Turkish Petroleum Overseas Company (TPOC)’in Libya Murzuk Basenindeki Sondaj Faaliyetleri ile Sondaj Sahasında Karşılaşılan Problemler ve Uygulanan Çözüm Yolları Ercan Hayır, Özgür Kaya Türk Petrolleri Anonim Ortakliği, Sondaj Daire Başkanliği, Ankara TPAO bağlı şirketi olan Turkish Petroleum Overseas Company (TPOC)’nin operatörlüğünde Libya Murzuq baseni Area 147/3-4 ruhsatında yürütülmekte olan arama çalışmaları 2009 yılında başlamış olup, ilk kuyu (A1-147/3) keşifle sonuçlandıktan sonra, 2010 yılında da artan bir aktivite programı ile faaliyetler devam ettirilmiştir. 2005 yılında yapılan Libya Uluslararası Ruhsat İhalesi’nde teklif verilerek kazanılan ruhsatta, farklı prospektler üzerinde kazılan toplam 11 arama kuyusundan 7’si (A1-, B1-, C1-, D1-, E1-, F1-, I1-147/3,) petrol keşfi ile sonuçlanmıştır. Murzuq sondaj sahasında karşılaşılan en ciddi sondaj güçlüğü, yüzeyde bulunan gevşek ve hareketli çöl kumunun yüzey sondajı esnasında(0-500 ft) yarattığı ciddi tehlikelerdir. Bu kısmın sondajında meydana gelen kuyu yıkılmaları ve tam kaçaklar bu bölge baseninde sondaj yapan firmaların karşılaştıkları en ciddi problemlerdir. Daha önce bazı firmaların sondajlarında kule devrilmesine varan platform altında kuyu yıkılması ve lokasyon çöküntüsü sebebiyetli sorunlar yaşanmıştır. Bu kaçaklı bölge, yöreye özgü kaçakla mücadele yöntemleri uygulanarak maksimum tek tapa çimento operasyonu veya çimento yapılmaksızın geçilerek zaman ve maliyet tasarrufu yapılmıştır. Bu çalışmada TPOC ‘ un Libya’ daki sondaj faaliyetleri ile Murzuq sondaj sahasında karşılaşılan problemler ve uygulanan çözüm yolları anlatılacaktır. Anahtar Kelimeler: TPAO, TPOC, Libya, Murzuq, gevşek ve hareketli çöl kumunda sondaj operasyonları, Çamur kaçağı, Kuyu stabilitesi, Kaçak malzemeleri 194

Drilling Operations of Turkish Petroleum Overseas Company (TPOC) in Murzuq Basin, Libya and The Drilling Problems and Solutions in Loose Desert Sand Ercan Hayır, Özgür Kaya Turkish Petroleum Corporation , Drilling Department, Ankara Turkish Petroleum Overseas Company (TPOC), a wholly-owned subsidary of Turkiye Petrolleri Anonim Ortakligi (TPAO) is the 100 % holder and operator in the Area 147/3-4, Murzuq basin, Libya. TPOC was awarded the concession in the EPSA IV Bid Round II in 2005. The exploration campaign in 147 3/&4 Concession in Murzuq Basin, Libya, commenced in 2009 with the drilling of A1-147/3 well and resulted with a discovery, thus the drilling campaign intensified in 2010. Out of 11 exploration wells drilled in the concession, 7 wells (A1-, B1-, C1-, D1-, E1-,F1-, I1- 147/3) resulted as oil discoveries. The most serious difficulty which was encountered during drilling operations in Murzuq basin, is the serious threats of the loose and active desert sand on the surface (0-500 ft). During the drilling of this section, some problems such as; total mud losses, wellbore instabilities and also some cavities and collapses in the wells were encountered by companies. Previously, some companies experienced location collapses and big cavities under the rig floor that caused to fall over of the rigs. In this section, TPOC use some regional lost circulation materials and methods and drill this section with maximum one cement plug operation and save money and time. In this study, drilling operations of Turkish Petroleum Overseas Company (TPOC) in Murzuq basin, Libya and the drilling problems and solutions in loose desert sand will be discussed. Keywords: TPAO, TPOC, Libya, Murzuq, Drilling operations in loose and active desert sand, mud loss, wellbore stability, Lost Circulation Materials 195

Turkish Petroleum Overseas Company (TPOC)’in Libya Murzuk Basenindeki<br />

Sondaj Faaliyetleri ile Sondaj Sahasında Karşılaşılan Problemler ve Uygulanan<br />

Çözüm Yolları<br />

Ercan Hayır, Özgür Kaya<br />

Türk Petrolleri Anonim Ortakliği, Sondaj Daire Başkanliği, Ankara<br />

TPAO bağlı şirketi olan Turkish Petroleum Overseas Company (TPOC)’nin operatörlüğünde<br />

Libya Murzuq baseni Area 147/3-4 ruhsatında yürütülmekte olan arama çalışmaları 2009<br />

yılında başlamış olup, ilk kuyu (A1-147/3) keşifle sonuçlandıktan sonra, 2010 yılında da artan<br />

bir aktivite programı ile faaliyetler devam ettirilmiştir. 2005 yılında yapılan Libya Uluslararası<br />

Ruhsat İhalesi’nde teklif verilerek kazanılan ruhsatta, farklı prospektler üzerinde kazılan toplam<br />

11 arama kuyusundan 7’si (A1-, B1-, C1-, D1-, E1-, F1-, I1-147/3,) petrol keşfi ile sonuçlanmıştır.<br />

Murzuq sondaj sahasında karşılaşılan en ciddi sondaj güçlüğü, yüzeyde bulunan gevşek ve<br />

hareketli çöl kumunun yüzey sondajı esnasında(0-500 ft) yarattığı ciddi tehlikelerdir. Bu kısmın<br />

sondajında meydana gelen kuyu yıkılmaları ve tam kaçaklar bu bölge baseninde sondaj yapan<br />

firmaların karşılaştıkları en ciddi problemlerdir. Daha önce bazı firmaların sondajlarında kule<br />

devrilmesine varan platform altında kuyu yıkılması ve lokasyon çöküntüsü sebebiyetli sorunlar<br />

yaşanmıştır. Bu kaçaklı bölge, yöreye özgü kaçakla mücadele yöntemleri uygulanarak maksimum<br />

tek tapa çimento operasyonu veya çimento yapılmaksızın geçilerek zaman ve maliyet tasarrufu<br />

yapılmıştır. Bu çalışmada TPOC ‘ un Libya’ daki sondaj faaliyetleri ile Murzuq sondaj sahasında<br />

karşılaşılan problemler ve uygulanan çözüm yolları anlatılacaktır.<br />

Anahtar Kelimeler: TPAO, TPOC, Libya, Murzuq, gevşek ve hareketli çöl kumunda sondaj<br />

operasyonları, Çamur kaçağı, Kuyu stabilitesi, Kaçak malzemeleri<br />