19.06.2013 Views

CITY SANITATION PLAN - Ministry of Urban Development

CITY SANITATION PLAN - Ministry of Urban Development

CITY SANITATION PLAN - Ministry of Urban Development

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CITY</strong> <strong>SANITATION</strong> <strong>PLAN</strong> BAREILLY<br />

MRTS, terrain conditions, and procedural delays in approvals. To reduce the repayment burden on the<br />

local body, it was decided to collect deposits from at least 10,000 residents before calling for tenders;<br />

this was also to ensure effective participation <strong>of</strong> people in the project. The names <strong>of</strong> the depositors<br />

were displayed in public places to motivate others to pay. Officials and non-<strong>of</strong>ficials, especially the<br />

chairperson <strong>of</strong> Alandur municipality, organised detailed discussions with the residents <strong>of</strong> the city and<br />

resident associations, in order to explain the project details and benefits <strong>of</strong> the sewerage project as part<br />

<strong>of</strong> assessing the willingness to pay. Effective and timely communication ensured participation <strong>of</strong> key<br />

stakeholders and beneficiaries in the initiative. An election-style campaign was launched. Television and<br />

newspapers were roped in to motivate the public. Sanitary workers also conducted a door-to-door<br />

campaign in support <strong>of</strong> the project. To ensure the inclusion <strong>of</strong> the poor and slum residents, a provision<br />

was also made for community toilets connected to the sewerage system.<br />

The total project cost was estimated at Rs. 34 crores with a break-up shown in the table:<br />

Sources <strong>of</strong> Funds (Rs. in Cr.)<br />

SOURCE CONTRIBUTION % Of TOTAL<br />

TNUIDCO Loan 16 47.06<br />

Citizen's contribution 8 23.53<br />

TNUIFSL Loan 3 11.76<br />

TNUIFSL Grant 4 8.82<br />

Interest on deposits 2 5.88<br />

TNUIDCO Grant 1 2.94<br />

Total 34 100.00<br />

Tariff Structure HSC Tariff Domestic Category HSC Tariff Non Domestic - Commercial and Industrial<br />

Category<br />

Square Feet Monthly Tariff (Rs.) Square Feet Monthly Tariff (Rs.)<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!