RESPONSE TO COMMENTS ON THE DEIS<br />

B o u l d e r B a y C o m m u n i t y E n h a n c e m e n t P r o g r a m P r o j e c t E I S<br />

come from existing but unused water rights. Water use at the project area would not<br />

affect water supplies available to other water service providers.<br />

Comment Letter 335 - Grassi, Ron, <strong>Tahoe</strong> Area Sierra Group, 02/04/10<br />

Comment 335-a: Comment Summary - The TRPA cannot approve a project that increases VMTs and<br />

vehicle trips because existing impacts from traffic (road dust, NOx emissions), exceed<br />

TMDLs and other thresholds for water quality impacts.<br />

Please refer to Master Response 2, which compares the Proposed Project and<br />

Alternatives to an alternative existing baseline. The additional analysis supports the<br />

conclusions in the DEIS that vehicle trips will not be increased under Alternative C<br />

compared to the No Project Alternative.<br />

Comment 335-b: Comment Summary - The traffic impact conclusions for Alts. C and D are not<br />

accurate because they use an inappropriate baseline for existing conditions, i.e.,<br />

theoretical vs. actual existing trips and VMTs, and reduction of casino floor space<br />

based on former (and now vacant) uses instead of current uses.<br />

Please refer to Master Response 2, which compares the Proposed Project and<br />

Alternatives to an alternative existing baseline.<br />

Comment 335-c: Comment Summary - The trip generation assumptions are based on other destination<br />

resorts that are located at ski areas or other amenities. As Boulder Bay is located<br />

away from ski areas, additional trips would be generated.<br />

The trip generation analysis for the Boulder Bay Project is based on trip generation<br />

rates provided in the TRPA Trip Table, ITE Trip Generation, 8 th Edition, and casino<br />

trip generation information provided in the DEIS. The analysis is performed for<br />

summer months, in accordance with TRPA’s standard analysis procedures. Traffic<br />

volumes in the <strong>Tahoe</strong> Basin are higher in summer months than winter months.<br />

Comment 332-d: Comment Summary - The EIS needs to quantify expected numbers of residents,<br />

guests, and employees at buildout; and parking provided, housing in the vicinity to<br />

quantify impacts to traffic and parking.<br />

Table 8.5-8 summarizes the number of residents, TAU guests, employees and<br />

parking spaces provided for each project Alternative. The basis for the resident and<br />

employment information can be found in the DEIS in Chapter 4.11.<br />