19.06.2013 Views

FEIS - Tahoe Regional Planning Agency

FEIS - Tahoe Regional Planning Agency

FEIS - Tahoe Regional Planning Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RESPONSE TO COMMENTS ON THE DEIS<br />

B o u l d e r B a y C o m m u n i t y E n h a n c e m e n t P r o g r a m P r o j e c t E I S<br />

Comment 108-g: Comment Summary - Alts. C and D state undergrounding of utilities as a benefit.<br />

Please see response to comment 93-i.<br />

Comment Letter 109 – Breternitz, John, 12/17/2009<br />

Comment109-a: Comment Summary - Why was Boulder Bay allowed to forego its BMPs?<br />

This question was raised during the DEIS hearings and was responded to by Joanne<br />

Marchetta as follows: When the project proponent bought the property, TRPA<br />

decided to work with Boulder Bay, LLC to improve upon the future project area<br />

rather than waste resources by requiring a retrofit that was anticipated to be removed<br />

a few years later. TRPA and Boulder Bay, LLC came to the agreement: to maintain<br />

the existing BMPs and stormwater system; install site-specific temporary BMPs;<br />

design the permanent BMPs to the proposed project area; and work to create<br />

environmental gain and synergy in the NSCP area by integrating project area<br />

stormwater treatment systems with existing and proposed upslope and downslope<br />

projects to create regional stormwater management systems. The temporary BMPs<br />

constructed by the project proponent include, full drain inlet cleanouts of the existing<br />

stormwater BMPs, landscaping and mulching of exposed dirt areas on site and<br />

installation of F-rails for slope stabilization at the back of the Biltmore parking lot.<br />

Please see supplemental information for DEIS Appendix P in Appendix AB for<br />

detailed plan sets.<br />

Comment Letter 110 – Delaney, Tim, 12/17/2009<br />

Comment 110-a: Comment Summary - Supports project if there is a guarantee or insurance policy to<br />

complete project if developer goes bankrupt, a specific number of TAUs designated<br />

to the Crystal Bay/Incline Village area, and no rule changes for the East<br />

Shore/Emerald Bay.<br />

The commenter is concerned the Project will go bankrupt, leaving an unfinished<br />

project area, that TRPA Code amendments will affect other areas of the lake, and that<br />

the Project would develop more TAUs than are allowed in Crystal Bay. Boulder Bay<br />

intends to secure financing for the Project before beginning construction. TRPA does<br />

not have a mechanism to require the developer to arrange for financing of the entire<br />

approved Project, but does require the payment of a sizable security for the permit.<br />

In regard to Code amendments affecting other areas of the lake, the height<br />

amendment includes language to limit its applicability to the NSCP area only. Please<br />

see response to comment number 93-b. It should also be noted that the existing<br />

height of <strong>Tahoe</strong> Biltmore structures is 76 feet and maximum height allowed under the<br />

proposed amendment would be less than this height, but over a larger area of the<br />

Project. Future height amendment proposals for other areas around the lake are<br />

subject to TRPA review and approval. Because this Project does not affect the East<br />

Shore or Emerald Bay as alluded in the comment letter, a federal "written agreement"<br />

regarding these two areas is unrelated to this Project and outside the scope of this<br />

EIS. Finally, the number of TAUs designated for the project area is outlined in the<br />

NSCP. The limit expressed in the NSCP is only related to bonus units from the<br />

NSCP allocation pool. The ability to transfer in other special project bonus units or<br />

existing units is not subject to the NSCP limit. The Project does not exceed TAU<br />

limits or allocations per TRPA policies.<br />

PAGE 8- 46 HAUGE BRUECK ASSOCIATES SEPTEMBER 8 , 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!