RESPONSE TO COMMENTS ON THE DEIS<br />
B o u l d e r B a y C o m m u n i t y E n h a n c e m e n t P r o g r a m P r o j e c t E I S<br />
Speaker 4 – Robert Maxson, Sierra Nevada College<br />
Comment 4-a: Comment Summary – See comment letter number 60 for a transcript of the oral<br />
comments.<br />
Comment noted and responses are referenced to comment letter 60.<br />
Speaker 5 – Ann Nichols, North <strong>Tahoe</strong> Preservation Alliance<br />
Comment 5-a: Comment Summary – NOP did not describe whole project area – it left out the<br />
Crystal Bay Motel.<br />
The Project did not substantially change following the publication of the NOP. The<br />
Crystal Bay Motel parcel was added to the project area upon agreement that the<br />
Project would remove the hotel structure to allow for use of TAUs and to provide<br />
expansion of stormwater treatment systems per CEP participation requirements.<br />
Comment 5-b: Comment Summary – Analyze height amendment by itself separate from the project.<br />
This is not a comment on the content or adequacy of the DEIS. This information is<br />
passed on to the Project proponent and decision maker(s) for consideration. No<br />
further response to this comment in relation to the DEIS is warranted.<br />
Comment 5-c: Comment Summary – Worried about the precedence that Boulder Bay will set for the<br />
region.<br />
The commenter expresses an opinion. This is not a comment on the content or<br />
adequacy of the DEIS. This information is passed on to the Project proponent and<br />
decision maker(s) for consideration. No further response to this comment in relation<br />
to the DEIS is warranted.<br />
Comment 5-d: Comment Summary – The height amendment is not clear – it references additional<br />
height modifiers.<br />
The proposed height amendment (DEIS Appendix U) includes a list of requirements<br />
that Boulder Bay must meet in order to earn additional height. These requirements<br />
are included in Section 1.a, 1.b, 1.c, 1.e, 1.f, 1.g, and 1.h. It also lists findings that<br />
TRPA must make to approve the additional building height – these are listed in<br />
Section 1.i. The maximum building heights that can be constructed if additional<br />
height is granted is listed in Section 1.d.<br />
Comment 5-e: Comment Summary – Worried about impacts to nearby beaches.<br />
Please see responses to comments 93-k, 93-l, 122-c, 171-d, 286-ap, 286-aq, 322-ba,<br />
322-bx, 322-bz, 322-fx, 322-fz, 322-ba and 322-bb.<br />
Comment 5-f: Comment Summary – Does not think the scenic simulations are accurate.<br />
Please see responses to comments 322-hs, 332-an and 335-ah.<br />
Comment 5-g: Comment Summary – Thinks that the open space discussion is misleading – the<br />
project will result in a loss of open space.<br />
Open space is declared in Chapter 2 and analyzed in Chapters 4.1, 4.2, 4.3 and 4.6.<br />
Deed-restricting land for a stated, specific use protects this acreage from future<br />
development and changes in land uses. The project will deed-restrict acreage within<br />
the project area that is currently not designated as open space in an amount<br />
equivalent to that provided for in the Mariner Agreement.<br />
PAGE 8- 164 HAUGE BRUECK ASSOCIATES SEPTEMBER 8 , 2010