14.06.2013 Views

ÇAĞRILI KONUŞMALAR / KEYNOTES Invited Speeches ... - TPJD

ÇAĞRILI KONUŞMALAR / KEYNOTES Invited Speeches ... - TPJD

ÇAĞRILI KONUŞMALAR / KEYNOTES Invited Speeches ... - TPJD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Black Sea Ultra Deepwater Drilling Operations and TPAO<br />

Recep Atalay, Selı̇n Kırbıyık<br />

Turkish Petroleum Corporation, Drilling Department, Ankara<br />

In 2010, in the Turkish Black Sea Sector, 3 wells has been drilled with water depths more than<br />

1800 m. Each can be classified as wildcat wells when their distances and uncertainties are<br />

considered.Turkish Petroleum Corporation (TPAO) has at least 50% share on these wells. TPAO<br />

was the operator of the two wells, where in the last one, Sürmene-1, was the sole ownser. World’s<br />

leading petroleum companies ExxonMobil, Chevron, Petrobras also involved in this project as<br />

either the operator or the partner. There has been a considerable increase in exploration and<br />

production facilities in the industry with the increasing oil prices since 2004. The only sector<br />

that was not affected by the 2008 worldwide economical crisis was the ultra deep water drilling<br />

operations. Operations in the Black Sea were held during the most active period of the industry.<br />

Therefore, it embraces its own challenges in various manners. It has taken 4 years to bring in<br />

a competent drilling unit to Black Sea, which can be considered as a remote area. It is even<br />

harder to sign a short-term contract to drill a couple of wells. Even though the idea of sharing<br />

the materials and services with partners seems logical and practical, it has its own management<br />

challenges. It needs significant importance and management that the offshore industry applied<br />

its new methodologies first in Turkey and for TPAO. The most important aspect of a project of<br />

this scale, is to form a project team that is capable of reaching the objectives of the project and<br />

is to provide a working environment that makes it easier to work in synergy. The purpose of this<br />

study to define how an ultra deep water drilling project is managed beginning from the planning<br />

phase, which has taken place in Black Sea with an inadequate infrastructure, challenging and<br />

complicated logistics environment, limited experienced and qualified human resources and an<br />

area that has inadequate and complicated rules, and share it with the industry, universities and<br />

interested audience.<br />

Keywords: Black Sea Offshore, Ultra Deepwater Drilling Operations (UDWD), Mobile Offshore<br />

Drilling Unit (MODU), Dynamic Positioning (DP), Semi Submersible Drilling Unit, Drillship, Drilling<br />

Services Agreement (DSA), Rig Farm Out Agreement (RFOA), Basis of Design (BoD), Management<br />

of Change (MoC), Key Performance Indicators (KPI), Project Team<br />

75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!