CITY SANITATION PLAN - Ministry of Urban Development
CITY SANITATION PLAN - Ministry of Urban Development
CITY SANITATION PLAN - Ministry of Urban Development
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>CITY</strong> <strong>SANITATION</strong> <strong>PLAN</strong> BAREILLY<br />
Government Banks Rs.Lakhs Nil<br />
Commercial Banks/Bonds Rs.Lakhs Nil<br />
Total Rs.Lakhs 80.00<br />
Key Issues:<br />
The source <strong>of</strong> sewer is mostly from domestic households.<br />
The total length <strong>of</strong> sewerage network pipes in the city is about 206.2 km but, the age <strong>of</strong> the<br />
sewerage network pipes is only about 35 years.<br />
The total area covered by sewerage network is only about 25 sq.km<br />
The thus produced waste water is about 99.2 MLD from all the sources within the city.<br />
No sewerage treatment plant.<br />
STORM WATER DRAINS<br />
The following table illustrates the storm water drainage network for each zone. The table illustrates<br />
the number <strong>of</strong> slum areas in each zone, total area <strong>of</strong> storm water drainage network in each zone and<br />
total length <strong>of</strong> roads in each zone. This also illustrates the total length <strong>of</strong> drains – primary, secondary<br />
and tertiary drains within the city. The following also illustrates the major flood prone drains.<br />
Word Name Read Total Length <strong>of</strong> Drains Flood Prone<br />
Length Primary Secondary Tertiary Areas<br />
(K.M) (K.M) (K.M) (K.M) (Number)<br />
Ward-1 Jatavpura 6.636 9.60 1.60 0.80 -<br />
Ward-2 Biharipur Civil<br />
Lines<br />
Ward-3 Nawada<br />
Shakhan<br />
5.840 6.60 3.00 2.00 -<br />
9.212 13.20 3.20 1.80 -<br />
Ward-4 Suger Foctory 4.845 7.50 1.00 1.10 -<br />
ADMINISTRATIVE STAFF COLLEGE OF INDIA, HYDERABAD Page 64