RESPONSE TO COMMENTS ON THE DEIS<br />
B o u l d e r B a y C o m m u n i t y E n h a n c e m e n t P r o g r a m P r o j e c t E I S<br />
The Project does not propose and amendment to the North Stateline Community<br />
Plan. Approval of the Project is separate from approval of the <strong>Regional</strong> Plan Update.<br />
This latter comment does not address an inadequacy of the EIS and the comment is<br />
noted for TRPA consideration.<br />
Comment 43-b: Comment Summary – There is no way to put a bike trail to Incline Village from<br />
Crystal Bay.<br />
The commenter expresses an opinion. The comment is not relevant to the content or<br />
adequacy of the environmental analysis and documentation in the DEIS. No response<br />
is necessary.<br />
Comment 43-c: Comment Summary – Read the ARUP study, there are a lot of flaws.<br />
This is not a comment on the content or adequacy of the DEIS. This information is<br />
passed on to the Project proponent and decision maker(s) for consideration. No<br />
further response to this comment in relation to the DEIS is warranted.<br />
Comment 43-d: Comment Summary – DEIS is too long and unclear.<br />
Speaker 44 – Brian Paulson<br />
Comment noted. This comment represents opinion and does not specify where or<br />
how the DEIS is unclear, so no further response can be made.<br />
Comment 44-a: Comment Summary – Supports the project.<br />
Comment noted.<br />
Speaker 45 – Bryon Sher, Governing Board Member<br />
Comment 45-a: Comment Summary – Concerns with the EIR. Traffic – thinks analysis is flawed for<br />
reasons outlined by Dan Seigel and because the basis is reduction of gaming, which<br />
is in decline.<br />
Please refer to Master Response 2.<br />
Comment 45-b: Comment Summary – TMDL – Need to address this new standard which will be<br />
required in the new <strong>Regional</strong> Plan. What is the current load of fine sediments and<br />
what would be promised by the Alternatives. Will we get a 32% decrease in fine<br />
sediments outlined by Lahontan?<br />
Please see Master Response 1. The TMDL methodology has been utilized to<br />
analyze FSP contribution as noted in Appendix AB of the <strong>FEIS</strong>. Alternative C will<br />
meet and exceed the 32% decrease in FSP.<br />
Comment 45-c: Comment Summary – Height amendment – Does it apply lakeside of Highway? Is it<br />
a precedent for the whole Community Plan?<br />
The height amendment does not apply lakeside of the highway (SR 28). The area in<br />
which the proposed additional height may apply is limited to the project area on the<br />
north side of the highway and does not extend to land beyond the boundaries of the<br />
project area.<br />
Comment 45-d: Comment Summary – What is consistency with the North Stateline Community Plan?<br />
If not consistent, will the NSCP need to be amended? If so, how will the NSCP be<br />
amended and when?<br />
SEPTEMBER 8 , 2010 HAUGE BRUECK ASSOCIATES PAGE 8- 185