<br />
EICO-19120 - PLANT ENGINEERS W-n 0<br />
R050-4T200 - NUCLEAR WASTE PROCESS OPER 0<br />
T050-4T3AO - HEALTH PHYSICS TECHNICIAN FT<br />
0<br />
________ ________<br />
Labor use 5yrs Total cm 0<br />
Ncn_labor_u 5yrs<br />
Non labor u 5yrs Total<br />
_______ _________<br />
Total costs 5yrs<br />
EIOO-19120 - PLANT ENGINEERS 5 0<br />
R050-4T200<br />
T050-4T3AO<br />
- NUCLEAR WASTE PROCESS OPERS<br />
- HEALTH PHYSICS TECHNICIAN $<br />
0<br />
0<br />
________________<br />
'oral costs 5yrs Total 9<br />
1 K3A0205030A 3 concrete core, 1 6 soil - NO asphIt sampl<br />
Labor_use 5yrs<br />
G040-31100 - SECRETARIES WT 0<br />
8040-4T200 - NUCLEAR PLANT OPERATORS FT<br />
5090-31100 - OTHER SCIENTISTS - EiIEMPT %Jh 0<br />
T030-31100 - ENGINEERING TECHNICIAN - NXI 0<br />
T050- MAO - HEALTH PHYSICS TECHNICIAN W? 0<br />
________________<br />
Labor use 5yrs Total PT<br />
Non labor o 5yrs<br />
1000-19120 - HAT ERI P.L 6 EQUIPMENT IL J<br />
4000-19120 - MPR It<br />
5LO0-19120 - ANALYTICAL SER'iiCES IL J<br />
Ncn_lacor a 5yrs Total *_t 0<br />
0<br />
Run Cate 295ep97 09:00<br />
Page 3 of 7<br />
_________________________ ___________ _________ ___________<br />
010Ct97 OlOCt98 01 0ct99 010tt00<br />
30Sep9B 30Sep99 305ep00 305ep01 Total<br />
--------------------------------------------------------<br />
6,541 0 0 0 6,94:<br />
55 0 0 0 55<br />
10 0 0 0 i0<br />
20 0 0 0 20<br />
________________________ ______________________ _________<br />
Total
Labor and Non-Labor Usage Repo rt<br />
by Fiscal Year 97-98-99-2000-2001<br />
Run Dace 295--9 7 09:01<br />
Page 4 of ]<br />
____________________________________________________________________________________________________________________<br />
Activity<br />
Cost Function 01Oct56 010Ct97 010Ct98 OlOCC99 OIOCC00 -<br />
Resou rc e Unit 30Sep97 305ep9S 30Sep99 30Sep00 30Sep01 Total<br />
________________________________________________<br />
Non labor u 5yr3<br />
Non labor u 5yrs Total<br />
To tal - C o st s 5yrs<br />
Total_cosis 5yrs Total<br />
1K3A0208040A Perform onsite n.di-logical analysis<br />
Labor u e 5yrs<br />
Labor u e 5yrs Total<br />
Nor, labor u 5yrs<br />
51,00-19120 - ANALYTICAL SERVICES It 0 4,00(<br />
Non labor u 5yrs Total It 0 4,00(<br />
Total costs 5yrs<br />
SL00-19120 - ANALYTICAL SERVICES 5 0 4,72(<br />
ToCaI —COSCS_SyLs Total 5 0 4,]2(<br />
1K3A0009J408 Perform offsice chemical analysis<br />
Labor use 5yrs<br />
__<br />
Labor use 5yrs Total<br />
0 0 0 4,000<br />
a___________O__________-0<br />
Non labor u 5yrs<br />
5G00-19120- SAMPLE ANALYSIS R<br />
_________________<br />
60,000 0<br />
_______________-<br />
0 0 00,000<br />
4,000<br />
0 0 0 4, 7 20<br />
_____________________________________<br />
0 0 0 4 11 20<br />
Non labor u 5yrs Total a C c .-,)00<br />
0 0 0 60,J - 0<br />
Tcta! costs 5yrs<br />
5GJG-19120 - SAMPLE ANALYSIS 5 0 70 1 800 0 0 0-u,cco<br />
_______________________________________________________________________<br />
Total costs 5yrs Total 5 0 ]0,500 0 0 0 i'C,SCC'<br />
IK3A020E 0 40C M/S-O, %7 C RECEIPT CF L I S ANALYSIS<br />
Labor_u a_5yrs<br />
Labor use 5yrs Total<br />
Scn !abcr u 5yrs<br />
_ _ _<br />
Ncn labor u 5yrs Total<br />
:eta:_ ^scs 5yrs<br />
Toca: torts 5yrs Total<br />
1K I AC20905CA. Validate 303K sam-le aca P/s is<br />
_ao yrs<br />
,.a oor use 5yrs Total<br />
________________________________________________________________________<br />
Ncn Iabo[ u 5yrs<br />
5100-19120 - SAMPLE ANALYSIS It ., 24,100 0 0 0 24,0"0<br />
________________________________________________________________________<br />
Non Jabot u_5yrs Total it 0 2 :,200 0 0 0 24,CC 3<br />
total costs 5yrs<br />
5000-19120 - SAMPLE ANALYSIS 5 C 2 8,320 0 C 0 28,320<br />
: oral costs- 5yrs Total S 0 _E,3-0 C C 0 28,3:.0<br />
!X3A0 2 080508 MIS-0, W C RECEIPT OF SPMPLE S'ALIEA7 IPT^..
Labor and Non-Labor Usage Report<br />
by Fiscal Year 91-98-99-2000-2001<br />
Run Dace 295--97 09:01 Page 5 c:<br />
------------------------------------ _-------------------------------------------------------------------------------<br />
Activity<br />
Cost Function OICci9e 0100297 010ct98 01OCC99 0 1 0Ct00<br />
Resource Unit 30Sap97 30Sep98 30Sep99 305ep00 30Sep01 Total<br />
Labor-use-5yrs<br />
Labor -use - 5yrs Total<br />
Nan labor u 5yrs<br />
Nor. labor u_5yrs Total<br />
,ctal costs 5yrs<br />
Total - costs - 5yrs Total<br />
1K3A020B060A Package waste<br />
______________________ _______________________________<br />
Labor use 5yrs<br />
E100-19120 - PLANT ENGINEERS wn 0 12 0 0 0 12<br />
RO50-4T200 - NUCLEAR WASTE PROCESS OPE RAT 0 32<br />
ry __________ ____________`C___ -_____<br />
0 0 C __<br />
Latcr_use_5yrs Total<br />
0 0 a 44<br />
Ncn labor u 5yrs<br />
_ _ _<br />
Non labor u 5yrs Total<br />
Total costs 5yrs<br />
EIOO-19120 - PLANT ENGINEERS $ 0 716 0 0 0 716<br />
R050-4T200 - NUCLEAR WASTE PRCCESS CPER$ 0 1,573<br />
0 0<br />
0 1,&73<br />
_________________________________________ _______________________________<br />
Total costs 5yrs Total 5 0 2 1 289 0 D 0 2,:69<br />
1K3A020BO 6 0B Ship 303E RCRA closura yerz ratetl wa s[e<br />
bcr _<br />
- ^ - OTHER CP.i FCS - 4:; _ G J 0<br />
.- ENGINEERS _ 0 O 0<br />
-ICD-33220 - PLANT ENGI6 EEFS Kn C i O 0 C<br />
L070-4T330 - LIGHT VEHICLE DRIVES WT 0 a 0 0 0 a<br />
_________________________________________ _______________________________<br />
Labor ose 5yrs 'coal n., 0<br />
80 0 O<br />
Ib . n labor u 5yrs<br />
5400-19120 - RADIO.ACTIVE WASTE D'.SFOSASIt G 966<br />
`=6 ____<br />
0<br />
0<br />
0 0 ._a<br />
___ ______________________________<br />
O<br />
. .n labcr_u 5y rs -,cca1<br />
R 0<br />
.,,<br />
Tc1a1 costs 5yrs<br />
5400-19120 - RADIOA.CTIVE WI S?E DI SPOSA!5 e 0 0 0 1,163<br />
C1-0-4T360 - OTHER CFAFTS G _ "13 0 C 0 ,213<br />
E_CD-1912D - PLANT ENGINE E RS ' 0 147 0 0 0 -<br />
C -33220 - PLANT ENGINEERS<br />
1 1 70-4 -, 330 - LIGHT VEHICLE DRICEFS<br />
5<br />
S e<br />
235 0 0 0<br />
^D_ 0 0 0<br />
______________ ________________________J_____.<br />
-<br />
:_- _ osts_Sy rs Tc[a: $ _ 6,143 0<br />
0<br />
1- N M/S-O, 303K RJR=. G_;: tanSTE SHIPPED<br />
..mr vse ,rs<br />
Lao - e 5yrs Total<br />
Ntn_labor a 5yrs<br />
.v-n labor_u - 5yrs Total<br />
7ctat costs 5yrs<br />
:.tal c s s 5yrs Total<br />
iAdC 2E0'0 a. .repa.e 3 03K Fiea: -port<br />
______________________________<br />
________________ ____________________________ ___ __________..<br />
__ _____________________________ _______________________________<br />
r.
