14.06.2013 Views

ÇAĞRILI KONUŞMALAR / KEYNOTES Invited Speeches ... - TPJD

ÇAĞRILI KONUŞMALAR / KEYNOTES Invited Speeches ... - TPJD

ÇAĞRILI KONUŞMALAR / KEYNOTES Invited Speeches ... - TPJD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Logistics Operations in Sürmene-1 Ultra-Deepwater Drilling<br />

M. Tarık Öztürk<br />

Turkish Petroleum Corporation, Drilling Department, Ankara<br />

Ultra-deep water drilling operations are conducted in water depths more than 1000m and they<br />

are the most challenging tasks in the oil industry. Such kind of high risk and high cost tasks<br />

includes variety of sub-tasks and logistics operations are one of them. In order to provide link<br />

between rig site and land, shore base plays key role in terms of supplying every kind of material to<br />

the rig according to operational necessities complying with required rigging, lifting and handling<br />

procedures.<br />

In 2010, November, TPAO started to drill Sürmene-1 well and logistics operations are conducted<br />

in Trabzon Shorebase from September 2010 to March 2011. Logistics base established one month<br />

prior to the spud of the Sürmene-1 well and nowadays operating with reduced crew for the next<br />

operations. During active period of the Trabzon base, all equipment related to rig site send from<br />

base via 2 platform supply vessels (PSVs) Siem Danis & Siem Louisa. Dedicated mud plant of<br />

5000bbl total capacity is operated in the base in order to mix drilling fluid and supplying back-up<br />

drilling fluid in case of severe losses. Bulk materials that required during operations are provided<br />

with bulk units established in the base. On the other hand prior to sending casings to the rig,<br />

inspection activities conducted such as non-destructive test, drifting and thread control. One key<br />

item used in shore base during Sürmene-1 well was the bucking machine. Bucking machine used<br />

in order to make-up and break-down all wellhead running tools, liner running tools, cement<br />

heads and all casing accessories in order to gain from rig time.<br />

All activities conducted during active period of the Trabzon Shorebase, no lost time incidents<br />

(LTI), no accidents happened. Moreover, during drilling of Sürmene-1 well, Logistics-Non<br />

Productive Time of the operation rated as 0%.<br />

In this work, Shorebase activities conducted fully complying with offshore industry standards<br />

during Sürmene-1 well is assessed and key factors of such kind of successful operation is<br />

defined.<br />

351

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!