RESPONSE TO COMMENTS ON THE DEIS<br />

B o u l d e r B a y C o m m u n i t y E n h a n c e m e n t P r o g r a m P r o j e c t E I S<br />

TRPA land coverage calculations and analysis are required to consider more than just<br />

building-use land coverage. Alternative C proposes 356,043 square feet of land<br />

coverage compared to 377,875 square feet for Alternative D. Alternative C allows<br />

for removal of more land coverage than Alternative D as identified in Table 4.2-6 and<br />

thus the overall land coverage associated with Alternative C is less than Alternative<br />

D. Building land uses are described in DEIS Chapter 2.<br />

Comment 322-z: Comment Summary - GEO-1: Allowable coverage is skewed by ROW coverage, road<br />

abandonment, which is assigned to project use and should be disallowed.<br />

The statement that allowable base coverage for the project area is skewed by public<br />

ROW coverage is not supported. Table 4.2-3 identifies "actual" (term used in<br />

comment) or verified existing land coverage (TRPA definition) versus TRPA<br />

allowable base coverage for the project area. The calculations follow the process<br />

outlined in TRPA Code Section 20.3.D, and per 20.3.D(1)(b), the calculations<br />

excludes land beneath ROWs from inclusion in the project area or the calculations for<br />

base allowable coverage. Table 4.2-6 presents the proposed or "actual" land<br />

coverage for the action Alternatives compared to the TRPA base allowable land<br />

coverage for determination of excess land coverage (per page 20-25 of TRPA Code<br />

Chapter 20, Excess Land Coverage equals the existing amount of land coverage, less<br />

the total of the following: maximum allowable amount of base coverage, the amount<br />

of coverage approved for transfer, and the amount of coverage previously mitigated)<br />

and mitigation requirements associated with excess land coverage. As approved by<br />

Washoe County in their ROW abandonment, the action Alternatives absorb ROWs<br />

into the project area in order to make improvements on these lands and to remove and<br />

restore a portion of the existing verified land coverage. In other words, the area<br />

assigned for public roadway ROW is not the same under the existing conditions and<br />

Alternatives C and D. The land coverage that will remain in the ROWs is included in<br />

the excess land coverage totals, as required by TRPA Code Section 20.3.D(2)(c),<br />

because Boulder Bay will assume ownership. In summary, land area associated with<br />

the ROWs was not included in the calculations for allowable base coverage but the<br />

land coverage from the ROWs was included in the calculations for proposed land<br />

coverage for Alternatives C, D and E and also accounted for in the calculations for<br />

excess coverage mitigations.<br />

Comment 322-aa: Comment Summary - Impact GEO-2 does not consider the impact of taller buildings<br />

in an evacuation situation. If earthquakes can collapse buildings built to code, this is<br />

magnified by the excess building height and requires mitigation that buildings should<br />

exceed County code for seismic standards.<br />

The emergency response plan (mitigation measure GEO-2B) will be prepared to<br />

reflect the emergency response needs of the selected project Alternative and will be<br />

based on the resultant site configuration and building heights. Prior to issuance of a<br />

certificate of occupancy by Washoe County Department of Building and Safety,<br />

buildings constructed for any project Alternative will be inspected by North Lake<br />

<strong>Tahoe</strong> Fire Protection District and for compliance with Washoe County Seismic<br />

Codes as well as other safety and fire codes identified in the Safety Plan (submitted<br />

to Washoe County Sheriffs Office and the Fire Protection District to comply with<br />

mitigation measure PSU-1D). Buildings of greater height will be designed and<br />

constructed to conform to codified regulations and building codes. Furthermore,<br />

mitigation measure PSU-C1 requires Boulder Bay to work with the Washoe County<br />

Emergency Management Center (EMC) for further development of emergency plans<br />

and operations protocols for evacuation, emergency shelters or staging areas.<br />

SEPTEMBER 8 , 2010 HAUGE BRUECK ASSOCIATES PAGE 8- 87