Labor and Non-Labor Usage Report<br />
by Fiscal Year 97-98-99-2000-2001<br />
Run Dace 295--97 09:01<br />
Page 6 -- of 7<br />
______________________________________________________________________________________ ____________________________<br />
Activity<br />
Cost Function O10ct96 010ct9l 010tt 98 030ct99 0 10C CO<br />
Resource<br />
unit 30Sep97 30Sap9E 3OSep99 30SepOO 30SepC1<br />
'c caI<br />
_____________________________________________________________________________________ _________ ______________________<br />
Labor use_5yrs<br />
E040-19120 - ELECTRICAL ENGINEERS Wn 0 40 0 0 0 40<br />
E050-31210 - ENVIRONMENTAL ENGINEERS Nn 0 320 0 0 0 320<br />
G040-31210 - SECRETARIES kT 0 36 0 0 C 16<br />
_________________________________________ _______________________________<br />
Labor_use_5yrs Total Wn 0<br />
376 0 0<br />
0 3n<br />
Non labor a 5yrs<br />
6P00-19120 - MULTIMEDIA SERVICES It 0 5,000 0 0 0 5,000<br />
_________________________________________ _______________________________<br />
lbe labor U 5yrs Total I: D<br />
5,000 O 0<br />
Total costs 5yrs<br />
EPOO-19120 - MULTIMEDIA SERVICES<br />
E040-19120 - ELECTRICAL ENGINEERS<br />
5<br />
5<br />
0<br />
0<br />
5,900<br />
2 1 385<br />
0<br />
0<br />
0<br />
0<br />
0<br />
0<br />
5,900<br />
2,395<br />
E050-31210 - ENVIRONMENTAL ENGINEERS 5 0 18,791 0 0 C :6,79'<br />
G040-31210 - SECRETARIES 5<br />
0<br />
433<br />
0 0 0 433<br />
__<br />
__ ______ __ ______________<br />
_______- _____________ -____<br />
Tocal_costs 5yrs Total 5 0 21,515 0<br />
IK3AO20BO70M MIS-0, FINAL 3036 REPORT SU511 7J u_=-,..,<br />
Labor_use5yrs<br />
Labor_usa_Syrs Total<br />
Non labor a 5yrs<br />
Non_labor_u 5yrs Tccal<br />
'. ocal costs 5yrs<br />
Total costs_5yrs Total<br />
.E3AO2083801 WS-C, WF!C c DOE-P^ CLGS'JE, 1 -2 7 ..-=_ '- CIO':<br />
Latcr_u e_5ycs<br />
Labcr 'J e 5yrs Total<br />
Non_labo _u_5yr5<br />
Ncn labor a jyrs Total<br />
Tccal costs 5yrs<br />
.... - _ r Co tal<br />
_.,_nJ20B0802 M/5-O, PPO FESSIONAL KN51N.-_5<br />
Labcr u e 5yrs<br />
Labcr use 5yrs '...:al<br />
„ labor v 5yrs<br />
.- lair. a Sycs Total<br />
Tc cal_c osts_Syrs<br />
Tctal_ oscs_Syrs Total<br />
163AO2CB08OA 303K RCRA Pro]eat Coorbinacion F'i9l1<br />
Labcr ^ e 51'ts<br />
E 04C-1912C - ELECTRICAL ENGINEEPS Wn<br />
• 5 J-_':Clu - Ell'/IRG:IYrNTA.L ENGINEERS<br />
Laocr u 5yrs Total Wn y3'<br />
Ncn lator a jY[s<br />
_<br />
0<br />
C<br />
C<br />
27,515<br />
____________________________ _______________________________<br />
_________________________________________ _______________________________<br />
_________________________________________ _______________________________<br />
_________________________ _______________________________<br />
------------------------------------------------------ _ --------------- __<br />
------ _----------- - ------<br />
_________________________________________ _______________________________<br />
-
Labor and Non-Labor Usage Report<br />
by Fiscal Year 97-98-99-2000-2001<br />
______________________ _________________<br />
Run Date 29Sep9l 09:01<br />
__________-- _----- _______-_______- _--_--__ __<br />
Page 7 of l<br />
Activity<br />
Cost Function O10.06 OlOCt9l O10008 OlOCt99 OlOCCO0<br />
Resource Unit 30Sep97 30Sep98 30Sep99 30sep0O 30Sep0l TctaI<br />
_____________________________________________________________________________________ _________ ______________________<br />
2100-19120 - PO CONTRACTS<br />
It 3,200 0 0 0 0 3, 2C0<br />
4000-19120 - MPR It 240 0 0<br />
0 0 240<br />
________________________________________________________________________<br />
Ncn labor u 5yrs Total Tt 3,440 0 0 0 0 3,440<br />
Total costs_5yrs<br />
2100-19120 - PO CONTRACTS 5 3,129 0 0 0 0 3,129<br />
4000-19120 - MPR 5 260 0 0 0 0 '90<br />
E040-19120 - ELECTRICAL ENGINEERS $ 20,049 0 0 0 O 2C,C;9<br />
E050-31210 - ENVIRONMENTAL ENGINEERS $ 35,689 O<br />
0 0 0 35,6EE<br />
_________________________________________ _______________________________<br />
Tota] costs 5yrs Total 5 59,745 0 0 0 _., ,,_<br />
IOA020BOSOB 303K RCRA. Project Coordination (FY9E)<br />
Labor use 5yrs<br />
E040-19120 - ELECTRICAL ENGINEEF Wn 0 160 0 0 G<br />
E050-31210 - ENVIRONMENTAL ENGINEERS vn 0 160 0 0 0 .c..<br />
_________________________________________ _______________________________<br />
Labcr use 5yrs Total Fn 0<br />
320 0 _<br />
C --_<br />
Non labor U 5yrs<br />
2100-19120 - PO CONTRACTS It 0 25,030 0 0 0 _ _, GJC<br />
4C00-19120 - MPR I 0 _,750 0 0 0 -----<br />
Non labor_u 5yrs Total It 0 26,750 0 v 0<br />
Total costs 5yrs<br />
2100-19120 - PO CONTRACTS $ J 9,500 2w,'.<br />
4000-19120 - MPR 5 0 2,065 0 0 G 2,065<br />
E040-19120 - ELECTRICAL ENGINEERS 5 0 9,540 0 _ 0 9,540<br />
E050-31210 - ENVIRONMENTAL ENGINEERS 5 0 „ 395 0 0 0 9,355<br />
_________________________________________ _______________________________<br />
Tocal_coscs_5yrs Total 5 0<br />
1K3A020BOSOC 303E RCR4 Project Coordlnatc. (F'i 19991<br />
5C,504 0<br />
LaboC Us2 5yrs<br />
E040-19120 - ELECTRICAL ENv'INEEPS<br />
E050-31210 - ENVIRONMENTAL ENGIN EE ES<br />
Labor<br />
5)'!< Totdl<br />
4A,<br />
+...<br />
C<br />
C<br />
G<br />
0 4c -<br />
__ - r<br />
_-_____ ____c^_________________________<br />
L<br />
.-<br />
_F<br />
__<br />
:lOn 1dbG!_u_SyCe<br />
Non labor u 5yrs Tota.<br />
:Dial costs 5yrs<br />
EI40-19120 - ELECTRICAL ENGINEERS 5<br />
-050-3 12 10 - ENVI RG:+?!ENT 412 ENGINEERS 5 _ . -,c_.<br />
Total Costs 5yrs Total 3
fir- -- -- - - -- ^-1<br />
FY 99 MYWP<br />
300 AREA FUEL SUPPLY SHUTDOWN - 1.4.4.1<br />
Sepl.einher 29, 1997<br />
AC41.14, l^e.erlPNon N11e.IUr1. 51.—, E•M,I.B<br />
bp•<br />
IQ 3 AD200010A P-p.r•/Coonuel DQU p,o ee.. [0/DI /vfi 0 4 /0 3 / 97 I'D D<br />
IQ]A020001OE Pr epv a/bsve ]OSA Ss mpllry pl.n (5U) OA/Or/pi DN/nl/Oi 0] D •L<br />
IE]A020BOION M/S-O, SANPI£ PUN SUOMITTED TO CCOLOGY 0-OtBet oP/OI/ui Ofl/01/vi 0 D 1><br />
I 1,30,0209020A Inlll.le JES lr, Perlo.m .11 •u r.ey 10/01/iT 10/02/G> 2 D<br />
^p<br />
IM 3 A020B020B 114 rl.un,n.. vsQ over, e.. x. r. ECN wrrru . nl iD/ua/Y: Iupm/B> s D ('p<br />
IN]AO20D0 20C Pre-lob - m epr.l. n raer me1'1. .an en r .'. 10/ID/B> 10/14/97 ] D l/LI<br />
I N]AO20 OM D-.. Norm ena b1JA, an..ee r •n ID/Il./% l0/z0/v><br />
lk3A0200020F P..l nrk .a r•y. rr y/elo •• ll', 11.1, 1, n/n/9^ D]/]I/9O Oo D<br />
...A. D0]OA . --.l. vo...ln .ou - n0 ..r011 umrl ID/m/9: 11/O 7/B> D D<br />
,NUo,,000]OB P.,k.A. 9 .plp 1. „O 11 /10/97 II/le/vi 0 D<br />
Ik3A02000]OC M/S-0, CONPIETION OC SUSE SAMPLING 0-Omer 11/14/Yi 11/H/Bi 0 D<br />
IN]A020DOIOA 1'erforrn on sale rxJlulnQIc I ., I .I1.1• 11/1>/Vi 12/02/0 7 10 D ^1 "<br />
I A]AOZOB040 9 Fer(orm off elle clielnleel ens1'.1. 11/1,/4: I2/]0/ 17 27 11<br />
I N]A020D040C M 15-0, 1111 NECEIP1 Of UB ANALl51S .-.II— I2/lU/'l> 12/ 30/47 0 DI I".<br />
N 3A0i000SOA VnMdete SO]N .eln l .ie .n ely.l• WWI, 0;1/10/90 .'.5 0 1<br />
L ;^7<br />
I N]A 02000500 M/S-0, 1111 RECEIPT UC S1MpIE VAIJIIAT Pl.O 0-Omer 0]/14/40 O y, D/90 0 B `r D<br />
I ND A0200M OA p.o k.Ee w.. le 12/]1/4, 01 /20/P0 2 0 D Il<br />
IN]A020B060B SOIP ]0]N RCRA cl osue< E[ner.leJ ..r 1. 01/24/D0 02/11/DO 10 D<br />
IN]A O ZO B 060Y N/S-0. SOSN 0.CRA UN WASTE SHIPPED 0-Omer 02/11/rn 02/li/Pfl 0 Di.<br />
IN 3 A 02 0 DO7OA P...... 3031 1.0.1 report 04/01/90 U.'/]1/BO 04 D I .I<br />
I\JAO20007DM N/5-0, FINAL 0031 .11.D7 SOON TO IMIE-RL U-Um er 07/JI/411 07/]I/DO 0 D<br />
I N 1A.VII.101 M/1-0, .NC A DOE xL C1.05URE CCRilr FCA410N 0-0IO er 09/]1/411 O>/BI/90 0 0 1 lam,//D<br />
MANAGER: Ivan Metcalf<br />
DO, FY97 FY98 P'Y99 FY00 FY01<br />
1 0 D<br />
f /•Il<br />
1<br />
^ 1 9<br />
!<br />
I1^<br />
\. J) Ij<br />
STRIP 1<br />
—j
300 AREA FUG<br />
Sc<br />
Ac 11 elly De, c rlDllon Nlltslone Sle<br />
Ts B•<br />
I E31020BOE02 N/ -0. 1'NOf SSSQNAL E UG CEP CERTIPICATIUN U'!<br />
ISJA020B000A 303A 0.C" Pro)etI Coordln LLlon (GTBT) 10<br />
IA]A02000EOD SOSN NC" Pr ofeel CUO rdln etlon (fY B01 10<br />
INSA020D 0001 2D]K RC" . IBODI 1D<br />
J
300 AREA PROCESS TRENCHES<br />
The 300 Area Process Trenches (300 APT) modified closure/postclosure plan was<br />
approved and incorporated into the HF RCRA Permit in FY 1997. The plan calls<br />
for completion of closure activities in early FY 1998, followed by a 30-year<br />
postclosure period culminating in postclosure certification in FY 2029.<br />
Closure activities include completion of the site remediation work,<br />
groundwater monitoring, well maintenance, and permit compliance. Postclosure<br />
activities consist of site restoration, subsurface well inspections and<br />
maintenance, groundwater monitoring, and permit compliance. Estimates<br />
incorporate necessary subcontracts, materials, and equipment. Based on<br />
information from site investigations and project expertise, the total cost of<br />
closure and/or postclosure activities is estimated at $4.0 million (1997<br />
dollars). A schedule and cost estimate package on the following pages<br />
includes a time line for costs and hours as well as a single year detail of<br />
equipment and labor.<br />
The estimate consists of costs for remediation, groundwater monitoring, well<br />
maintenance and inspections, and permit compliance activities. Remediation to<br />
complete closure includes excavation, backfilling, verification sampling, and<br />
transportation and disposal of waste. The postclosure estimate includes costs<br />
for revegetating the site. Groundwater monitoring includes quarterly reviews,<br />
annual reports, data management, and sample and well measurement collection<br />
and analysis. The well maintenance component consists of estimates for well<br />
and surface inspections of eight wells. It also includes well maintenance<br />
based on a rate of three maintenance tasks per year and routine maintenance on<br />
a rolling five year cycle. Some of the well inspections will require<br />
purgewater containment. Estimates for permit compliance include preparation,<br />
review, and issuance of applicable reports and plans, and maintenance of the<br />
operating record.<br />
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND POSTCLOSURE (CONT-D)
BECHTEL HANFORD Inc.<br />
Title: Summary<br />
Job Number / Charge # R31 FX2 YNAO<br />
300 AREA PROCESS TRENCHES CLOSURE / POST CLOSURE<br />
TIME LINE COSTS<br />
(in 1997 Dollars)<br />
HE, E1ReMW..EUTIMATW9TCImnreg29TCLOSURE R4 dhITl ME LINE COSTS<br />
Descnplion FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY<br />
ITEM<br />
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 1 2014<br />
CLOSURE<br />
1 OFF41M LAB ANALYSIS FOR VERIFICATION<br />
2 PERMITCOMPLIANCE<br />
25% OF A FULL YEAR<br />
3 DATA EVALUATION<br />
4 FIELD MONITORING, SCREENING AND SAMPLING<br />
5 EXCAVATION 6 MATERIAL HANDLING<br />
6 BACRFILL B REGRA (EXCLUDES REVEGETATION)<br />
7 INDEPENDENT VERIFICATION OF CLOSURE<br />
0 GROUNDWATER MONTORING<br />
25% OF EIGHT WELLS SAMPLED SEMIANNUALLY, URANIUM,<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS OF TCE, 12 CIS<br />
DICHLOROETHYLENE. AND VINYL CHLORIDE. IRON. MANGANESE, THALLIUM,<br />
PCB'C,CHRYSENE, BENSO(A)PYRENE. AND FIELD PARAMET ERS(PH.<br />
SPECIFIC CONDUCTANCE. TURBIDITY, AND TEMPERATURE).<br />
9 INSPECTION OF SUBSURFACE WELL CONDITIONS<br />
25% OF A FULL YEAR<br />
10 QUARTERLY SITE INSPECTIONS<br />
25% OF A FULL YEAR<br />
POSTCLOSURE<br />
11 SITE RESTORATION(REVEGETATION)<br />
12 INSPECTION OF SUBSURFACE WELL CONDITIONS<br />
FY98 75%, FY9 27100%, FY28 25%<br />
13 GROUNDWATER WELL MAINTENANCE<br />
5 YEAR CYCLE STARTS IN FY02<br />
14 COST ESTIMATE FOR POST-0LOSURE MONITORING A MAINTENANCE<br />
15 QUARTERLY SITE INSPECTIONS<br />
"9875%, FY"-21 100%. FY28 25%<br />
16 PERMIT COMPLIANCE<br />
FY90 75%, FYW27 100% WITH ADDER IN FY03, 00, 13, %8.23 FOR RE-ASSESS<br />
MODIFIED CLOSURE OPTION, FY28 25%<br />
$ 27]59<br />
$ 3432<br />
1 2.166<br />
1 9,961<br />
1308027<br />
f 24.572<br />
$ 36,050<br />
S 21391<br />
f 1,040<br />
f 066<br />
$ 3,115<br />
5 2049<br />
S 2.5%<br />
S 23,816<br />
S 4152 $ 4,152 1 4,152 S 4.152 $ 4,152 S 4.152 $ 4,152 $ 4,152 $ 4.152 1 4,152 $ 4.152 S 4,152 S 4,152 $ 4,152 S 4.152 3 4,152<br />
S 55,401 $ 55,401 $ 55,401<br />
1 2049 1 2,049 f 2049 S 2.049 3 3.049 3 2049 $ 2049 f 2,049 $ 2049 S 2.049 3 2.049 5 2.049 $ 2049 $ 2049 $ 3,049 S 2.049<br />
S 3,464 5 3464 S ]464 3 3.464 $ 3464 3 3464 3 3464 f 3.464 3 3464 S 3,464 $ 3!64 S 3.464 3 3464 S 3.464 S 304 S 3464<br />
S 102% S 13,727 5 11,727 S 13,727 $ 13727 $ 22,659 1 13727 $ 13, 727 S 13727 1 1.727 S 22,659 f 13.727 S 13,727 $ 1],727 5 13]27 S 22659 3 13.727<br />
17 GROUNDWATER MONITORING<br />
EY2175%OF EIGHT WELLS SAMPLED SEMIANNUALLY, URANIUM,<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS OF TOE, 1.2-CIS-<br />
DICHLOROETHYLENE AND VINYL CHLORIDE, IRON, MANGANESE, THALLIUM,<br />
PCB 'C.CHRYSENE. BENSO(A)PYRENE. AND FIELD PARAMETER S(PH.<br />
SPECIFIC CONDUCTANCE, TURBIDITY, AND TEMPERATURE).<br />
FY99-N TWO WELLS SAMPLED QUARTERLY 6 SIX WELLS SEMIANNUALLY.<br />
$ 63,870 3 04 013 5 84,013 S 84,013 S 84.013 S 04 013 1 04 013 3 04 013 S 84 013 $ 121.321 S 75.761 1 75.761 3 75.761 S 75 761 5 75,751 S 75,761 S 75.761<br />
EYX TWO WELLS SAMPLED QUARTERLY 8 SIX WELLS SEMIANNUALLY PLUS<br />
ONE MOD TO SITEWIDE PERMIT CIRCA.<br />
"08-27 EIGHT WELLS SAMPLED SEMIANNUALLY URANIUM,<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS, AND FIELD<br />
PARAMETERS.<br />
EUS 25% OF EIGHT WELLS SAMPLED SEMIANNUALLY URANIUM,<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS, AND FIELD<br />
PARAMETERS.<br />
0<br />
16 POST-CLOSURE CARE CERTIFICATION<br />
TOTAL (m 1997 DMVO S 522690 1 11221 S 10]405 S 107405 S 151.006 3 fl6,]]7 3 IOU05 5 f0I 405 3 107.405 f 200,114 f 106.005 f 99.15] i 09,15.1 S 99167 3 154554 t 100005 { B9.t9<br />
Page 1 of 3
300 AREA PROCESS TRENCHES CLOSURE/POST CLOSURE<br />
TIME LINE COSTS<br />
(in 1997 Dollars)<br />
BECHTEL HANFORD Inc. Dale: 9mN7<br />
Title: Summary By: JA LAPIERRE<br />
Job Number / Charge # R31 FX2 YNAO Chk'd o LEOHHARDT<br />
hk E:IR.AW.TSTILIATEVY7 CMWM1297 CLOSURE R4x1,ITIME LINE COSTS Lead Estimator Appvl.: JA LAPIERRE FOR J. CHAPMAN Rev.: 4<br />
Description FY FY FY FYFY FY FY FY FY FY FY FY FY FY FY TOTAL<br />
ITEM 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029<br />
CLOSURE 3<br />
1 OFF41TE LAB ANALYSIS FOR VERIFICATION<br />
2 PERMITOOMPl2ANCE<br />
25% OF A FULL YEAR<br />
3 DATA EVALUATION<br />
T FIELD MONITORING, SCREENING AND SAMPLING<br />
5 EXCAVATION 6 MATERIAL HANDLING<br />
F BACNFILL L REGRADING (EXCLUDES REVEGETATION)<br />
1 INDEPENDENT VERIFICATION OF CLOSURE<br />
1 GROUNDWATER MONITORING<br />
25% OF EIGHT WELLS SAMPLED SEMIANNUALLY URANIUM,<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS OF TCE, 11 .CIS-<br />
DICHLOROETHYLENE, AND VINYL CHLORIDE. IRON. MANGANESE, THALLIUM<br />
PCB'C. CHRYSENE. SENSE) IA)PYRENE, AND FIELD PARAMETERS (PH.<br />
SPECIFIC CONDUCTANCE. TURBIDITY, AND TEMPERATURE;<br />
9 INSPECTION OF SUBSURFACE WELL CONDITIONS<br />
25% OF A FULL YEAR<br />
10 QUARTERLY SITE INSPECTIONS<br />
25% OF A FULL YEAR<br />
POSTCLOSURE<br />
II SITE RESTORATION(REVEGETATION)<br />
12 INSPECTION OP SUBSURFACE WELL CONDITIONS<br />
FY96 75%. FY99-27100%. FY28 25%<br />
13 GROUNDWATER WELL MAINTENANCE<br />
5 YEAR CYCLE STARTS IN FY02<br />
14 COST ESTIMATE FOR POST-CLOSURE MONITORING L MAINTENANCE<br />
15 QUARTERLY SITE INSPECTIONS<br />
FY98 75% FY99-27100% FY28 25%<br />
16 PERMIT COMPLIANCE<br />
FY98 75%. FY9937 103% WITH AMER IN FY03 W 13 18 23 FOR PC. ASSESS<br />
MODIFIED CLOSURE OPTION. FY28 25%<br />
17 GROUNDWATER MONITORING<br />
F198 75% OF EIGHT WELLS SAMPLED SEMIANNUALLY. URANIUM<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUC IS OF TCE 12 CIS-<br />
DICHLOROETHYLENE. AND VINYL CHLORIDE. IRON MANGANESE. THALLIUM<br />
PC9'C,CHRYSENE. SENSOIA;PYRENE AND FIELD PARAMETERS IPH<br />
SPECIFIC CONDUCTANCE. TURBIDITY AND TEMPERATURE)<br />
EY99.0'1 PhD WELLS SAMPLED QUARTERLY 8 SIX WELLS SEMIANNUALLY<br />
M TWO WELLS SAMPLED QUARTERLY 8 SIX WELLS SEMIANNUALLY PLUS<br />
ONE MOD TO SITEWIDE PERMIT CIRCA<br />
FLUB 27 EIGHT WELLS SAMPLED SEMIANNUALLY URANIUM<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS AND FIE LD<br />
PARAMETERS<br />
FY30 25% 3F EIGHT V LLS SAMPLED SEMIANNUALLY URANIUM<br />
PE RCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS. AND FIELD<br />
PARAMETERS<br />
IB POST-CLOSURE CARE CERTIFICATION<br />
S 4152 1 4F52 S 4152 S 4152 $ 4152 S 4152 1 5,152 1 4,152 S 4,152 3 4,152 S 4,152 S 4,152 S 4.152 $ IMO<br />
1 2049 1 2049 1 2049<br />
1 34A4 1 3454 1 1464<br />
3 21,759<br />
S 3432<br />
5 7,168<br />
S 9,961<br />
3 308,027<br />
S 24,572<br />
$<br />
W.858<br />
S 21,291<br />
5 1M0<br />
S 866<br />
S<br />
IF -<br />
S 23,816<br />
IT 121,563<br />
1 55401 1 55,401 f 55.401 S 332,406<br />
S 2049 1 2049 1 2049 1 2,049<br />
1 3464 1 3464 1 3464 S 3.464<br />
1 2049<br />
S 3464<br />
1 2M9 $ 1.049 f 2.049 S 2.049 f 2.049<br />
S 1464 1 3.464 $ 3,464 3 3464 3 3 , 464 3 B66<br />
S 81.470<br />
$ 103.918<br />
1 131:% 1 13 R' S 13':' 1 22859 1 13227 1 13727 3 0 27 3 13.727 5 22,659 3 13727 1 13727 3 13727 3 13727 S 3432 S 4%.471<br />
S 75 761 1 75 761 1 15 761 S 75 761 S 75 761 1 75761 S 75 76T 3 75,761 S 75 761 5 75761 S 75,761 5 75,761 3 75,761 S 16.941 $ 2,391,456<br />
S 42,632 $ 42632<br />
TOTAL (In 1997 Ddbrq S 99151 f 99 153 S 154554 11011085 f 99.151 S 99 153 Sl 1 99,15] 3 154.554 3108085 3 99,15] IT 99.15] 3 9915] 3 154554 f 66.911 3 3 3,977704<br />
Page 2 of 3<br />
CHECK S 3.977,704
I: Summa ry<br />
Number I Charge k R31 FX2 YNAO<br />
300 AREA PROCESS TRENCHES CLOSURE I POST CLOSURE<br />
TIME LINE COSTS<br />
(In 1997 Dollars)<br />
=Y FY FY<br />
FY FYI FY FY ^FY I FY FY FY FY T- FY I FY FY FY FY<br />
998 1 1999 1 2000<br />
1 2001 2002 1 2003 1 2004 1 2005 . 1 2006 1 2007 1 2008 1 2009 1 2010 1 2011 1 2012 1 2013 2014<br />
1 ERC TEAM WAGE RATES PER.'ERC 8 HAMM DIRECT LABOR WAGE RATES FY 199T, DATED 85VI6 (BASED ON. PY97 ALL IN WAGE RATES FOR BHI, CH2MHILL, IT, TM, HAM-M.<br />
BUILDING TRADES BY RESOURCE CODE', TRACKING W. (M W W)<br />
2 DD MID GAA (BURDEN IS PER, sY 97 ALL IN WAGE RATES FOR SHI, CIQMHILL. R. THI. HAMM. BUILDNG TRADES BY RESOURCE CODE', TRACKING NO. ( X09W). BURDEN IS<br />
EXCLUDED FROM DOEAL DIRECTLY FUNDED WORX ACTMTIES.<br />
0 ALL WAGE RATES INCLUDE 4% OVERTIME,<br />
R MATERIAL SALES TA CURRENT RATE 5%. SALES TAX NOT MPLLED TO EQUIPMENT (OWNER OPE RATOR). SALES TAX WOULD APPLY IF IT M RE NTAL EQUIPMENT.<br />
5 ALL COSTS ME AT 1997 DOLL ARS.<br />
6 PRIME SUBCONTRACTOR WAGE RATES, PAYROLL ADDS AND FRINGES.PER-BUILDING TRADES FY 1987 PRIME SUBCONTRACTOt DIRECT LABOR WAGE RATES-REV. DATE<br />
VI IM7 (BASED ON HSSA).<br />
7 PRIME CONTRACTOR MARKUP, PER PRIME CONTRACTOR (SUBCONTRACTOR TO ERIC TEAL) MARKUP TABLE FOR BUILDING TRADES%REV. DATE 11R1N6.<br />
S PNNL COST USED THE LATEST DDE-RL APPROVED RA TES.<br />
9 SOURCES OF HOURS AND COST INFORMATION ME LISTED AS FOLLOWS:<br />
U NL ESS OTHERWISE NOTED BELOW ALL INPUT PROVIDED BY THE PROJECT OR ESTIMATING.<br />
GR OU NDWATER WELL INSPECTIONS MID MAINTENANCE PROVIDED BY FIELD Bill SITE INVESTIGATIONS DEPT.<br />
PERMIT COMPLIANCE PROVIDED BY CHI REGULATORY SUPPORT DEFRAYMENT AND THE PROJECT.<br />
GROUNDWATER MONITORING PROMOED BY PN FIELD HYDROLOGY CHEMISTRY DEPT, AND THE PROJECT.<br />
10 SEE THE ESTIMATE PRESE NTATION FOR ADOTI INFORMATION ON SCOPE, OUALIFICATXMNS S ASSUMPTIONS.<br />
Page 3 of 3
BECHTEL HANFORD Inc.<br />
Title: Summary<br />
Job Number I Charge # R31 FX2 YNAO<br />
700 AREA PROCESS TRENCHES CLOSURE I POST CLOSURE<br />
TIME LINE HOURS<br />
foxcludes subcontractor hours)<br />
Ilk F'R,.RV,.AESTIMATE297 C!-.Wj97 CLOSURE RI. h IT IME L IN( I TOURS<br />
Description FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY<br />
ITEM<br />
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014<br />
CLOSURE<br />
I OFF SITE LAB ANALYSIS FOR VERIFICA I ION<br />
2 PERMIT COMPLIANCE<br />
25% OF A FULL YEAR<br />
3 DATA EVALUATION<br />
4 FIELD MONITORING, SCREENING AND SAMPLING<br />
5 EXCAVATION A MATERIAL HANDLING<br />
L BACBFTLL& REGRADING (EXCLUDES REVEGEIATIONI<br />
T INDEPENDENT VERIFICATION OF CLOSURE<br />
8 GROUNDWATER MONITORING<br />
254 OF EIGHT WELLS SAMPLED SEMIANNUALLY, URANIUM,<br />
PERCIILOROETHYLENE AND ITS DEGRADATION PRODUCTS OF TCE. 1.2 CIS<br />
IL()ROF I IIII ENE AND VINYI, CIILORIDF. IRON, MANGANESE, IHALLIUM,<br />
1'1_PC CIIIIYSEIIC RIFV.OR)PYRFNC ANDIIELIIPARAMEILNSUNI,<br />
519 OI IC CONDUCTANCE. UIRDIDIIY. AND TEMPERATURE)<br />
I WSPECTION OF SUBSURFACE WELL CONDITIONS<br />
25% OF A FULL YEAR<br />
10 POST QUARTERLY SITE INSPECTIONS<br />
25%.OF A FULL YEAR<br />
POSTCLOSURE<br />
II SITE RESTORATION(REVEGEIATIONI<br />
12 INSPI IION OF SUBSURFACE WELL CONDITIONS<br />
I YM 75% FY99 . 27 ICJ%, FY28 25%<br />
q GROUNOWATERWELL MAINTENANCE<br />
5 YEAR CYCLE STARTS IN FY02<br />
14 COSTESTIMATE FOR POSTLLOSURE MONITORING A MAINTENANCE<br />
6 POST QUARTERLY SITE INSPECTIONS<br />
FY98 75X, FY".27 N 0% FY26 25%<br />
16 PERMIT COMPLIANCE<br />
FY98 25%. FY99-27 100% W1TH ADDER IN FY03. 08. 13, 18. 23 FOR REASSESS<br />
MODIFIED CLOSURE OPTION, FY28 25%<br />
1, GROUNDWATER MONITORING<br />
FYN 75% OF EIGHT WELLS SAMPLED SEMIANNUALLY. URANIUM.<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS OF TCE 12 CIS<br />
DICHLOROETHYLENE AND VINYL CHLORIDE. IRON, MANGANESE, THALLIUM.<br />
PCB C. CHRYSENE. OENSO X)PYRENE. AND FIELD PARAMETERS (PH,<br />
SPECIFIC CONOU(: LANCE. I URDIDII Y. AND TEMPERATURE)<br />
I Y99 W TWO WILLS SAMPLED QUAD TI PLY M1 .IX WFI LS SEMIANNUALLY.<br />
71011 WD W1 LLS SAMPLED GUAR TLPLY 6 SIX WLLLS SEMIANNUALLY PLUS<br />
ONE MOD TO SITEWIOE PERMIT CIRCA<br />
EY00=2Z EIGHT WELLS SAMPLED SEMIANNUALLY URANIUM.<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS. AND FIELD<br />
PARAMETERS<br />
EY20 25°4 OF EIGHT WELLS SAMPLED SEMIANNUALLY URANIUM,<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS AND FIELD<br />
PARAMETERS.<br />
IB N; POSI-CLOSURE PS<br />
CARE CERTIFICA DON<br />
TOUT<br />
52<br />
100<br />
110<br />
818<br />
134<br />
4<br />
12<br />
11<br />
-<br />
14 IT 14 14 14 14 14 14 14 14 M 14 14 14 14 14<br />
34 34 34<br />
32 32 R 32 32 32 32 32 32 32 32 32 32 32 R 32 32<br />
38 48 IS 48 48 46 48 48 48 48 48 48 48 48 48 40 48<br />
156 208 208 208 208 N4 208 208 208 208 344 208 208 208 208 344 208<br />
402 520 PO 520 570 $70 520 570 570 702 536 538 538 536 Sb 538 S38<br />
1.916 87} 872 872 R08 1 W8 872 872 872 1 038 974 8N 838 838 81} 974 838<br />
Page 1 of 2
300 AREA PROCESS TRENCHES CLOSURE / POST CLOSURE<br />
TIME LINE HOURS<br />
(excludes subcontractor hours)<br />
BECtITEL HANFORD Inc. Dale: 9Q2197<br />
Title: Summary By: JA LAPIERRE<br />
Job Number / Charge # R31 FX2 YNAO Chk'd D LEONHARDT<br />
I." I'RUAMYII%r%UMATF497 rb—e%1297 CI OSLIRE R40,11 IMF I IIIE I IOURS<br />
Description FY FY FY FY FY FY<br />
Lead Estimator AppVl.t JALAPIERRE FOR J. CHAPMAN<br />
FYI FYI FYIFYI FY FY I FY I FY<br />
Rev.,<br />
I FY<br />
4<br />
TOTAL<br />
ITEM<br />
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029<br />
CLOSURE<br />
1 OFF41TE LAB ANALYSIS FOR VERIFICATION<br />
2 PERMIT COMPLIANCE<br />
25% OF A FULL YEAR<br />
2 DATA EVALUATION<br />
I FIELD MONITORING, SCREENING AND SAMPLING<br />
5 EXCAVATION I MATERIAL HANDLING<br />
F BACRFILL I REGRADING (EXCLUDES REVEGETATION)<br />
I INDEPENDENT VERIFICATION OF CLOSURE<br />
GROUNDWATER MONITORING<br />
25%OF EIGHT WELLS SAMPLED SEMIANNUALLY, URANIUM,<br />
PERCHLOROETHYLENE AND ITS DEGRADATION PRODUCTS OF TOE, 1,2.CIS-<br />
DICHLOROETNYLENE AND VINYL CHLORIDE; IRON, MANGANESE, THALLIUM,<br />
PCaC, CHRYSENE BEN501A)PYRENE. AND FIELD PARAMETERS IPH,<br />
SPECIFIC CONDUCTANCE. TURBIDITY. AND TEMPERATURE)<br />
9 INSPECTION OF SUBSURFACE WELL CONDITIONS<br />
25% OF A FULL YEAR<br />
10 POST QUARTERLY SITE INSPECTIONS<br />
251 OF A FULL YEAR<br />
POSr CLOSURE<br />
11 SITE RESTORATION (REVEGETATIONI<br />
12 INSPECTION OF SUBSURFACE WELL COND17IONS<br />
FY98 75%, FY99 27 1005.. FY20 25%<br />
O GROUNDWATER WELL MAINTENANCE<br />
5 YEAR CYCLE STARTS IN FY02<br />
14 COST ESTIMATE FOR POSTLLOSURE MONITORING a MAINTENANCE<br />
15 POST QUARTERLY SITE INSPECTIONS<br />
IV98IYA FY9927 IFKI. I Y2025%<br />
- II: - PERM—HCOM—PLIANCE<br />
I YOB 75%. FY".7I 1(q% W1111 ADDER IN F Y03. 08, 13. 18. 73 FOR REASSESS<br />
MODIFIED CLOSURE OPTION, I Y28 25Y.<br />
11 GROUNDWATER MONITORING<br />
EY99 75% OF EIGHT WELLS SAMPLED SEMIANNUALLY, URANIUM',<br />
PERCHLOROETHYLENE ABU ITS OEGRADAT40N PRODUCTS OF TCE. 1.2 CIS<br />
DICHLOROETHYLENE. AND "NYE CHLORIDE, IRON, MANGANESE, THALLIUM.<br />
PCOC, CHRYSENE, BENSO(A)PYRENE ANO FIELD PARAMETERS (PH,<br />
SPECIFIC CONDUCTANCE. TURBIDITY. AND TEMPERATURE(<br />
FY99 W TWO WELLS SAMPLED QUARTERLY 6 SIX WELLS SEMIANNUALLY.<br />
1 Y07 TVA AULLS SAMPLED QUARTERLY 8 SIX W£LL5 SEMIANNUALLY PLUS<br />
ONF MOO TO .H E WIDE rrRM1T CIRCA<br />
FY0827 EIGHT WELLS SAMPL ED SEMIANNUALLY URANIUM.<br />
PE RCI TLOROE THYL F HE AND I I S DEGRADATION PRODUC I S, AND FIELD<br />
PARAMETERS<br />
F Y20 25% OF EIGHT WE I S SAIAI'L E SEMIANNUALLY URANIUM,<br />
PE RCHLOROE I HYLE N E AND I I S OF GRADAT ION PRODUCTS. AND FIELD<br />
PARAMETERS.<br />
18 POST-CLOSURE CARE CERTIFICATION<br />
N u N M 14 14 14 14 14 M 14 14 N I 420<br />
34 34 34 201<br />
32 32 32 32 32 32 32 32 32 12 32 32 32 980<br />
40 0 48 48 48 48 48 40 46 46 48 40 48 12 1.440<br />
200 208 208 344 200 208 200 NI8 344 208 200 208 200 52 6,920<br />
535 536 5M 536 536 536 538 536 5J9 536 538 5b 536 134 16,510<br />
t OIALHOURS 830 038 0]2 9l4 0M 0b BJ0 8]2 974 0M 030 0J0 8I2 203 22.252<br />
Page 2 of 2<br />
r<br />
52<br />
100<br />
110<br />
8]8<br />
121<br />
I<br />
12<br />
CHECK 27.752
BEC14TEL HANFORD Inc. ONE YEAR COST FOR Date: nmr<br />
ERC 6 PRIME CONTR ISIC, DIRECT WORK) 300 A REA PROCESS TRENCHES CLOSURE I POST CLOSURE By ,A,AMARRe<br />
Job NO rI Charge 0 JOB NO. 11191-1031 R 31FX2 YNAO Cbk'd oLEOxN.11o3<br />
. AI rn I— 1` 11 I ,m,uvu N.' I I —I.: 1 Lead Esonlator YI.:AV RREE9RJC N Rev.:<br />
Unit Costs Labor Hours I Wage Sublotals<br />
ADDITIONAL COSTS<br />
s<br />
MAIL<br />
SALES SIC DIRECT<br />
_ Desuiplion CITY<br />
Equip MII 5!C Unit Hr Total Hr fMR Equip. Material Labor SIC SUBTOTAL TAX OHBP DISTRIBS G&A coAnNUxcv<br />
ems nNl Ie DSS I.<br />
MM<br />
_<br />
_ CLOSURE ACTIVITIES:<br />
^x.lnMro+ vr+n C.l rox 6 EA S301250 510035 $1 8.075 11519 51001 310 11 131.7 51<br />
SUSIOTAL 110,035 $1 2.075 so $4,510 !1003 $1,010 577,155<br />
N uaN<br />
nrscNrnanre+ AIII 60 HRS 1 60 54521 S2611 $2.111 102 5125 53 ,206<br />
Eiasmm w VU 1124 11.1 cw 60 HRS 1 60 $53 09 $1.221 $ 3 ,211 $503 51 54 3 11,550<br />
euriTDUI IN 35,532 15,932 51,055 5279 $7,166<br />
xc,Ac+E1MNO.nM.Nr1'. 1 LOT $99969 $925 54 SIp00 $926 $1,526 P174<br />
5362 $95 $ ,6!7<br />
w lNlnurq 100 HRS 1 100 $5]69 $5.369 $5,165 $971 $256 M,S9<br />
6.TIIY . NrNLTN<br />
10 HRS 1 10 $3].06 S739 $515<br />
S136 $35 stall<br />
TOTAL<br />
110 51000 $926 M.106 $!031 $1467 SSa6 $5,561<br />
M1UV4gN • MATERUI NANm wD 3.101 LCY 31255 1.0,0 00 560,990 110,900 $904 5 $3]05 $91,6 30<br />
a.lnr+nvsres if Cn 600 HRS 1 600 the 63 329301 $29,202 $5,10] $1,303 $35,311<br />
__ snr Err uC0.1N<br />
60 HRS 1 60 $7]66 $2.955 _ 93,953 $535 $1 61 53,9]1<br />
SRor IR.N]RDRT A nssu ro 3.107 ICY $4 6.99 3156.115 5156,165 INCLUDED $25.24 3 $7.619 $191,961<br />
S+or T+An6Po+T Adsoosu IR07 MMI 238 HRS 1 23a S5208 $11, 41 0 111,610 $2. 24 5 3592 815.261<br />
suslm 010 $11661 S66.Sa1 5196. 14 5 3760,712 110,000 $65,355 111960 $301.027<br />
e.c.ral Aa6c+.wxc 32907 ICY 20.10 510,000 516,000 114,000 13,610 $951 $26,572<br />
am 516,000 $16,000 $AM sTsia $956 536,533<br />
wnen+DEMT nARCATOM Or CLO.VRE I LOT 324 000.00 531000 $ 76.000 $ 0,000 $5.123 51131 $36.358<br />
CLOSURE - ONE YEAR $ P riori 1 Of I<br />
924.000 326,000 $ .000 $5,637 11 1!3 1 336,S53
CLOSURE-25% YEARS<br />
BECHTEL HANFORD Inc. ONE YEAR COST FOR Dale: .ant<br />
ERC L PRIME CONTR ( SIC. DIRECT IYORR) 799_AREAPROCE«TRENCUm-I;;^T 00SURE By: uIANERRL<br />
.toe NUlNw.I Cn9r9.e JOB NO 22192-103 t R31FX2 YNAO Cbk'd DURIn nAD<br />
W<br />
a1u..nmu..^nnl lnAUx s.a.v- 11-1 1 .1". 11 ARC Lead E60melor d: uu, ... e,.J. clwwN Rev.: 1<br />
Un11C.Sts Labor Hours Wage Sublolels<br />
ADDITIONAL COSTS<br />
_ Description CI TY UN<br />
_ CLOSURE ACTIVITIES:<br />
"OunIcoun.NRct<br />
IuP101A1<br />
Equip MII SIC Unit Hr Total Hr VAR Equip. Material labor S/C<br />
PEfMAIAYbIWBCRI Cx b Mf IW SBm gar BB i].bN i,EN tW I ' M ILN<br />
f MnRpYFMtY LxfA<br />
ITVAIfR lgxionlw:<br />
EIGMI NftlS b.SURfO SFMMM11ALli. VPRwVM.Pxx<br />
PEBCxOnIXtIMEUF RxOIIS OEGRbOAl1Ox MIOq.0 15 O<br />
n0 1 )411 dCwOROEIxnu. 6 , CMLORIOE. MON.<br />
—GAME S EM.<br />
InduuMWCw1 , C Y5EW PEN50 1 A 1PYREN<br />
AM rRIP PWAMEIfRS IPM. SPECInG CpIpIC1AME.<br />
IPIV ANI1 IIWI .Ak ru I<br />
IM<br />
l 1<br />
HRS $2,34 35961 100<br />
]M<br />
5100<br />
1]100<br />
15115<br />
SM73 $311<br />
11®<br />
32.193<br />
$ 12,962 $ 6.015<br />
SUBTOTAL<br />
IN<br />
MISS<br />
MATL<br />
SALES<br />
TAX<br />
eml<br />
SIC<br />
OHbP<br />
M<br />
3]1,291 INCLUDED INCLUDED<br />
DIRECT<br />
DISTRIB<br />
NIA<br />
Nm<br />
IA<br />
3506<br />
NIA<br />
GSA<br />
INw<br />
15<br />
$133<br />
coca—MIM<br />
w<br />
TOTAL<br />
t]I 00 131E 31?96x $ e Ots $21,291 $21.291<br />
MCI.0r B VR WPI.11. LI rMaIMS p<br />
vlExAxcE wsPfarw+ufo Mrror<br />
Iufu<br />
ox Sr. c.clE MSPmnov or<br />
--- mucr..rur<br />
--- —<br />
No ECOVIRws Pw<br />
cE51CMExclxtfR mn<br />
E NNROMUExI Gaxb R<br />
IRmblx6o9r<br />
suArexUUN Bw<br />
rvfR1<br />
2 WEL T<br />
025 HRS<br />
0 7 5 MRS<br />
100 1<br />
015 ms<br />
025 HRS<br />
050 HRS 31552<br />
125663 _<br />
100<br />
100<br />
100<br />
100<br />
100<br />
025<br />
075<br />
100<br />
025<br />
025<br />
050<br />
$5206<br />
$6521<br />
IBIS<br />
111.66<br />
51.51<br />
1]601 1 $6<br />
$13<br />
119<br />
RI<br />
fb6<br />
311<br />
Sla<br />
t51> $ 311<br />
$11<br />
S 41<br />
3 34<br />
$14<br />
$26<br />
3129 $11 7<br />
$2<br />
$9<br />
III<br />
$7<br />
$]<br />
$5<br />
$31<br />
$1<br />
SI<br />
$2<br />
31<br />
11<br />
97 9E<br />
Sig<br />
$go<br />
Itl<br />
113<br />
SL<br />
812<br />
DIAL -_ - ^^^ ]50 36 f191 3511 1116 t139 $151 $11 31,066<br />
APIEPLYB u IMSPf CIpx s PYYI<br />
ENNBWM F MI A L E xGP B 1x5 i m a tN 15 IIA NN trB 1]I 111E<br />
f NYWOw1ENt COURT ck 1xb IW MIM 1]15 SIN NE il] 1101<br />
IIGI DuCR Vtb I. EN011UE1 MRS SIO IN N 4 11 IN<br />
1RL SNI Ito IIN SS 11]1 IN NN<br />
CLOSURE - 25% YEAR $ Page i of 1<br />
I'M<br />
$142<br />
121,211
PUSI ULUSUHL - UNL TEAR$<br />
BECHTEL HANFORD Inc. ONE YEAR COST FOR Dale'. To m1<br />
ERC a PRIME CONtR (SIC, DIRECT WORK) ]009REA-PROCESS TRENCHES CLOSURE / PO I-QLQSURE By 1.1R'ERRE<br />
Jan NUneer r Ch ar ge s JOB NO, 22192-1071 R31FX2 YNAD Chk'd D 1EOAFARG<br />
en3unv911.-" :11 11 Sen.r.. a.Innnvan9e . I ..I EsUmetorA vL: A. LAPrt6nt FOR]. cPAPMUE Rev.: .<br />
Un<br />
O Description QTY ]UN<br />
it<br />
Costs Labor Hours Wage Subtotals<br />
ADDITIONAL COSTS<br />
MATL<br />
SALES S/C DIRECT<br />
1-<br />
Equip 066 SIC Unit Hr Total Hr S/HR Equip. Material Labor SIC SUBTOTAL TAX OH&P DISTRIBS G8A conrmcEMY TOTAL<br />
POST CLOSURE ACTIOTIES:<br />
Il SITE RESTOR.INNI IREVEOEIITR]N I 1.l a. SF 3o e] 315..1 AIIAR 3].311 31501 $925 IESAN<br />
SValO1PL<br />
pC51GN ENCER C N<br />
Blrl S IM$ 1. ] E-5 ADS 27 {I. {Ix x5 $9 x06<br />
FNVIRONMENI COMFgIM E PIN .<br />
IRS<br />
S IN 1<br />
1245 622.1 w.<br />
$1} xx<br />
l oon<br />
2s.<br />
1A.<br />
111.1 IfS,wl AS 3],511 15.1<br />
.D.w<br />
FEE.<br />
S.S ENA19<br />
II MSPECTKKI OF SUBSURFACE WELL CONIIp ONS<br />
S vAi 125313 32.069 19,099 $51 7 $400 w}] x.111<br />
%AIMING S CpIWIX S BM<br />
I )IRS IN I 35} 151 N 11 x]<br />
TRIP S 1-OPT .1. S IRS 1. ] 110 Sill 1]0 Il 6414<br />
En A MEN ).Pw 11WS IN 1 $55 155 310 AT Al.<br />
VEAVr DRIVERS wW IF 2 1.5 165} 1. 1 151 U] 11W 119 $5 SHE<br />
to xl NeI 1>.9 v. ssu wu arm tux<br />
ouourmwAR R WFU MgmL NAWF AVdm 4me] ylxl xWE lee. 11311 12 OR m.In<br />
__<br />
N:ACnNIN^ns 2 res 100 2 x2 T. 11D. x.. 119 Is t ill<br />
T)111NENGINEER AIR IRS 1W FAIN I'D, 51.1 3.1 SIT x.<br />
FNVIRONINIA1f1..R M<br />
RAN rR5 IN 15..5 1311 xx 119 110 INI<br />
FIELD E11TDR1 .11.<br />
IRS 105 le I.lx Ile] 8191 $131 we {931<br />
SAf F 1 1 AHEALIN D. 1 1 IRS 2 1.51 1109 11x Sl0 $5 Ilw<br />
.IFAVV pRIVERG MIC 0 I.5 11551 lx A I.., 195 111. 1%3 lw 115 13x<br />
uL _ _ J. 195 $1111 u... ISE.IN x.e. ..151 12.1. .1.11<br />
C OSl E S 11MA1 E I OR POST IICIVRE<br />
MO NITORING A MAINTENANCE<br />
PUI.NIRT A cc P.0LS BHI ]} MS 1. IT t5}x 11..1 HAT? 3]In 90 x..<br />
SUBTOTAL 32 $1.7 $IA" AID 17 6.1.<br />
11 OUARIERLI SIIE PISPEC PONS<br />
ENV) RONMEIIIN [N'iR Me 11 I RS lee 1 2 10.5 11112 w.rU 3]15 1A] IS,Ix<br />
111VMONMEW COMPLIANCE BIM1 1. IPf rM 1. wl A 19A1 x12 1 'Is SEl 11.10r<br />
OIR T.U. UI SPA 11. ENG AMEN 1A 1.5 1 4 1. 176 x9 UO SV $5 RH<br />
SVRIUTAL lR 12 r2. 11A It A. SN As IO 31]5 .,U.<br />
ISA PC i COMPLIANCE IFVR 1IM000. l rYlll<br />
_ REGULAIORV StI `ORI CNI 1. AS<br />
I W 2. ITT.. IIQ I]1 IIO,1 31 11 142 $51 2 111,1.1<br />
FNVIRMIMEIIIM TIP .11. 1 I.S I. . tH.S S.A.<br />
HM 119 1}I IN.<br />
SDIT.1.1 206 $11,11 3 111, 113 32021 $515 IN,N1<br />
160 PERMIT COMPLIANCE ADDER, R 9ASSES5 MOADDO<br />
CLOSURE OPOON UFO; o. N. LL n) -_<br />
PI .r M I NG A CIlN1RIX5 BIII x 1n5 AO .SS O. A. 1M x1.. I2H $1. is In<br />
n>narn coual. ncF 011 v. s 1. 10 w1. um uA11 1122 sN uAx<br />
m1mM-1.Mwr M, ITT.. vss NN 1Nr tx 111E<br />
^_.__<br />
1 A11..NC1<br />
AoMwls R. nVF Slumcl5<br />
LEGAL<br />
01<br />
mfr<br />
OrN 5<br />
.5<br />
1.5 I TO<br />
s<br />
1e<br />
3<br />
t. a<br />
in.<br />
Al29]<br />
NeT<br />
Las<br />
$n.<br />
wl<br />
Ins<br />
9.<br />
.1 1<br />
1w<br />
E.<br />
m<br />
m<br />
11]<br />
111.<br />
1x1<br />
SIR<br />
SVOIOIAL 1J6 ""A 11.1A. tll1. 11.1 H.xl<br />
POST CLOSURE - ONE YEAR $ Page 1 of 2
POST CLOSURE - ONE YEAR E<br />
BECHTEL HANFORD Inc. ONE YEAR COST FOR Date: Bmm<br />
ERC a PRIME CONTR (=, DIRECT WORK) 'OD AREA PROGF CC TR N -H c - OcURE I PO CT GLO C URF By. AALARIERRE<br />
JOCILBRberlChergaA<br />
w<br />
JOB NO 22192-103 1 R31FX2 YNAD Chk'd ILE.0<br />
I^nIS111M 11 VB1CF^a^.Vla][IIISM0.t 111 AI `IM1KI (IIFII0.).I )YI ARt Lead Estimator N.: JA VYIERRE FOR J CHAPMAN Rev.:<br />
Unit Costs Labor Hours Wage Subtotals<br />
ADDITIONAL COSTS<br />
POST CLOSURE ACIMtIES:<br />
Description QTY UN<br />
Equip MU SIC Unit Hr total Hr S/HR Equip. Material Labor $/C<br />
IIA GROUNDWATER MOMIORINO IFYBB-0BI PNNL 517 Ac 4P 316 . As IW 510 IN 73 )1355 )55,1]1 1]1,01] 4. .013 INCLUDW1 NCLUDU NN WP II..B1)<br />
TWO WELLS S ANI PLEO GUAA)ERLY.WO SIX N£LLS<br />
SAMMEDSEMUUI JALLYURAA NRv PERCMONCE TH YLENE<br />
e]q ITS OFGRAOAIION PROp)CIS. AM FIELD<br />
PAUAG,FR5<br />
SVBtOIAL 570 3{]55 tS5,1 1 1 VIA21 381,013 14,04<br />
11 0 G OUNOwe1fR MON11p111HG I r Y01 1NNL 10} W23 tl]B t]B)5 im III II)100 11155 38].11] 1]1,0]1 11}1,)11 IW,100EO NCLVDEO WA WA {41,]11<br />
ryIAAtLS SXAIP L EDOU.NTERIY AND SIX WELLS<br />
SAMPLEOSEMINryALLYURAwOM PEPCIkIDN LTNYLEHE<br />
XNO IT S OFGRADAnON PROwc15. XND IIELD<br />
PARR VETERS PI VS ONE MOp 10 SIIE WIDE PERM" CIRCA<br />
SUBIGIPL<br />
SUBTOTAL<br />
MATL<br />
SALES<br />
TAX<br />
6.071<br />
SIC<br />
OHBP<br />
251<br />
DIRECT<br />
DISTRIBS<br />
1,001<br />
GdA<br />
IGGA<br />
colrrRlGENCx<br />
wA<br />
TOTAL<br />
702 11 155 182,11] 1]10]1 31]11]1 11)1.]31<br />
[ RG We1LR MONII<br />
I<br />
NNOIIY00]] I 5M AXIS<br />
t]Y tl>]0 SM tB0 ]) 11]5{ 1110 t]]BrIO 1)1.)81 INCIIACI] INCLl2N1^ 1 18.181<br />
F;Vh<br />
I155XMM EO SEAI.NUAILY URAN<br />
P! NCIhOPOF INYLFNE Nq II S OECAX041gNPROd]CI5 ]<br />
ANOINLDPARMf A IERS<br />
SVBIOIAL<br />
PO51 CLOSURE CARE CERTIFICX .R<br />
SUBIOIAL<br />
i<br />
55M 11}35 t51 010 3TJ.000 4{,)01<br />
CER NFKAIIONSIJBCONTRXCI LOf IV 1e0W t]I,IM {)1.160 30,40 N.})) 31,055 4].4]<br />
POST CLOSURE -ONE YEARS Page 2 of 2<br />
48'181<br />
1])]00 1)1,160 f0.N0 50.3)) {1155 4!A])
POS I CLUSUHL - Zb V. I LAH $<br />
eECII]EL HANroao Ioc. ONE YEAR COST FOR Date: .1N1<br />
ERIC • PRIME CONTR (SIC, DIRECT WORN) a0 l) AREA PROCESS TRENCHES CLOSUR E POST CLOSURE By lAL ERRE<br />
Job Nu rrew l Charge a JOB NO 22192-1931 R3IFX2 YNAO Chk'd owo»IAROI<br />
.,I I'II,..11i IIR,IA 11 'I'll l4i .n,4]+lIl I..RR PI •I • NnI 1...11 1.1 l l': 11 AR I Lead EsUmetorA vl.' AWWRRE FCq J CHAPMAN Rev.: 1<br />
Unit Costs Labor Houra I Wage Subtotals<br />
ADDITIONAL COSTS<br />
s<br />
_ Description CITY UN Equip MU S/C Unit Hr Total Hr S/HR Equip. Material Labor SIC SUBTOTAL<br />
MATL<br />
SALES<br />
TAX<br />
SIC<br />
OHBP<br />
DIRECT<br />
DISTRIBS C6A coxnNCExcr TOTAL<br />
POST CLOSURE ACTIWTIES:<br />
am<br />
251 I199Y ANY<br />
»1<br />
n avARlf qu snuxsq¢IroxsPnq<br />
frvmnorvMErvl AI Eurg au1 1 ngsL 1. a IN IS NM Nv m m u»<br />
EWIAOWExi COUn11ANCE .., M RS IM KIM 3}15 "'1, 1N 11} 1»I<br />
LIGHT IRVCM IA150Y ENV ENG IIMEI HRS 1111 31R 111 15 11 31 In<br />
sOeIOIPt '21 bet 119 1100 15 SIN I» 1.<br />
1)c GNOVHDwAIER MOM1tO gIx01EYIel<br />
f ICrIH wFtlS 5/•M Vl F.O SEMIPNNI14lY VNANIIM. q<br />
>ERCHIOFOEIXYIENE ANp I15 OEG gnDA 11pH Cgp^1K15,<br />
AHp E1ELOPMANEIERS<br />
IJI HRS 3}II 11}}e 1D] I]I 3Pe )] 3111 1139.3 35M5 11.,11 INC., IN Ll r WA Ite.Nl<br />
01A1 111 IJII 11}Re} ISCeS IIANI ele,ell<br />
POST CLOSURE -25% YEAR 3 Pagel of 1
POST CLOSURE - 75% YEAR $<br />
BECHTEL HANFORD Inc. ONE YEAR COST FOR Date: w.?<br />
ERIC 6 PRIME CONTR (SIC, DIRECT WORN)<br />
300AR A PROG<br />
E_S S TRENCHE S CLO SURE I PO ST CLOSUR EBy: eA LAINERRE<br />
J00 Nu1Mer l Cnerge 3 JOB NO 22192-1031 R31F%2 YNAO Chk'd 0LEwLwo<br />
W<br />
I lMran\rxNI]NO 11121,14.rxA l 1'I1111nIME.1 UN ISN I Cl I.SDIN . 15141.AR1 Lead Esanator ApI .N DAEA EFOILI CW. AN Rev.: 4<br />
Unit Costs Labor Hours Wage Subtotals<br />
ADDITIONAL COSTS<br />
MATL<br />
SALES 57C DIRECT<br />
Description CITY UN EquiF<br />
MU SIC Unit HE Total HE $/HR Equip. Material Labor SIC SUBTOTAL TAX<br />
/00%<br />
CHI DISTRIBS<br />
25x le<br />
G&A<br />
Aar<br />
CONTINGENCY<br />
wA<br />
TOTAL<br />
POST CLOSURE ACTNITIES:<br />
u INSPECTION ED SUBSURFACE WELL CONOnpNS 6 . fel a vrELL` t]se eJ 31551 stsdu tJee 3151 113 H.3.<br />
15<br />
vL/. 1p11NGtCONfROLS VIII O15 NRe IW 015 11}In 4l9 114 31 1 2 IY<br />
OESIGNENGINEER D., }]5 NPS iw }}5 0521 ILA) IIe1 121 $1 Iltl<br />
ErvNRpFENI CgMPLMNCE eIn JEn IWS Iw lR0 In' IDN ILM $33 34 all.<br />
f IELDS1APpl1 .III }}5 1N3 1w ]25 $11.1 1101 1101 $19 15 SIM<br />
SArESYt NEALM ENI 0Is INS IW 0}5 WID 311 $41 31 $2 10<br />
LEAVY PENVERS MANIC 1501gS 11552 I W 1.w 1]..01 NJ 351 IT $1. 0 541<br />
SID IOIAI . 1050 $23 351} 41!52 {l,lAl I 05. 4122 O.IIf<br />
OUARIERLIMNEW5PECIANSIIY9Al<br />
F .Y.ENNE.L. ENGR NNI 2. DES 1W 11 1L4 45 II,w1 113.1 SIX 02 111.405<br />
ENVINDAMENI CDMRIANCF .M I} WS Iw 12 w1 J] 31b 111. 3111 05 iw1<br />
III IRLICN IAI 50%EW LNG TIME) 12 TINS 11 )4 1 352 $14 31 1 13 ME<br />
SU.IOIAL 3R 13.043 $52 12. 140 311 1].2 31 C0 $2.5w<br />
N. PNNA'COMP1MNCE1r YWI<br />
Sum OUL<br />
REGMATORV SUPPONI ELL IN) )IRS Iw 150 15362 11 r" 34.053 31 t5] 1]11 1E.t14<br />
ENVIRONMEN1nLfNGR ED, A IRS 1W 1 ILAAS IJ21 011 3w In, {Ml<br />
u GRWNOWAm. MOrvuORlrro lr.em 402 HRS $234 35981 100 40200 598.73 SN1 $38,885 $24.U4<br />
III v4 I re 1AMPI 11 SI MMAN nu. 113DIIVANUML<br />
_ - rLUrvr. RlO nr.uu I'M .11 N111 ---<br />
I12C19OCIlLOYa T L Y IE NE . AND VINYL CIILONIOE IRe<br />
MANGANESE, TDALLIW PC.0 CHRYSENE EENSO I ArYRE<br />
ANOIIELDCARAMEIE LDIE. SPECINCCONDPOAIKE<br />
I W BIDI IY MA TEMPERATURE)<br />
156 111110 I.]w Ilsm 040 111044<br />
'1163,8]0 INCLUDED INCLUDED NIA NIA $63,370<br />
e.m oTAL 40200 $943 338,885 524044 383.170 116],00<br />
POST CLOSURE - 75% YEAR 3 Page 1 of 1
CERTIFICATION OF THE PROJECTIONS OF ANTICIPATED CLOSURE AND<br />
POSTCLOSURE COSTS FOR TREATMENT, STORAGE, AND/OR DISPOSAL UNITS,<br />
IN ACCORDANCE WITH<br />
CONDITION I.F. OF THE HANFORD FACILITY<br />
RESOURCE CONSERVATION AND RECOVERY ACT PERMIT,<br />
DANGEROUS WASTE PORTION, REVISION 3A
PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND/OR POSTCLOSURE<br />
FOR<br />
TREATMENT, STORAGE, AND/OR DISPOSAL UNITS INCLUDED IN THE HANFORD FACILITY<br />
RESOURCE CONSERVATION AND RECOVERY ACT PERMIT, DANGEROUS WASTE . PORTION,<br />
REVISION 3A<br />
CERTIFICATION<br />
The following certification, required by WAC 173-303-810(13), is hereby<br />
included:<br />
I certify under penalty of law that this document and all<br />
attachments/enclosures were prepared under my direction or supervision in<br />
accordance with a system designed to assure that qualified personnel properly<br />
gather and evaluate the information submitted. Based on my inquiry of the<br />
person or persons who manage the system, or those persons directly responsible<br />
for gathering the information, the information submitted is, to the best of my<br />
knowledge and belief, true, accurate, and complete. I am aware that there are<br />
significant penalties for submitting false information, including the<br />
possibility of fine and imprisonment for knowing violations.<br />
wner/Operator<br />
J o}TT>^lT'Waga e r, la n a r<br />
U.S. Department of Energy<br />
Richland Operations Office<br />
o- pe ator*<br />
Henry J. Hatch, President<br />
Fluor Daniel <strong>Hanford</strong>, Inc.<br />
o-operator**<br />
William J. Madia, Dire or<br />
Pacific Nort^^h^^west Nat onal Laboratory<br />
Co-operator***<br />
Steve D. Liedle, President<br />
Bechtel <strong>Hanford</strong>, Inc.<br />
')/ 3-t A 7<br />
/a d " 9 z<br />
Date<br />
ate<br />
laz ql<br />
Uf a e<br />
i c) O _<br />
Fluor Denial <strong>Hanford</strong>, Inc. It ...r...... itnla.as for the following treatment, storage, end/or disposal ITSDI units on the <strong>Hanford</strong> Facility<br />
and is signing for the information on these TSD uni ts only: 616 Nonradioactive Dangerous Waste Storage Facility, PUREX Storage<br />
Tunnels, 300 Area Solvent Evaporator, 2727-S Storage Facility, 218E-8 Borrow Pit Demobhon <strong>Site</strong>. 200 West A re a Ash Pit<br />
Demolition <strong>Site</strong>, 2101-M Pond, 2168-3 Expansion Ponds, <strong>Hanford</strong> Patrol Academy Demolition <strong>Site</strong>s. 105-DR Large Sodium Fire<br />
Facility, 304 Concretion Facility, 4843 Alkali Metal Storage Facility, 3718 F Alkali Metal Treatment and Storage Area, and 303 K<br />
Storage Facility,<br />
Pacific Northwest National Laborato ry (Pacific No rt hwest) has respon si bility for the following <strong>Hanford</strong> Facility TSD units and Is<br />
signing for the information on these TSD units only: 305-8 Storage Facility, Simulated High-Level Waste Slurry Treatment and<br />
Storage, and groundwater monitoring cone for the 183 H Solar Evaporation Basins and the 300 Area Pro cess Trenches, based on the<br />
current version of the closure/postclosuro plans (Attachments 11 and 31 to the <strong>Hanford</strong> Facility RCRA Permit. DW po rt ion).<br />
"' Bechtel <strong>Hanford</strong>. Inc. has responsibility for the following <strong>Hanford</strong> Facility TSD unite and is signing for the information on theta TSD<br />
units only, excluding the groundwater monitoring conducted by Pacific Northwest: 183-H Solar Evaporation Basins, and 300 Area<br />
Process Trencher.
THIS PAGENNE RONALL^Y<br />
44214 1
CORRESPONDENCE DISTRIBUTION COVERSHEET<br />
Author Addressee Correspgndence No<br />
J. E. Rasmussen, RL M. N. Jaraysi, Ecology Incoming:9760569<br />
W. D. Adair, FDH<br />
Xref: FDH-9759283.1<br />
F. A. Ruck, FDH, 376-9876<br />
(D. B. Jensen, WMH, 373-9327)<br />
Page 1 of 2<br />
Xref: 6MH-9759283<br />
subject: PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND/OR POSTCLOSURE FOR<br />
HANFORD FACILITY TREATMENT, STORAGE, AND/OR DISPOSAL UNITS<br />
DISTRIBUTION<br />
Approval Date Name Location Watt<br />
Correspondence Control A3-01 X<br />
Fluor Daniel <strong>Hanford</strong>, Inc.<br />
W. D. Adair H6-21<br />
T. J. Harper H8-69<br />
C. G. Mattsson N1-26<br />
E. S. McGinley, II H8-68<br />
L. J. Olguin N1-26<br />
S. M. Price H6-23 X<br />
F. A. Ruck, III H6-22 X<br />
M. C. Skriba H8-68<br />
W. E. Toebe H6-22<br />
L. K. Trent H8-67<br />
A. M. Umek 57-40<br />
N. H. Williams R3-11<br />
B. D. Williamson B3-15 X<br />
SMP File/LB H6-23 X<br />
B&W <strong>Hanford</strong> ComDdn<br />
T. A. Dillhoff N2-57 X<br />
K. A. Hadley R3-56<br />
G. J. LeBaron 56-15 X<br />
E. F. Loika N2-51<br />
I. L. Metcalf L6-26<br />
D. E. Rasmussen N1-47 X<br />
J. A. Remaize L6-26 X<br />
S. W. Scott N2-57<br />
C. D. Sorensen R3-56<br />
J. M. Steffen N1-47<br />
DE&S <strong>Hanford</strong>, Inc.<br />
P. G. LeRoy R3-11<br />
D. J. Watson X3-79 X<br />
D nCor<br />
B. J. Dixon B4-20 X<br />
L. S. McDaniel H5-33<br />
The enclosure to this letter is the same as the attachment to letter<br />
WMH-9759283.
CORRESPONDENCE DISTRIBUTION COVERSHEET<br />
Author Addressee Correspondence No.<br />
J. E. Rasmussen, RL M. N. Jaraysi, Ecology Incoming:9760569<br />
W. D. Adair, FDH<br />
Xref:1MH-9759283.1<br />
(D. B. Jensen, WMH)<br />
Page 2 of 2<br />
Xref: 1MH-9759283<br />
Subject: PROJECTIONS OF ANTICIPATED COSTS FOR CLOSURE AND/OR POSTCLOSURE FOR<br />
HANFORD FACILITY TREATMENT, STORAGE, AND/OR DISPOSAL UNITS<br />
DISTRIBUTION<br />
ADoroval Date Name Location u/att<br />
Lockheed Martin <strong>Hanford</strong> Corporation<br />
D. J. Carrell R1-51 X<br />
R, G. Erlandson R2-36 X<br />
E. E. Mayer H5-24<br />
Lockheed Martin Services, Inc.<br />
EDMC H6-08 X<br />
<strong>Hanford</strong> Fac. Oper. Rec. H6-08 X<br />
Numatec <strong>Hanford</strong> Corporation<br />
A. R. Hawkins B3-55<br />
R. A. Kaldor H5-25 X<br />
Waste Mana g ement Federal Services<br />
of <strong>Hanford</strong> Inc.<br />
E. S. Aromi H6-30<br />
B. M. Barnes T4-04 X<br />
R. C. Bowman H6-24<br />
R. H. Engelmann H6-26<br />
R. J. Giroir 1-4-05<br />
D. B. Jensen H6-26 X<br />
J. McCoy H6-21<br />
K. M. McDonald T4-04 X<br />
D. L. Renberger T3-03<br />
J. C. Sonnichsen H6-24<br />
J. A. Winterhalder H6-21 X<br />
M. T. Yasdick H6-10<br />
DBJ File/LB H6-26 X<br />
The enclosure to this letter is the same as the attachment to letter<br />
WMH-9759283.